| ASBESTOS WORKER/HEAT & FROST INSULATOR | 31.97 | 14.00 | 45.97 |
| BRICKLAYER | 33.67 | 19.48 | 53.15 |
| TILE SETTER | 26.47 | 14.89 | 41.36 |
| CARPENTER, INCLUDING FORMWORK (PROJECTS UNDER $1.5 MILLION) | 33.05 | 21.85 | 54.90 |
| CARPENTER, INCLUDING FORMWORK (PROJECTS $1.5 MILLION AND OVER) | 36.57 | 21.85 | 58.42 |
| CARPENTER (FLOOR LAYER) (VINYL INSTALLATION ONLY) | 40.08 | 21.85 | 61.93 |
| ELECTRICIAN | 32.40 | 19.11 | 51.51 |
| ELEVATOR MECHANIC. FOOTNOTES: A) EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR LESS THAN 5 YEARS OF SERVICE B) EIGHT PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY FRIDAY AFTER THANKSGIVING DAY, VETERANS' DAY AND CHRISTM | 62.73 | 38.44 | 101.17 |
| POWER EQUIPMENT OPERATOR: ROLLER | 39.06 | 30.38 | 69.44 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | 39.06 | 30.38 | 69.44 |
| POWER EQUIPMENT OPERATOR: (PAVER) | 39.06 | 30.38 | 69.44 |
| POWER EQUIPMENT OPERATOR: (LOADER) | 39.06 | 30.38 | 69.44 |
| POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE) | 39.06 | 30.38 | 69.44 |
| IRONWORKER: REINFORCING AND STRUCTURAL | 41.67 | 31.25 | 72.92 |
| LABORER (BRICK MASON TENDER) | 32.23 | 15.91 | 48.14 |
| CEMENT MASON/CONCRETE FINISHER | 36.63 | 9.85 | 46.48 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | 50.66 | 23.34 | 74.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | 52.60 | 29.93 | 82.53 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | 50.66 | 23.34 | 74.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | 52.60 | 29.93 | 82.53 |
| ROOFER | 32.25 | 17.46 | 49.71 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 45.94 | 27.53 | 73.47 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | 34.43 | 17.86 | 52.29 |
| TRUCK DRIVER: DUMP TRUCK | 25.57 | — | 25.57 |
| PAINTER: SPRAY | 18.79 | 8.12 | 26.91 |
| PAINTER: ROLLER | 16.44 | 6.01 | 22.45 |
| PAINTER: BRUSH ONLY | 16.44 | 6.01 | 22.45 |
| OPERATOR: GRADER/BLADE | 22.80 | 10.78 | 33.58 |
| LABORER: COMMON OR GENERAL | 25.00 | — | 25.00 |