Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 43.48 | 27.24 | 70.72 |
| BRICKLAYER | 41.15 | 23.90 | 65.05 |
| TILE SETTER | 34.09 | 19.91 | 54.00 |
| CARPENTER, EXCLUDES FORM WORK | 35.49 | 21.85 | 57.34 |
| ELECTRICIAN | 37.60 | 22.14 | 59.74 |
| POWER EQUIPMENT OPERATOR: ROLLER | 39.06 | 30.38 | 69.44 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | 39.06 | 30.38 | 69.44 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | 39.06 | 30.38 | 69.44 |
| POWER EQUIPMENT OPERATOR: (PAVER) | 39.06 | 30.38 | 69.44 |
| POWER EQUIPMENT OPERATOR: (LOADER) | 39.06 | 30.38 | 69.44 |
| IRONWORKER: REINFORCING AND STRUCTURAL | 41.67 | 31.25 | 72.92 |
| LABORER (LANDSCAPE) | 27.71 | 15.50 | 43.21 |
| LABORER (BRICK MASON TENDER) | 29.71 | 15.50 | 45.21 |
| PAINTER (BRUSH & ROLLER ONLY) | 28.75 | 12.58 | 41.33 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | 50.66 | 23.34 | 74.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | 52.60 | 29.93 | 82.53 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | 50.66 | 23.34 | 74.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | 52.60 | 29.93 | 82.53 |
| ROOFER | 33.60 | 19.99 | 53.59 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | 52.00 | 27.12 | 79.12 |
| TRUCK DRIVER: DUMP TRUCK | 28.92 | — | 28.92 |
| PAINTER: SPRAY | 18.79 | 8.12 | 26.91 |
| OPERATOR: BACKHOE/TRACKHOE | 31.12 | — | 31.12 |
| LABORER: COMMON OR GENERAL | 22.23 | — | 22.23 |
| GLAZIER | 14.19 | 5.19 | 19.38 |
| FORM WORKER | 26.44 | — | 26.44 |
| CEMENT MASON/CONCRETE FINISHER | 18.86 | 7.50 | 26.36 |