Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 40.74 | 32.59 | 73.33 |
| BOILERMAKER | 43.50 | 36.74 | 80.24 |
| BRICKLAYER | 41.66 | 26.53 | 68.19 |
| TILE FINISHER | 33.50 | 23.52 | 57.02 |
| TILE SETTER | 40.53 | 23.62 | 64.15 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION & SCAFFOLD BUILDING) | 42.44 | 31.43 | 73.87 |
| CARPENTER (FLOOR LAYER - CARPET, RESILIENT, & VINYL FLOORING) | 36.76 | 21.11 | 57.87 |
| MILLWRIGHT | 42.92 | 39.13 | 82.05 |
| ELECTRICIAN | 51.32 | 28.54 | 79.86 |
| ELECTRICIAN, LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS (TECHNICIAN) | 39.93 | 17.97 | 57.90 |
| ELEVATOR MECHANIC FOOTNOTES: A. PAID HOLIDAYS NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY B. EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OF 6% BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT | 65.01 | 38.44 | 103.45 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 51.29 | 25.35 | 76.64 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 48.79 | 25.35 | 74.14 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 48.29 | 25.35 | 73.64 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 47.99 | 25.35 | 73.34 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 47.17 | 25.35 | 72.52 |
| FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 46.31 | 25.35 | 71.66 |
| FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 45.34 | 25.35 | 70.69 |
| STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 43.63 | 25.35 | 68.98 |
| FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 35.29 | 25.35 | 60.64 |
| IRONWORKER: REINFORCING | 36.55 | 33.37 | 69.92 |
| IRONWORKER: STRUCTURAL | 36.55 | 35.93 | 72.48 |
| IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) | 30.02 | 27.43 | 57.45 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS & CEILINGS) | 39.08 | 15.92 | 55.00 |
| LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | 29.93 | 9.10 | 39.03 |
| LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | 27.71 | 9.10 | 36.81 |
| LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE; PIPELAYER; SANDBLASTER) | 38.00 | 18.25 | 56.25 |
| PAINTER: SPRAY | 26.86 | 17.66 | 44.52 |
| PAINTER: BRUSH AND ROLLER | 32.85 | 20.41 | 53.26 |
| PAINTER: DRYWALL FINISHING/TAPING | 32.85 | 20.41 | 53.26 |
| GLAZIER PAID HOLIDAYS: NEW YEAR'S DAY, DECORATION DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS WORKED THE LAST FULL REGULAR SCHEDULED WORK DAY PRIOR TO THE HOLIDAY, AND THE FIRST FULL REGULAR SCHEDULED WORK DAY FOLLOWING THE HOLIDAY, PROVIDED THE EMPLOYEE IS PHYSICALLY ABLE TO WORK | 42.00 | 25.55 | 67.55 |
| CEMENT MASON/CONCRETE FINISHER | 30.63 | 14.07 | 44.70 |
| PLASTERER | 30.63 | 14.07 | 44.70 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | 45.34 | 37.21 | 82.55 |
| PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION | 45.96 | 43.90 | 89.86 |
| ROOFER | 42.68 | 28.75 | 71.43 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 53.57 | 33.95 | 87.52 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION) | 42.51 | 35.77 | 78.28 |
| INSTALLER - OVERHEAD DOOR | 27.98 | — | 27.98 |
| IRONWORKER, ORNAMENTAL | 18.48 | 7.93 | 26.41 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | 13.57 | 1.18 | 14.75 |
| $456.70 PER WEEK, PLUS $67.10 PER DAY | 31.03 | 0.70 | 31.73 |
| MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME FOOTNOTE: A. $456.70 PER WEEK, PLUS $67.10 PER DAY | 31.18 | 0.70 | 31.88 |
| TRUCK DRIVER: GROUP 3 LOWBOY PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME. FOOTNOTE: A. $456.70 PER WEEK, PLUS $67.10 PER DAY | 31.28 | 0.70 | 31.98 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (MACOMB & WAYNE COUNTIES) | 40.74 | 32.59 | 73.33 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (LAPEER & LIVINGSTON COUNTIES) | 40.00 | 23.65 | 63.65 |
| TILE SETTER (MACOMB & WAYNE COUNTIES) | 40.53 | 23.62 | 64.15 |
| TILE SETTER (LAPEER & LIVINGSTON COUNTIES) | 26.93 | 18.69 | 45.62 |
| CARPENTER, INCLUDES FLOOR LAYING-CARPET (EXCLUDES FORMWORK) (LAPEER COUNTY) | 36.46 | 22.69 | 59.15 |
| CARPENTER, INCLUDES FLOOR LAYING-CARPET (EXCLUDES FORMWORK) (LIVINGSTON COUNTY (TOWNSHIPS OF COHOCTAH, CONWAY, HANDY, HOWELL, IOSCO & MARION)) | 36.21 | 21.06 | 57.27 |
| CARPENTER, INCLUDES FLOOR LAYING-CARPET (EXCLUDES FORMWORK): SINGLE-FAMILY HOMES AND DETATCHED CONDOMINIUMS (LIVINGSTON (TOWNSHIPS OF BRIGHTON, DEERFIELD, GENOE & HARTLAND), MACOMB & WAYNE COUNTIES) | 29.19 | 15.76 | 44.95 |
| CARPENTER, INCLUDES FLOOR LAYING-CARPET (EXCLUDES FORMWORK): MULTI-FAMILY CONDOMINIUMS (LIVINGSTON (TOWNSHIPS OF BRIGHTON, DEERFIELD, GENOE & HARTLAND), MACOMB & WAYNE COUNTIES) | 31.58 | 16.27 | 47.85 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING (LIVINGSTON (TOWNSHIPS OF BRIGHTON, DEERFIELD, GENOA, HARTLAND, OCEOLA AND TYRONE), MACOMB & WAYNE COUNTIES) | 29.42 | 16.50 | 45.92 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING (LIVINGSTON COUNTY (TOWNSHIPS OF GREEN OAK, HAMBURG, PUTNAM AND UNADILLA)) | 36.65 | 20.38 | 57.03 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING (LIVINGSTON COUNTY (TOWNSHIPS OF COHOCTAH, CONWAY, HANDY, HOWELL, IOSCO AND MARION)) | 31.20 | 10.97 | 42.17 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING (LAPEER COUNTY) | 35.62 | 13.70 | 49.32 |
| ELEVATOR MECHANIC (MACOMB & WAYNE COUNTIES) FOOTNOTE: VACATION PAY: 8% WITH 5 OR MORE YEARS OF SERVICE, 6% FOR 6 MONTHS TO 5 YEARS SERVICE PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND FRIDAY AFTER, AND CHRISTMAS DAY | 65.01 | 38.44 | 103.45 |
| ELEVATOR MECHANIC (LAPEER & LIVINGSTON COUNTIES) FOOTNOTE: A.VACATION PAY: 8% WITH 5 OR MORE YEARS OF SERVICE, 6% FOR 6 MONTHS TO 5 YEARS SERVICE. B.PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND FRIDAY AFTER, AND CHRISTMAS DAY | 65.45 | 38.44 | 103.89 |
| LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | 45.34 | 25.35 | 70.69 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | 46.31 | 25.35 | 71.66 |
| OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER (MACOMB & WAYNE COUNTIES) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | 47.17 | 25.35 | 72.52 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (MACOMB & WAYNE COUNTIES) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | 47.99 | 25.35 | 73.34 |
| OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (MACOMB & WAYNE COUNTIES) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | 48.29 | 25.35 | 73.64 |
| OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER (MACOMB & WAYNE COUNTIES) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | 49.79 | 25.35 | 75.14 |
| OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER (MACOMB & WAYNE COUNTIES) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | 51.29 | 25.35 | 76.64 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/ SKID LOADER (LAPEER & LIVINGSTON COUNTIES) FOOTNOTES CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 41.32 | 25.25 | 66.57 |
| OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; GRADER/BLADE; LOADER; AND SCRAPER (LAPEER & LIVINGSTON COUNTIES) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 44.00 | 25.25 | 69.25 |
| AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 45.68 | 25.25 | 70.93 |
| OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. (LAPEER & LIVINGSTON COUNTIES) FOOTNOTES CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 48.98 | 25.25 | 74.23 |
| IRONWORKER, STRUCTURAL | 36.55 | 35.93 | 72.48 |
| LANDSCAPE LABORER: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | 27.71 | 9.10 | 36.81 |
| LABORER: COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE (LIVINGSTON COUNTY) | 38.11 | 15.45 | 53.56 |
| LABORER: COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE (LAPEER COUNTY) | 29.46 | 16.10 | 45.56 |
| LABORER: COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE (LIVINGSTON COUNTY (NORTH OF HIGHWAY M-59 AND EAST OF OAK GROVE ROAD)) | 38.00 | 18.25 | 56.25 |
| LABORERS: COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE (MACOMB AND WAYNE COUNTIES) | 38.00 | 18.25 | 56.25 |
| PAINTER: BRUSH AND ROLLER (LIVINGSTON (EAST OF HOWELL, NORTH TO GENESEE COUNTY & SOUTH TO WASHTENAW COUNTY), MACOMB & WAYNE COUNTIES) | 20.14 | 14.72 | 34.86 |
| PAINTER: BRUSH AND ROLLER (LIVINGSTON COUNTY (CITY OF HOWELL & WEST OF HOWELL, NORTH TO GENESEE COUNTY & SOUTH TO WASHTENAW COUNTY)) | 21.84 | 18.63 | 40.47 |
| PAINTER: BRUSH AND ROLLER (LAPEER COUNTY (WEST OF HWY. M-53)) | 22.25 | 11.10 | 33.35 |
| PAINTER: BRUSH AND ROLLER (LAPEER COUNTY (EAST OF HWY. M-53)) | 23.79 | 12.02 | 35.81 |
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (LIVINGSTON (TOWNSHIP OF BRIGHTON), MACOMB & WAYNE COUNTIES) | 27.06 | 23.52 | 50.58 |
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (LIVINGSTON COUNTY (TOWNSHIPS OF GREEN OAK AND HAMBURG)) | 42.26 | 23.70 | 65.96 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY (LIVINGSTON COUNTY (TOWNSHIPS OF GREEN OAK AND HAMBURG)) | 44.31 | — | 44.31 |
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (LIVINGSTON COUNTY (EXCEPT THE TOWNSHIPS OF BRIGHTON, GREEN OAK AND HAMBURG):) | 31.35 | 22.90 | 54.25 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY (LIVINGSTON COUNTY (EXCEPT THE TOWNSHIPS OF BRIGHTON, GREEN OAK AND HAMBURG):) | 31.35 | 22.90 | 54.25 |
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (LAPEER COUNTY) | 26.46 | 20.60 | 47.06 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY (LAPEER COUNTY) | 26.46 | 20.60 | 47.06 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY (LIVINGSTON (TOWNSHIP OF BRIGHTON), MACOMB & WAYNE COUNTIES) | 41.61 | 29.35 | 70.96 |
| ROOFER (LIVINGSTON COUNTY) | 42.67 | 21.62 | 64.29 |
| ROOFER (LAPEER COUNTY) | 30.38 | 19.87 | 50.25 |
| ROOFER (MACOMB & WAYNE COUNTIES) | 42.68 | 28.75 | 71.43 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION (LAPEER COUNTY) | 24.88 | 8.76 | 33.64 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION (LIVINGSTON COUNTY) | 32.00 | 10.73 | 42.73 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION (MACOMB & WAYNE COUNTIES) | 28.67 | 9.50 | 38.17 |
| TRUCK DRIVER: DUMP TRUCK | 17.00 | 5.71 | 22.71 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 22.32 | 4.51 | 26.83 |
| LABORER: PIPELAYER | 17.99 | 5.46 | 23.45 |
| GLAZIER | 23.00 | 8.17 | 31.17 |
| CEMENT MASON/CONCRETE FINISHER | 19.27 | 5.85 | 25.12 |
| $438.45 PER WEEK, PLUS $64.50 PER DAY | 31.03 | 0.70 | 31.73 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 43.50 | 36.74 | 80.24 |
| PILEDRIVERMAN | 38.48 | 30.22 | 68.70 |
| CARPENTER, INCLUDES FORM WORK | 42.44 | 31.43 | 73.87 |
| LINE CONSTRUCTION: LINEMEN/CABLE SPLICER | 61.06 | 25.11 | 86.17 |
| ELECTRICIAN | 51.32 | 28.54 | 79.86 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | 39.95 | 25.25 | 65.20 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | 40.52 | 25.25 | 65.77 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | 41.25 | 25.25 | 66.50 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT DIGGING CAPACITY) | 45.98 | 25.25 | 71.23 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 9 OILER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | 35.29 | 25.35 | 60.64 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 8 FORKLIFT FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | 43.63 | 25.35 | 68.98 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 7 BACKHOE/EXCAVATOR, BOBCAT/SKID LOADER, BORING MACHINE, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, LOADER, ROLLER, SCRAPER, TRACTOR, TRENCHER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | 45.34 | 25.35 | 70.69 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 REGULAR CRANE OPERATOR FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | 46.31 | 25.35 | 71.66 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 CRANE WITH BOOM & JIB OR LEADS 120' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | 47.17 | 25.35 | 72.52 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 CRANE WITH BOOM & JIB OR LEADS 140' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | 47.99 | 25.35 | 73.34 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 CRANE WITH BOOM & JIB OR LEADS 220' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | 48.29 | 25.35 | 73.64 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE WITH BOOM & JIB OR LEADS 300' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | 49.79 | 25.35 | 75.14 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE WITH BOOM & JIB OR LEADS 400' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | 51.29 | 25.35 | 76.64 |
| IRONWORKER: STRUCTURAL | 36.55 | 35.93 | 72.48 |
| IRONWORKER: REINFORCING | 36.55 | 33.37 | 69.92 |
| LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | 27.71 | 9.10 | 36.81 |
| LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | 29.93 | 9.10 | 39.03 |
| LABORER ((5) PIPELAYER) | 24.17 | 16.95 | 41.12 |
| LABORER ((4) GRADE CHECKER) | 24.11 | 16.95 | 41.06 |
| LABORERS: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION) | 38.00 | 18.25 | 56.25 |
| PAINTER: SPRAY | 25.86 | 14.75 | 40.61 |
| PAINTER: BRUSH & ROLLER | 25.06 | 14.75 | 39.81 |
| CEMENT MASON/CONCRETE FINISHER | 30.63 | 14.07 | 44.70 |
| PLUMBER | 35.77 | 35.13 | 70.90 |
| PIPEFITTER | 40.41 | 29.35 | 69.76 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | 20.82 | 3.69 | 24.51 |
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY | 33.65 | 0.75 | 34.40 |
| TRUCK DRIVER: DUMP TRUCK, 8 CU. YDS. AND OVER | 33.50 | 0.75 | 34.25 |
| TRUCK DRIVER: DUMP TRUCK UNDER 8 CU. YDS.; TRACTOR HAUL TRUCK FOOTNOTE: A. $470.70 PER WEEK. B $68.70 DAILY | 33.40 | 0.75 | 34.15 |