Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE, & MECHANICAL SYSTEM INSULATION) | 49.10 | 36.63 | 85.73 |
| TILE SETTER | 64.52 | 37.51 | 102.03 |
| TILE FINISHER | 49.32 | 35.26 | 84.58 |
| BRICKLAYER (INCLUDES POINTING, CAULKING, CLEANING, AND WATERPROOFING) | 62.36 | 36.80 | 99.16 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, METAL BUILDING-METAL SIDING/WALL PANELS, METAL STUD INSTALLATION, SCAFFOLD BUILDING, FIREPROOFER, WINDOW AND CURTAIN WALL INSTALLATION) | 50.10 | 31.45 | 81.55 |
| ELECTRICIAN (LOW VOLTAGE WIRING) | 36.12 | 34.51 | 70.63 |
| ELECTRICIAN (INCLUDES HVAC/TEMPERATURE CONTROLS INSTALLATION) | 48.16 | 36.20 | 84.36 |
| ELEVATOR MECHANIC FOOTNOTE: A.VACATION 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | 66.41 | 38.44 | 104.85 |
| POWER EQUIPMENT OPERATOR: GROUP 1B BACKHOE/EXCAVATOR/TRACKHOE, LOADER FOOTNOTE: A PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, LABOR DAY, VETERSNS DAY; THANKSGIVING DAY AND CHRISTMAS DAY | 57.83 | 33.70 | 91.53 |
| POWER EQUIPMENT OPERATOR GROUP 2: BULLDOZER | 57.18 | 33.70 | 90.88 |
| IRONWORKER (ORNAMENTAL, REINFORCING, AND STRUCTURAL) | 57.57 | 37.67 | 95.24 |
| LABORER: MASON TENDER-BRICK | 38.95 | 29.81 | 68.76 |
| PAINTER (BRUSH/ROLLER, INCLUDING DRYWALL FINISHER/TAPER) | 46.26 | 36.00 | 82.26 |
| PLUMBER/PIPEFITTER (INCLUDES HVAC PIPE AND UNIT INSTALLATION) | 55.00 | 31.57 | 86.57 |
| ROOFER | 53.53 | 35.69 | 89.22 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT AND UNIT INSTALLATION) | 43.48 | 36.46 | 79.94 |
| LABORER: COMMON OR GENERAL | 39.84 | 12.04 | 51.88 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER, PLASTERER, STONEMASON (LOWELL CHAPTER MIDDLESEX COUNTY (ACTON, ASBY, ASHLAND, AYER, BEDFORD, BILLERICA, BOXBORO, CARLISLE, CHEMSFORD, DRACUT, DUNSTABLE, FRAMINGHAM, FT. DEVENS, GROTON, HOLLISTON, HOPKINTON, HUDSON, LITTLETON, LOWELL, MAYNARD, NATICK, NORTH ACTON, PEPPERELL, SHERBORN, SHIRLEY, SOUTH ACTON, STOW, TEWKSBURY, TOWNSEND, TYNGSBORO, WEST ACTON, WESTFORD, WILMINGTON) NORFOLK (MEDFIELD, MEDWAY, MILLS) WORCESTER (ASHBUMHAM, ATHOL, FITCHBURG, GARDNER, HARVARD, HOPEDALE, HUBBAR | 62.40 | 34.40 | 96.80 |
| BRICKLAYER, PLASTERERS, STONEMASONS, TILE LAYERS (SPRINGFIELD/PITTSFIELD CHAPTER BERKSHIRE, HAMPDEN, HAMPSHIRE, WORCESTER (WARREN) COUNTIES) | 50.81 | 32.27 | 83.08 |
| BRICKLAYER, PLASTERER, STONEMASON (WORCESTER CHAPTER (AUBURN, BARRE, BLACKSTONE, BERLIN, BOLTON, BOYLSTON, BROOKFIELD, CHARLTON, CLINTON, DOUGLAS, DUDLEY, GRAFTON, HARDWICK, HOLDEN, LEICESTER, MENDON, MILLBURY, MILLVILLE, NEW BRAINTREE, NORTHBORO, NORTHBRIDGE, OAKHAM, OXFORD, PAXTON, RUTLAND, SHREWBURY, SOUTHBRIDGE, SPENCER, STURBRIDGE, SUTTON, UPTON, UXBRIDGE, WEBSTER, WESTBORO, WEST BOYLSTON, WORCESTER)) | 60.26 | 33.71 | 93.97 |
| BRICKLAYER (BOSTON CHAPTER MIDDLESEX (ARLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, SOMERVILLE) NORFOLK (BROOKLINE, MILTON) SUFFOLK) | 64.50 | 37.54 | 102.04 |
| BRICKLAYER, PLASTERER (LYNN CHAPTER ESSEX (AMESBURY, ANDOVER, BEVERLY, BOXFORD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, HAVERHILL, IPSEWICH, LAWRENCE, LYNN, LYNNFIELD, MANCHESTER, NAHANT, NEWBURY, NEWBURYPORT, NORTH ANDOVER, PEABODY, ROCKPORT, ROWLEY, SALISBURY, SALEM, SAUGUS, SWAMPSCOTT, TOPSFIELD, WAKEFIELD, WENHAM, WEST NEWBURY) MIDDLESEX (READING, NORTH READING, WAKEFIELD)) | 64.50 | 37.54 | 102.04 |
| BRICKLAYER, PLASTERER (NEWTON CHAPTER MIDDLESEX (NEWTON); NORFOLK (DOVER, NEEDHAM, WELLESLEY)) | 64.50 | 37.54 | 102.04 |
| BRICKLAYER (NEW BEDFORD CHAPTER BARNSTABLE, BRISTOL (ACUSHNET, DARMOUTH, FAIRHAVE, FALL RIVER, FREETOWN, NEW BEDFORD, SOMERSET, SWANSEA, WESTPORT) PLYMOUTH (MARION, MATTAPOISETT, ROCHESTER, WAREHAM)) | 64.50 | 37.54 | 102.04 |
| BRICKLAYER, PLASTERER (QUINCY CHAPTER NORFOLK (AVON, BRAINTREE, COHASSET, HOLBROOK, QUINCY, RANDOLPH, STOUGHTON, WEYMOUTH) PLYMOUTH (ABINGTON, BRIDGEWATER, BROCKTON, CARVER, DUXBURY, EAST BRIDGEWATER, HALIFAX, HANOVER, HANSON, HINGHAM, HULL, KINGSTON, MARSHFIELD, MIDDLEBORO, NORWELL, PEMBROKE, PLYMOUTH, ROCKLAND, SCITUATE, WEST BRIDGEWATER, WHITMAN)) | 64.50 | 37.54 | 102.04 |
| BRICKLAYER, PLASTERER (WALTHAM CHAPTER MIDDLESEX (BELMONT, BURLINGTON, CONCORD, LIXINGTON, LINCOLN, STONEHAM, SUDBURY, WALTHAM, WATERTOWN, WAYLAND, WESTON, WINCHESTER, WOBURN)) | 64.50 | 37.54 | 102.04 |
| TILE LAYER (BARNSTABLE, BRISTOL, SUFFOLK AND WORCESTER) | 64.50 | 37.54 | 102.04 |
| CARPENTERS (INCLUDING DRYWALL HANGING & ACOUSTICAL CEILING INSTALLATION) (MIDDLESEX (BELMONT, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, SOMERVILLE) NORFOLK (BROOKLINE, DEDHAM, MILTON) AND SUFFOLK) | 61.19 | 31.55 | 92.74 |
| CARPENTERS (INCLUDING DRYWALL HANGING & ACOUSTICAL CEILING INSTALLATION) (WORCESTER COUNTY (EXCEPT GILBERTVILLE, HARDWICK, WARREN, WEST BROOKFIELD)) | 50.10 | 31.45 | 81.55 |
| CARPENTERS (INCLUDING DRYWALL HANGING & ACOUSTICAL CEILING INSTALLATION) (BERKSHIRE, HAMPDEN, HAMPSHIRE AND WORCESTER (GILBERTVILLE, HARDWICK, WARREN, WEST BROOKFIELD)) | 43.33 | 27.82 | 71.15 |
| CARPENTERS (INCLUDING DRYWALL HANGING & ACOUSTICAL CEILING INSTALLATION) (BRISTOL (ATTLEBOROUGH, NORTH ATTLEBOROUGH) ESSEX, MIDDLESEX (EXCEPT BELMONT, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, SOMERVILLE) NORFOLK (BELLINGHAM, CANTON, FOXBORO, FRANKLIN, MEDFIELD, MEDWAY, MILLIS, NEEDHAM, NORFOLK, NORWOOD, PLAINVILLE, QUINCY, SHARON, WALPOLE, WELLESLEY, WESTWOOD, WRENTHAM) AND PLYMOUTH (DUXBURY, HANOVER, HINGHAM, HULL, MARSHFIELD, NORWELL, PEMBROKE, ROCKLAND AND SCITUATE)) | 50.10 | 31.45 | 81.55 |
| CARPENTERS (INCLUDING DRYWALL HANGING & ACOUSTICAL CEILING INSTALLATION) (BARNSTABLE, BRISTOL (EXCEPT ATTLEBORO AND NORTH ATTLEBORO) AND PLYMOUTH (BRIDGEWATER, BROCKTON, KINGSTON, LAKEVILLE, MIDDLEBORO, PLYMOUTH, SOUTH HANOVER, WHITMAN)) | 39.28 | 27.90 | 67.18 |
| CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT: WOOD FRAMING, SIDING AND EXTERIOR TRIM WORK (ZONE 2 BARNSTABLE, BERKSHIRE, BRISTOL, ESSEX, HAMPDEN, HAMPSHIRE, PLYMOUTH, WORCESTER COUNTIES AND PART OF MIDDLESEX, NORFOLK AND SUFFOLK COUNTIES (ALL OTHER CITIES AND TOWNS IN MASSACHUSETTS + CHELSEA & WINTHROP)) | 26.55 | 13.02 | 39.57 |
| CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT: ALL OTHER CARPENTRY WORK ON WOOD FRAME PROJECTS (ZONE 2 BARNSTABLE, BERKSHIRE, BRISTOL, ESSEX, HAMPDEN, HAMPSHIRE, PLYMOUTH, WORCESTER COUNTIES AND PART OF MIDDLESEX, NORFOLK AND SUFFOLK COUNTIES (ALL OTHER CITIES AND TOWNS IN MASSACHUSETTS + CHELSEA & WINTHROP)) | 26.55 | 13.02 | 39.57 |
| ELECTRICIAN (HAMPDEN (EXCEPT CHESTER AND HOLYOKE); HAMPSHIRE (BELCHERTOWN, WARE)) | 52.16 | 29.56 | 81.72 |
| TELEDATA SYSTEM INSTALLER: BERKSHIRE COUNTY | 52.16 | 29.56 | 81.72 |
| ELECTRICIAN (BERKSHIRE; HAMPDEN (CHESTER, HOLYOKE); HAMPSHIRE (EXCEPT BELCHERTOWN, WARE)) | 52.16 | 29.56 | 81.72 |
| TELEDATA SYSTEM INSTALLER (MIDDLESEX (ASHBY, ASHLAND, AYER, FT. DEVENS, GROTON, HOPKINTON, HUDSON, MARLBORO, PEPPERELL, SHIRLEY, STOW, TOWNSEND); WORCESTER (EXCEPT WARREN)) | 36.12 | 34.51 | 70.63 |
| ELECTRICIAN (MIDDLESEX (ASHBY, ASHLAND, AYER, FT DEVENS, GROTON, HOPKINTON, HUDSON, MARLBORO, PEPPERELL, SHIRLEY, STOW, TOWNSEND); WORCESTER (EXCEPT WARREN)) | 48.16 | 36.20 | 84.36 |
| ELECTRICIAN (WORCESTER (WARREN)) | 48.16 | 36.20 | 84.36 |
| ELECTRICIAN (BRISTOL (NORTH & SOUTH ATTLEBORO, SEEKONK)) | 56.11 | 24.74 | 80.85 |
| ELECTRICIAN (ESSEX (AMESBURY, ANDOVER, BOXFORD, GEORGETOWN, GROVELAND, HAVERHILL, LAWRENCE, MERRIMAC, METHUEN, NEWBURY, NEWBURYPORT, NORTH ANDOVER, ROWLEY, SALISBURY, WEST NEWBURY); MIDDLESEX (BEDFORD, BILLERICA, BOXBORO, BURLINGTON, CARLISLE, CHELMSFORD, DRACUT, DUNSTABLE LITTLETON, LOWELL, NORTH READING, TEWKSBURY, TYNGSBORO, WESTFORD, WILMINGTON)) | 66.17 | 37.08 | 103.25 |
| ELECTRICIAN (ESSEX (BEVERLY, DANVERS, ESSEX, GLOUCESTER, HAMILTON, IPSWICH, MANCHESTER, MARBLEHEAD, MIDDLETON, PEABODY, ROCKPORT, SALEM, TOPSFIELD, WENHAM)) | 66.17 | 37.08 | 103.25 |
| TELEDATA SYSTEM INSTALLER: ESSEX; MIDDLESEX {EXCLUDING ASHBY, ASHLAND, AYER, FT. DEVENS, GROTON, HOKINTON, HUDSON, MARLBORO, PEPPERELL, SHIRLEY, STOW, TOWNSEND}; NORFOLK {EXCLUDING AVON, HOLBROOK, PLAINVILLE, RANDOLPH, STOUGHTON}; SUFFOLK (ESSEX (LYNN, LYNNFIELD, NAHANT, SAUGUS, SWAMPSCOTT); MIDDLESEX (ACTON, ARLINGTON, BELMONT, CAMBRIDGE, CONCORD, EVERETT, FRAMINGHAM, HOLLISTON, LEXINGTON, LINCOLN, MALDEN, MAYNARD, MEDFORD, MELROSE, NATICK, NEWTON, READING, SHERBORN, SOMERVILLE, STONEHAM, SUD | 52.94 | 34.74 | 87.68 |
| ELECTRICIAN (ESSEX (LYNN, LYNNFIELD, NAHANT, SAUGUS, SWAMPSCOTT); MIDDLESEX (ACTON, ARLINGTON, BELMONT, CAMBRIDGE, CONCORD, EVERETT, FRAMINGHAM, HOLLISTON, LEXINGTON, LINCOLN, MALDEN, MAYNARD, MEDFORD, MELROSE, NATICK, NEWTON, READING, SHERBORN, SOMERVILLE, STONEHAM, SUDBURY, WAKEFIELD, WALTHAM, WATERTOWN, WAYLAND, WESTON, WINCHESTER, WOBURN); NORFOLK (BELLINGHAM, BRAINTREE, BROOKLINE, CANTON, COAHASSET, DEDHAM, DOVER, FOXBORO, FRANKLIN, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHAM, NORFOLK, NORW | 66.17 | 37.08 | 103.25 |
| TELEDATA SYSTEM INSTALLER: PLYMOUTH COUNTY (EXCEPT TOWNSHIPS OF HINGHAM AND HULL) | 42.52 | 28.47 | 70.99 |
| ELECTRICIAN (BARNSTABLE, BRISTOL (EXCEPT ATTLEBORO, NORTH ATTLEBORO, SEEKONK); NORFOLK (AVON, HALBROOK, RANDOLPH, SLOUGHTON); PLYMOUTH (EXCEPT HINGHAM AND HULL TOWNSHIPS)) | 50.02 | 31.05 | 81.07 |
| ELEVATOR MECHANIC (BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX, NORFOLK AND SUFFOLK) FOOTNOTE FOR ELEVATOR MECHANICS A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | 74.17 | 38.44 | 112.61 |
| ELEVATOR MECHANIC (BERKSHIRE, HAMPDEN AND HAMPSHIRE) FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | 66.41 | 38.44 | 104.85 |
| POWER EQUIPMENT OPERATOR: EXCAVATORS & LOADERS (BARNSTABLE; BRISTOL; ESSEX; MIDDLESEX, NORFOLK; PLYMOUTH; SUFFOLK; AND WORCESTER (REMAINDER OF COUNTY)) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 57.18 | 33.70 | 90.88 |
| POWER EQUIPMENT OPERATOR: EXCAVATORS & LOADERS (WORCESTER (ATHOL, BARRE, BROOKFIELD, EAST BROOKFIELD, HARDWICK, NEW BRAINTREE, NORTH BROOKFIELD, OAKHAM, PETERSHAM, PHLLIPSTON, ROYALSTON, STRUTHBRIDGE, TEMPLETON, WARREN, WEST BROOKFIELD, WINCHENDON)) FOOTNOTES: A. NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMBORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOTS DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 57.18 | 33.70 | 90.88 |
| POWER EQUIPMENT OPERATOR: EXCAVATORS & LOADERS (BERKSHIRE; HAMPDEN AND HAMPSHIRE COUNTIES) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 41.23 | 30.58 | 71.81 |
| LABORERS: MASON TENDER, STONE/STUCCO (BERKSHIRE, HAMPSHIRE (CHESTERFIELD, CUMMINGTON, GOSHEN, MIDDLEFIELD, PLAINFIELD AND WORTHINGTON)) | 31.54 | 25.63 | 57.17 |
| LABORERS: MASON TENDER, STONE/STUCCO (HAMPDEN, HAMPSHIRE (EXCEPT CHESTERFIELD, CUMMINGTON, GOSHEN, MIDDLEFIELD, PLAINFIELD AND WORTHINGTON)) | 32.75 | 26.02 | 58.77 |
| PAINTER: DRYWALL FINISHING ONLY (BERKSHIRE, HAMPDEN, AND HAMPSHIRE COUNTIES) | 32.33 | 26.35 | 58.68 |
| PAINTER: DRYWALL FINISHING ONLY (BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX, NORFOLK, PLYMOUTH, SUFFOLK, AND WORCESTER COUNTIES) | 39.86 | 30.25 | 70.11 |
| PLUMBERS, PIPEFITTERS (INCLUDING HVAC WORK) (MIDDLESEX (ASHBY, AYER-WEST OF GREENVILLE BRANCH OF BOSTON AND MAINE RAILROAD, FT. DEVENS, GROTON, SHIRLEY, TOWNSEND) WORCESTER (EXCEPT HOPEDALE AND SOUTHBORO)) | 55.00 | 31.57 | 86.57 |
| PLUMBER (ESSEX(AMES, ANDOVER, BEVERLY, BOXFORD, BYFIELD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, HAVERHILL, IPSWICH, LAWRENCE,MANCHESTER, MARBLEHEAD, MERRIMAC, METHUEM, MIDDLETON, NEWBURY, NEWBURYPORT, NORTH ANDOVER, PEABODY, ROCKPORT, ROWLEY, SALEM, SALISBURY, TOPSFIEILD, WENHAM, WEST NEWBURY)) | 69.84 | 36.43 | 106.27 |
| PLUMBER (ESSEX(LYNN, LYNNFIELD, NAHANT, SAUGUS, AND SWAMPSCOTT); MIDDLESEX (ACTON, ARLINGTON, ASHLAND, AYER-EXCEPT WEST OF GREENVILLE BRANCH OF BOSTON & MAINE RAIL ROAD, BEDFORD, BELMONT, BILLERICA, BOXBORO, BURLINGTON, CAMBRIDGE, CARLISLE, CHELMSFORD, CONCORD, DRACUT, DUNSTABLE, EVERETT, FRAMINGHAM, HUDSON, HOLLISTON, HOPKINTON, LEXINGTON, LINCOLN, LITTLETON, LOWELL, MALDEN, MARLBORO, MAYNARD, MEDFORD, MELROSE, NATICK, NEWTON, NORTH READING, PEPPERELL, READING, SHERBORN, SOMERVILLE, STONE | 69.84 | 36.43 | 106.27 |
| PLUMBERS, PIPEFITTERS (INCLUDING HVAC WORK) (BARNSABLE; BRISTOL; PLYMOUTH (EXCEPT HINGHAM, HULL, SCITUATE)) | 52.49 | 33.60 | 86.09 |
| PLUMBERS, PIPEFITTERS (INCLUDING HVAC WORK) (BERKSHIRE (BECKET, OTIS, SANDISFIELD); HAMPDEN; HAMPSHIRE) FOOTNOTE FOR PLUMBERS & STEAMFITTERS A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED SEVEN DAYS PRIOR TO THE HOLIDAY BY THE SAME EMPLOYER | 52.26 | 31.05 | 83.31 |
| THE HOLIDAY BY THE SAME EMPLOYER | 52.26 | 31.05 | 83.31 |
| PIPEFITTER INCLUDING HVAC WORK (ESSEX (AMES, ANDOVER, BEVERLY, BOXFORD, BYFIELD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, HAVERHILL, IPSWICH, LAWRENCE, LYNN, LYNNFIELD, MANCHESTER, MARBLEHEAD, MERRIMAC, METHUEM, MIDDLETON, NAHANT, NEWBURY, NEWBURYPORT, NORTH ANDOVER, PEABODY, ROCKPORT, ROWLEY, SALEM, SALISBURY, SAUGUS, SWAMPSCOTT,TOPSFIELD, WENHAM, WEST NEWBURY); MIDDLESEX (ACTON, ARLINGTON, ASHFORD, AYER-EXCEPT WEST OF GREENVILLE BRANCH OF BOSTON & MAINE RAIL ROAD, BEDF | 66.58 | 39.22 | 105.80 |
| ROOFER, WATERPROOFERS/CAULKERS (BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX, NORFOLK, PLYMOUTH, SUFFOLK, WORCESTER) | 53.53 | 35.69 | 89.22 |
| ROOFER: SLATE & TILE ROOF (BERKSHIRE, HAMPDEN, HAMPSHIRE) | 42.48 | 30.14 | 72.62 |
| ROOFER, WATERPROOFERS/CAULKERS (BERKSHIRE, HAMPDEN, HAMPSHIRE) | 42.48 | 30.14 | 72.62 |
| SHEET METAL WORKER (BARNSTABLE, BRISTOL (ACUSHNET, DARTMOUTH, DIGHTON, FAIRHAVEN, FALL RIVER, FREETOWN, NEW BEDFORD, REHOBOTH, SEEKONK, SOMERSET, SWANSEA, WESTPORT); DUKES, AND NANTUCKET) | 43.60 | 38.49 | 82.09 |
| SHEET METAL WORKER (ESSEX; MIDDLESEX; NORFOLK; PLYMOUTH (EXCEPT MARION MATTAPOISETT, ROCHESTER, WAREHAM); SUFFOLK) | 60.00 | 48.78 | 108.78 |
| SHEET METAL WORKER (WORCESTER (EXCEPT HARVARD & LANCASTER)) | 43.48 | 36.46 | 79.94 |
| SHEET METAL WORKER (BERKSHIRE, HAMPDEN AND HAMPSHIRE COUNTIES) | 43.48 | 36.46 | 79.94 |
| PAINTER (BRUSH & ROLLER, EXCLUDING DRYWALL FINISHING) | 30.86 | — | 30.86 |
| LABORER (UNSKILLED) | 18.73 | 6.33 | 25.06 |
| FLOOR LAYER: CARPET | 31.96 | — | 31.96 |
| CEMENT MASON/CONCRETE FINISHER | 39.38 | — | 39.38 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDES FORM WORK) | 50.10 | 31.45 | 81.55 |
| ELECTRICIAN | 66.17 | 37.08 | 103.25 |
| POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZER; GRADER/BLADE; ROLLER FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | 57.18 | 33.70 | 90.88 |
| POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; GRADALL; LOADER; PAVER (ASPHALT, AGGREGATE, AND CONCRETE); POST DRIVER (GUARDRAIL/FENCES) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | 57.83 | 33.70 | 91.53 |
| POWER EQUIPMENT OPERATOR: MILLING MACHINE FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | 57.83 | 33.70 | 91.53 |
| IRONWORKER, STRUCTURAL | 57.57 | 37.67 | 95.24 |
| IRONWORKER: ORNAMENTAL | 57.57 | 37.67 | 95.24 |
| LABORER: COMMON OR GENERAL | 33.25 | 22.92 | 56.17 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 33.50 | 22.92 | 56.42 |
| LABORER (GUARDRAIL INSTALLATION) | 33.50 | 22.92 | 56.42 |
| PAINTER: STEEL | 56.76 | 36.00 | 92.76 |
| TRUCK DRIVER: FLATBED TRUCK | 48.53 | — | 48.53 |
| TRUCK DRIVER: DUMP TRUCK | 30.38 | 7.20 | 37.58 |
| TRUCK DRIVER: CONCRETE TRUCK | 33.69 | 15.79 | 49.48 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 44.49 | 12.41 | 56.90 |
| TRAFFIC CONTROL: FLAGGER | 23.00 | 20.44 | 43.44 |
| PILEDRIVERMAN | 45.65 | 23.33 | 68.98 |
| PAINTER: SPRAY (LINESTRIPING) | 48.00 | — | 48.00 |
| OPERATOR: PILEDRIVER | 44.46 | 16.94 | 61.40 |
| OPERATOR: MECHANIC | 48.14 | 17.02 | 65.16 |
| OPERATOR: FORKLIFT | 64.67 | — | 64.67 |
| OPERATOR: CRANE | 52.14 | 21.08 | 73.22 |
| LABORER: LANDSCAPE | 40.39 | 17.68 | 58.07 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | 41.78 | 18.37 | 60.15 |
| IRONWORKER, REINFORCING | 56.48 | 20.62 | 77.10 |
| CEMENT MASON/CONCRETE FINISHER | 56.70 | 21.08 | 77.78 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| INSULATOR/ASBESTOS WORKER (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATING, AND FINISHES ALL TYPES OF MECHANICAL SYSTEMS) | 49.10 | 36.63 | 85.73 |
| BOILERMAKER | 50.62 | 28.82 | 79.44 |
| BRICKLAYER, CEMENT MASON, PLASTERER & STONEMASON (SPRINGFIELD/PITTSFIELD CHAPTER WORCESTER (WARREN COUNTY)) | 50.81 | 32.27 | 83.08 |
| BRICKLAYER, CEMENT MASON, PLASTERER & STONEMASON (WORCESTER CHAPTER WORCESTER (AUBURN BARRE, BLACKSTONE, BERLIN, BOLTON, BOYLSTON, THE BROOKFIELDS, CHARLTON, CLINTON, DOUGLAS, DUDLEY, GRAFTON, HARDWICK, HOLDEN, LEICESTER, MENDON, MILLBURY, MILVILLE, NEW BRAINTREE, NORTHBORO, NORTHBRIDGE, OAKHAM, OXFORD, PAXTON, RUTLAND, SHREWBURY, SOUTHBRIDGE, SPENCER, STURBRIDGE, SUTTON, UPTON, UXBRIDGE, WEBSTER, WESTBORO, WEST BOYLSTON, WORCESTER)) | 60.26 | 33.71 | 93.97 |
| BRICKLAYER, CEMENT MASON, PLASTERER & STONEMASON (LOWELL CHAPTER WORCESTER (HOPEDALE, MILFORD, SOUTHBORO)) | 60.26 | 33.71 | 93.97 |
| BRICKLAYER, CEMENT MASON, PLASTERER & STONEMASON (LOWELL CHAPTER WORCESTER (ASHBURHANM, ATHOL, FITCHBURG, GARDNER, HARVARD, HUBBARDSTON, LANCASTER, LEOMINSTER, LUNENBURG, PETERSHAM, PHILLIPSTON, PRINCETON, ROYALSTON, STERLING, TEMPLETON, WESTMINSTER, WINCHENDON)) | 60.26 | 33.71 | 93.97 |
| TERRAZZO FINISHER | 63.44 | 37.33 | 100.77 |
| MARBLE, TILE & TERRAZZO WORKERS | 64.52 | 37.51 | 102.03 |
| MARBLE & TILE FINISHER | 49.32 | 35.26 | 84.58 |
| DIVER TENDER | 61.70 | 35.47 | 97.17 |
| DIVER | 78.11 | 35.47 | 113.58 |
| PILEDRIVERMAN | 49.19 | 35.47 | 84.66 |
| CARPENTER/LATHER (WORCESTER (EXCEPT GILBERTVILLE, HARWICK, WARREN, WEST BROOKFIELD)) | 50.10 | 31.45 | 81.55 |
| CARPENTER/LATHER (WORCESTER (GILBERTVILLE, HARDWICK, WARREN, WEST BROOKFIELD)) | 50.10 | 31.45 | 81.55 |
| MILLWRIGHT | 43.42 | 33.00 | 76.42 |
| ELECTRICIAN (WORCESTER (WARREN)) | 48.16 | 36.20 | 84.36 |
| LINE CONSTRUCTION: LINEMAN A. PAID HOLIDAYS NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | 58.41 | 30.19 | 88.60 |
| LINE CONSTRUCTION: GROUNDMAN A. PAID HOLIDAYS NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | 32.13 | 12.70 | 44.83 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | 49.65 | 26.72 | 76.37 |
| LINE CONSTRUCTION: CABLEMAN A. PAID HOLIDAYS NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | 58.41 | 30.19 | 88.60 |
| ELEVATOR MECHANIC FOOTNOTE: A.VACATION 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | 66.41 | 38.44 | 104.85 |
| MACHINE;STATIONARY STEAM BOILER; PAVING CONCRETE FINISHING MACHINE; GROUT PUMP; PORTABLE STEAM BOILER; PORTABLE STEAM GENERATOR; ROLLER; SPREADER; ASPHALT PAVER; LOCOMOTIVES OR MACHINES USED IN PLACE THEREOF; TAMPER (SELF PROPELLED OR TRACTOR-DRAW); CAL TRACKS; BALLAST REGULATOR;RAIL ANCHOR MACHINE; SWITCH TAMPER; TIRE TRUCK (WORCESTER (EXCEPT ATHOL, BARRE, BROOKFIELD, EAST BROOKFIELD, HARDWICK, NEW BRAINTREE, NORTH BROOKFIELD, OAKHAM, PETERSHAM, PHILLIPSTON, ROYALSTON, STRUTBRIDGE, TEMPLETON, WARREN, WEST BROOKFIELD, WINCHENDON)) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT +13.14 | 57.18 | 33.70 | 90.88 |
| POWER EQUIPMENT OPERATORS : GROUP 4 ASSITANT ENGINEER (FIREMAN) (WORCESTER (EXCEPT ATHOL, BARRE, BROOKFIELD, EAST BROOKFIELD, HARDWICK, NEW BRAINTREE, NORTH BROOKFIELD, OAKHAM, PETERSHAM, PHILLIPSTON, ROYALSTON, STRUTBRIDGE, TEMPLETON, WARREN, WEST BROOKFIELD, WINCHENDON)) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT +13.14 | 46.52 | 33.70 | 80.22 |
| PUMPCRETE MACHINE; LOADERS; SHOVEL DOZER; FRONT END LOADER; MUCKING MACHINE; SHAFT HOIST; STEAM ENGINE; BACKHOE; GRADALL; CABLE WAY; FORK LIFT; CHERRY PICKER; BORING MACHINE; ROTARY DRILL; POST HOLE HAMMER; PORT HOLE DIGGER; ASPHALT PLANT ON JOB SITE; CONCRETE BATCHING AND/OR MIXING PLANT ON JOB SITE; CRUSHER PLANT ON JOB SITE; PAVING CONCRETE MIXER; TIMBER JACK (WORCESTER (EXCEPT ATHOL, BARRE, BROOKFIELD, EAST BROOKFIELD, HARDWICK, NEW BRAINTREE, NORTH BROOKFIELD, OAKHAM, PETERSHAM, PHILLIPSTON, ROYALSTON, STRUTBRIDGE, TEMPLETON, WARREN, WEST BROOKFIELD, WINCHENDON)) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT +13.14 | 57.83 | 33.70 | 91.53 |
| POWER EQUIPMENT OPERATORS (BUIDING, HEAVY & MARINE): GROUP 6 OILER (ON TRUCK CRANES AND GRADALLS) (WORCESTER (EXCEPT ATHOL, BARRE, BROOKFIELD, EAST BROOKFIELD, HARDWICK, NEW BRAINTREE, NORTH BROOKFIELD, OAKHAM, PETERSHAM, PHILLIPSTON, ROYALSTON, STRUTBRIDGE, TEMPLETON, WARREN, WEST BROOKFIELD, WINCHENDON)) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT +13.14 | 30.85 | 33.70 | 64.55 |
| POWER EQUIPMENT OPERATORS (BUIDING, HEAVY & MARINE): GROUP 5 OILER (OTHER THAN TRUCK CRANES AND GRADALLS) (WORCESTER (EXCEPT ATHOL, BARRE, BROOKFIELD, EAST BROOKFIELD, HARDWICK, NEW BRAINTREE, NORTH BROOKFIELD, OAKHAM, PETERSHAM, PHILLIPSTON, ROYALSTON, STRUTBRIDGE, TEMPLETON, WARREN, WEST BROOKFIELD, WINCHENDON)) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT +13.14 | 25.02 | 33.70 | 58.72 |
| POWER EQUIPMENT OPERATORS (BUIDING, HEAVY & MARINE): GROUP 3 PUMPS (1-3 GROUPED); COMPRESSOR; WELDING MACHINES (1-3 GROUPED); GENERATOR; SIGHTING PLANT; HEATERS (POWER DRIVEN, 1- 5); SYPHON-PULSOMETER; CONCRETE MIXER; VALVES CONTROLLING PERMANENT PLANT AIR STEAM, CONVEYOR, WELLPOINT SYSTEM (OPERATING) (WORCESTER (EXCEPT ATHOL, BARRE, BROOKFIELD, EAST BROOKFIELD, HARDWICK, NEW BRAINTREE, NORTH BROOKFIELD, OAKHAM, PETERSHAM, PHILLIPSTON, ROYALSTON, STRUTBRIDGE, TEMPLETON, WARREN, WEST BROOKFIELD, WINCHENDON)) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT +2.18 OVER 185 FT. +3.84 OVER 210 FT +5.39 OVER 250 FT. +8.16 OVER 295 FT +11.29 OVER 350 FT. +13.14 | 37.02 | 33.70 | 70.72 |
| POWER EQUIPMENT OPERATORS: GROUP 15 BOOM LENGTHS OVER 350 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 52.38 | 31.04 | 83.42 |
| POWER EQUIPMENT OPERATORS: GROUP 14 BOOM LENGTHS OVER 300 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 50.88 | 31.04 | 81.92 |
| POWER EQUIPMENT OPERATORS: GROUP 13 BOOM LENGTHS OVER 250 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 49.88 | 31.04 | 80.92 |
| POWER EQUIPMENT OPERATORS: GROUP 12 BOOM LENGTHS OVER 200 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 48.88 | 31.04 | 79.92 |
| POWER EQUIPMENT OPERATORS: GROUP 11 BOOM LENGTHS OVER 150 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 47.38 | 31.04 | 78.42 |
| POWER EQUIPMENT OPERATORS: GROUP 10 MASTER MECHANIC HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 46.38 | 31.04 | 77.42 |
| POWER EQUIPMENT OPERATORS: GROUP 9 OILER HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 44.37 | 31.04 | 75.41 |
| POWER EQUIPMENT OPERATORS: GROUP 8 TRUCK CRANE CREWS HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 44.06 | 31.04 | 75.10 |
| POWER EQUIPMENT OPERATORS: GROUP 7 COMPRESSORS UP TO 315 CU FT; SMALL MIXERS WITH SKIP; PUMPS UP TO 4 INCHES; POWER HEATERS; OILER; A-FRAME TRUCKS; FORKLIFTS-UP TO 7 FT. LIFT AND UP TO 3 TON CAPACITY; HYDRO BROOM; STUD WELDER. HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 54.38 | 31.04 | 85.42 |
| POWER EQUIPMENT OPERATORS: GROUP 6 COMPRESSOR (ONE OR TWO) 315 CU FT TO 900 CU FT; PUMPS 4 INCHES TO 16 INCHES (TOTAL DISCHARGE). HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 36.06 | 31.04 | 67.10 |
| POWER EQUIPMENT OPERATORS: GROUP 5 HOISTS; CONVEYORS; POWER PAVEMENT BREAKERS; SELF-POWERED CONCRETE PAVEMENT FINISHING MACHINES; TWO BAG MIXERS WITH SKIP; MCCARTHY AND SIMILAR DRILLS; BATCH PLANTS (NOT SELF LOADING); BULK CEMENT PLANTS; SELF-PROPELLED MATERIAL SPREADERS; THREE OR MORE 10 KW LIGHT PLANTS; 30 KW OR MORE GENERATORS; POWER BROOM. HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 38.00 | 31.04 | 69.04 |
| POWER EQUIPMENT OPERATORS: GROUP 4 ASPHALT ROLLERS; SELF-POWERED ROLLERS AND COMPACTORS; TRACTOR WITHOUT BLADE DRAWING SHEEPSFOOT ROLLER; RUBBER TIRE ROLLER; VIBRATORY ROLLER OR OTHER TYPE OF COMPACTORS INCLUDING MACHINES FOR PULVERIZING AND AERATING SOIL; YORK RAKE. HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 39.12 | 31.04 | 70.16 |
| POWER EQUIPMENT OPERATORS: GROUP 3 COMBINATION BACKHOE/LOADER UP TO 3/4 CU YD; SCRAPERS UP TO 21 CU YD (STRUCK LOAD, SELF PROPELLED OR TRACTOR DRAWN); TIREMAN; FRONT END LOADERS UP TO 4 YDS; WELL DRILLERS; ENGINEER OR FIREMAN ON HIGH PRESSURE BOILER; SELF-LOADING BATCH PLANT; WELL POINT OPERATORS ELECTRIC PUMPS USED IN WELL POINT SYSTEM; PUMPS, 16 INCHES AND OVER (TOTAL DISCHARGE); COMPRESSOR, ONE OR TWO 900 CU FT AND OVER; POWERED GREASE TRUCK; TUNNEL LOCOMOTIVES AND DINGYS; GROUT PUMPS; HYDRAULIC JACKS; BOOM TRUCK; HYDRAULIC CRANES- UP TO 10 TON. HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 42.35 | 31.04 | 73.39 |
| POWER EQUIPMENT OPERATORS: GROUP 2 ROTARY DRILL WITH MOUNTED COMPRESSOR; COMPRESSOR HOUSE (3 TO 6 COMPRESSORS); ROCK AND EARTH BORING MACHINES (EXCLUDING MCCARTHY AND SIMILAR DRILLS); FRONT END LOADERS 4 CU YDS TO 5 1/2 CU YDS); FORKLIFTS-7 FT LIFT AND OVER 3 TON CAPACITY; SCRAPER 21 YDS AND OVER (STRUCK LOAD); SONIC HAMMER CONSOLE; RECLAIMERS ROAD PLANER/MILLING MACHINE; CAL TRACKS; BALLAST REGULATORS; RAIL ANCHOR MACHINES; SWITCH TAMPERS, ASPHALT PAVERS; MECHANIC; WELDER AND TRANSFER MACHINE. HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 42.57 | 31.04 | 73.61 |
| CRAWLERS AND TRUCK CRANES INCLUDING ALL TOWER; SELF-PROPELLED HYDRAULIC CRANES 10 TONS AND OVER; DRAGLINES; CLAM SHELLS; CABLEWAYS; SHAFT HOISTS; MUCKING MACHINES DERRICKS; BACKHOES; BULLDOZERS; GRADALLS; ELEVATING GRADERS; PILE DRIVERS; CONCRETE PAVERS; TRENCHING MACHINES; FRONT END LOADERS- 5 1/2 CU YDS AND OVER; DUAL DRUM PAVER; AUTOMATIC GRADER-EXCAVATOR(C.M.I. OR EQUAL); SCRAPERS TOWING PAN OR WAGON; TANDEM DOZERS OR PUSH CATS(2 UNITS IN TANDEM); SHOTCRETE MACHINE; TUNNEL BORING MACHINE; COMBINATION BACKHOE/LOADER 3/4 CU YD HOE OR OVER; JET ENGINE DRYER; TREE SHREDDER; POST HOLE DIGGER; POST HOLE HAMMER; POST EXTRACTOR; TRUCK MOUNTED CONCRETE PUMP WITH BOOM; ROTO-MILL; GRADER; HORIZONTAL DRILLING MACHINE; JOHN HENRY ROCK DRILL AND SIMILAR EQUIPMENT. HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 42.88 | 31.04 | 73.92 |
| IRONWORKER | 57.57 | 37.67 | 95.24 |
| LABORERS:, HEAVY CONSTRUCTION: GROUP 6 ASBESTOS ABATEMENT; TOXIC AND HAZARDOUS WASTE LABORERS | 40.95 | 29.70 | 70.65 |
| LABORERS:, HEAVY CONSTRUCTION: GROUP 5 FLAGGER | 39.70 | 29.70 | 69.40 |
| LABORERS:, HEAVY CONSTRUCTION: GROUP 4 BLASTER; POWDERMAN | 39.95 | 29.70 | 69.65 |
| LABORERS:, HEAVY CONSTRUCTION: GROUP 3 AIR TRACK OPERATOR; BLOCK PAVER; RAMMER; CURB SETTER, HYDRAULIC AND SIMILAR SELF POWERED DRILLS | 39.70 | 29.70 | 69.40 |
| LABORERS:, HEAVY CONSTRUCTION: GROUP 2 ASPHALT RAKER; FENCE AND GUARD RAIL ERECTOR; LASER BEAM OPERATOR; MASON TENDER; PIPELAYER; PNEUMATIC DRILL OPERATOR; PNEUMATIC TOOL OPERATOR; WAGON DRILL OPERATOR, JACK HAMMER OPERATOR, PAVEMENT BREAKER, CARBIDE CORE DRILLING MACHINE, CHAIN SAW OPERATOR, BARCO TYPE JUMPING TAMPERS, CONCRETE PUMP, MOTORIZED MORTAR MIXER, RIDE-ON-MOTORIZED BUGGY | 39.20 | 29.70 | 68.90 |
| LABORERS:, HEAVY CONSTRUCTION: GROUP 1 LABORERS; CARPENTER TENDERS; CEMENT FINISHER TENDERS, PLASTERER TENDERS | 38.95 | 29.70 | 68.65 |
| LABORERS:(TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR), GROUP 6 HAZARDOUS WASTE WORK WITHIN THE ""HOT"" ZONE. (A PREMIUM OF TWO DOLLARS $2.00 PER HOUR OVER THE BASIC WAGE RATE. FOOTNOTE FOR LABORERS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, PATRIOT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, AND CHRISTMAS DAY $ 58.43 29.70 LABORERS: LABORERS; TOP MAN ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | 41.18 | 29.70 | 70.88 |
| LABORERS: LABORERS; TOP MAN ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | 46.20 | 29.70 | 75.90 |
| LABORERS: LABORER ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | 41.18 | 29.70 | 70.88 |
| LABORERS: LABORER ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | 46.20 | 29.70 | 75.90 |
| LABORERS: GROUP 5 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | 47.48 | 29.70 | 77.18 |
| LABORERS: GROUP 5 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | 52.50 | 29.70 | 82.20 |
| LABORERS: GROUP 5 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | 53.41 | 29.70 | 83.11 |
| LABORERS: GROUP 5 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | 58.43 | 29.70 | 88.13 |
| LABORERS: GROUP 4 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | 45.48 | 29.70 | 75.18 |
| LABORERS: GROUP 4 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | 50.50 | 29.70 | 80.20 |
| LABORERS: GROUP 4 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | 53.41 | 29.70 | 83.11 |
| LABORERS: GROUP 4 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | 58.43 | 29.70 | 88.13 |
| LABORERS: GROUP 3 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | 45.48 | 29.70 | 75.18 |
| LABORERS: GROUP 3 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | 50.50 | 29.70 | 80.20 |
| LABORERS: GROUP 3 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | 53.41 | 29.70 | 83.11 |
| LABORERS: GROUP 3 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | 58.43 | 29.70 | 88.13 |
| LABORERS: GROUP 2 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | 45.48 | 29.70 | 75.18 |
| LABORERS: GROUP 2 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | 50.50 | 29.70 | 80.20 |
| LABORERS: GROUP 2 (CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing)) | 45.48 | 29.70 | 75.18 |
| LABORERS: GROUP 2 (CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing)) | 50.50 | 29.70 | 80.20 |
| LABORERS: GROUP 2 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | 53.41 | 29.70 | 83.11 |
| LABORERS: GROUP 2 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | 58.43 | 29.70 | 88.13 |
| LABORERS: GROUP 2 ((FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR)) | 50.50 | 29.70 | 80.20 |
| LABORERS: GROUP 1 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | 42.93 | 29.70 | 72.63 |
| LABORERS: GROUP 1 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | 47.95 | 29.70 | 77.65 |
| LABORERS: GROUP 1 (CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing)) | 45.48 | 29.70 | 75.18 |
| LABORERS: GROUP 1 (CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing)) | 50.50 | 29.70 | 80.20 |
| LABORERS: GROUP 1 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | 42.93 | 29.70 | 72.63 |
| LABORERS: GROUP 1 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | 47.95 | 29.70 | 77.65 |
| LABORERS: GROUP 1 ((FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR)) | 50.50 | 29.70 | 80.20 |
| LABORERS: DRILLER ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | 42.58 | 29.70 | 72.28 |
| LABORERS: DRILLER ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | 50.20 | 29.70 | 79.90 |
| LABORERS: BOTTOM MAN ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | 42.33 | 29.70 | 72.03 |
| LABORERS: BOTTOM MAN ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | 47.35 | 29.70 | 77.05 |
| ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | 41.18 | 29.70 | 70.88 |
| ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | 42.33 | 29.70 | 72.03 |
| ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | 42.58 | 29.70 | 72.28 |
| LABORERS:, WRECKING: GROUP 6 ASBESTOS, LEAD PAINT, TOXIC AND HAZARDOUS WASTE | 46.25 | 29.70 | 75.95 |
| LABORERS:, WRECKING: GROUP 5 YARDMAN, BURNERS, SAWYERS | 45.35 | 29.70 | 75.05 |
| LABORERS:, WRECKING: GROUP 4 YARDMAN (SALVAGE YARD ONLY) | 42.25 | 29.70 | 71.95 |
| LABORERS:, WRECKING: GROUP 3 SMALL BACKHOES, LOADERS ON TRACKS, BOBCAT TYPE LOADERS, HYDRAULIC ""BROCK"" TYPE HAMMER OPERATORS, CONCRETE CUTTING SAWS | 47.25 | 29.70 | 76.95 |
| LABORERS:, WRECKING: GROUP 2 BURNERS, JACKHAMMERS | 47.00 | 29.70 | 76.70 |
| LABORERS:, WRECKING: GROUP 1 ADZEMAN, WRECKING LABORER | 46.25 | 29.70 | 75.95 |
| PAINTER: SPRAY, SANDBLAST (REPAINT) | 45.72 | 36.00 | 81.72 |
| PAINTER: SPRAY, SANDBLAST (NEW CONSTRUCTION) | 47.66 | 36.00 | 83.66 |
| PAINTER: BRUSH, TAPER (REPAINT) | 44.32 | 36.00 | 80.32 |
| PAINTER: BRUSH, TAPER (NEW CONSTRUCTION) | 46.26 | 36.00 | 82.26 |
| PAINTER: BRIDGE (REPAINT) | 44.32 | 36.00 | 80.32 |
| PAINTER: BRIDGE (NEW CONSTRUCTION) | 56.76 | 36.00 | 92.76 |
| GLAZIER | 46.26 | 36.00 | 82.26 |
| PLUMBERS AND PIPEFITTERS (WORCESTER (EXCEPT HOPEDALE AND SOUTHBORO)) | 55.00 | 31.57 | 86.57 |
| PLUMBER (WORCESTER (HOPEDALE AND SOUTHBORO)) | 69.84 | 36.43 | 106.27 |
| ROOFERS: (ALL TEAR-OFF AND/OR REMOVAL OF ANY TYPES OF ROOFING AND ALL SPUDDING, SWEEPING, VACUUMING AND/OR CLEANUP OF ANY AND ALL AREAS OF ANY TYPE WHERE A ROOF IS TO BE RELAID) | 53.53 | 35.69 | 89.22 |
| SPRINKLER FITTER | 53.25 | 29.75 | 83.00 |
| SHEET METAL WORKER (WORCESTER (EXCEPT HARVARD & LANCASTER)) | 43.48 | 36.46 | 79.94 |
| TRUCK DRIVERS: GROUP 7 TRAILERS FOR EARTH MOVING EQUIPMENT (DOUBLE HOOKUP) POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | 41.82 | 37.35 | 79.17 |
| TRUCK DRIVERS: GROUP 6 SPECIALIZED EARTH MOVING EQUIPMENT OVER 35 TONS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | 41.53 | 37.35 | 78.88 |
| TRUCK DRIVERS: GROUP 5 SPECIALIZED EARTH MOVING EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING RESTORATION EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | 41.24 | 37.35 | 78.59 |
| TRUCK DRIVERS: GROUP 4 FOUR AND FIVE AXLE EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | 41.14 | 37.35 | 78.49 |
| TRUCK DRIVERS: GROUP 3 THREE AXLE EQUIPMENT AND TIREMAN POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | 41.02 | 37.35 | 78.37 |
| TRUCK DRIVERS: GROUP 2 TWO AXLE EQUIPMENT; & FORKLIFT OPERATOR POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | 40.95 | 37.35 | 78.30 |
| TRUCK DRIVERS: GROUP 1 STATION WAGONS; PANEL TRUCKS; AND PICKUP TRUCKS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | 40.78 | 37.35 | 78.13 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | 30.86 | 14.15 | 45.01 |
| DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | 37.15 | 14.57 | 51.72 |
| ASSISTANT FILL PLACER, WELDER, STEWARD INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | 38.38 | 14.66 | 53.04 |
| DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | 39.46 | 14.73 | 54.19 |
| LICENSED CREW BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | 41.93 | 14.90 | 56.83 |
| DREDGING: CLASS A2: CRANE OPERATOR (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | 43.20 | 14.99 | 58.19 |
| DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | 48.48 | 15.34 | 63.82 |