Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 43.85 | 28.44 | 72.29 |
| ELECTRICIAN | 40.96 | 22.44 | 63.40 |
| POWER EQUIPMENT OPERATOR (DRILL) | 40.65 | 19.60 | 60.25 |
| POWER EQUIPMENT OPERATOR: LOADER | 40.65 | 19.60 | 60.25 |
| POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | 40.65 | 19.60 | 60.25 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | 40.65 | 19.60 | 60.25 |
| POWER EQUIPMENT OPERATOR (OILER) | 34.99 | 19.60 | 54.59 |
| IRONWORKER: ORNAMENTAL | 37.77 | 23.90 | 61.67 |
| IRONWORKER (STRUCTURAL AND REINFORCING) | 36.17 | 25.80 | 61.97 |
| LABORER: MASON TENDER - CEMENT/CONCRETE, POWER TOOL OPERATOR | 26.69 | 13.32 | 40.01 |
| PLUMBER | 41.90 | 24.89 | 66.79 |
| PIPEFITTER | 41.90 | 24.89 | 66.79 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 44.15 | 26.08 | 70.23 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | 40.32 | 25.66 | 65.98 |
| TRUCK DRIVER: DUMP TRUCK | 23.60 | 8.03 | 31.63 |
| TILE SETTER | 22.64 | 6.10 | 28.74 |
| TILE FINISHER | 15.42 | 5.63 | 21.05 |
| ROOFER | 20.61 | 5.12 | 25.73 |
| PAINTER: SPRAY | 22.81 | 11.87 | 34.68 |
| PAINTER (BRUSH AND ROLLER) | 20.83 | 11.84 | 32.67 |
| OPERATOR: ROLLER | 23.60 | 12.65 | 36.25 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 22.52 | 4.00 | 26.52 |
| OPERATOR: BULLDOZER | 21.49 | 3.84 | 25.33 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 24.35 | 13.00 | 37.35 |
| LABORER: PIPELAYER | 20.36 | 9.90 | 30.26 |
| LABORER: MASON TENDER - BRICK | 19.24 | 3.79 | 23.03 |
| LABORER: COMMON OR GENERAL | 18.87 | 5.29 | 24.16 |
| CEMENT MASON/CONCRETE FINISHER | 20.21 | 9.70 | 29.91 |
| CARPENTER: FLOOR LAYING-VINYL ONLY | 29.99 | 1.32 | 31.31 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND METAL STUD INSTALLATION, FORMWORK AND FLOOR LAYING - VINYL | 23.45 | 9.20 | 32.65 |
| CARPENTER (FORM WORK ONLY) | 22.19 | 12.25 | 34.44 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | 21.72 | 13.52 | 35.24 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | 25.39 | 8.16 | 33.55 |
| BRICKLAYER | 24.24 | 8.25 | 32.49 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 26.83 | 12.67 | 39.50 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 30.94 | 21.99 | 52.93 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | 28.23 | 20.89 | 49.12 |
| POWER EQUIPMENT OPERATOR: CRANE (ALL OTHER TYPES), TRUCK CRANE, TOWER CRANES (FRENCH, GERMAN AND OTHER TYPES) CRANE WITH BOOM 150 FEET & OVER, INCLUDING JIB SHALL RECEIVE $.75 ABOVE RATE ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE RATE REGARDLESS OF BOOM LENGTH | 33.90 | 17.85 | 51.75 |
| CEMENT MASON/CONCRETE FINISHER | 27.80 | 18.71 | 46.51 |
| PLUMBER | 41.90 | 24.89 | 66.79 |
| SHEET METAL WORKER (INCLUDING GUTTER INSTALLER) | 40.32 | 25.66 | 65.98 |
| TRUCK DRIVER: DUMP TRUCK | 14.00 | 1.63 | 15.63 |
| ROOFER: SHAKE & SHINGLE ROOF | 14.28 | — | 14.28 |
| PAINTER: BRUSH AND ROLLER | 10.00 | — | 10.00 |
| OPERATOR: ROLLER | 20.41 | 5.72 | 26.13 |
| OPERATOR: BULLDOZER | 21.50 | 1.79 | 23.29 |
| OPERATOR: BACKHOE | 21.50 | 1.79 | 23.29 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 12.10 | — | 12.10 |
| LABORER: GRADE CHECKER | 14.00 | 1.57 | 15.57 |
| LABORER: COMMON OR GENERAL | 11.10 | 1.08 | 12.18 |
| ELECTRICIAN | 14.25 | 1.70 | 15.95 |
| CARPENTER | 13.00 | 0.25 | 13.25 |
| BRICKLAYER | 16.00 | — | 16.00 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | 33.89 | 24.06 | 57.95 |
| ELECTRICIAN | 40.96 | 22.44 | 63.40 |
| POWER EQUIPMENT OPERATOR GROUP 4 OILER; PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | 38.37 | 19.60 | 57.97 |
| POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | 38.69 | 19.60 | 58.29 |
| LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | 41.55 | 19.60 | 61.15 |
| IRONWORKER: ORNAMENTAL AND REINFORCING | 36.17 | 25.80 | 61.97 |
| LABORER: FLAGGER | 35.52 | 14.45 | 49.97 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | 35.69 | 14.45 | 50.14 |
| LABORER: CONCRETE WORKER | 28.94 | 17.59 | 46.53 |
| LABORER: CONCRETE FINISHING | 29.84 | 17.59 | 47.43 |
| TRUCK DRIVER: DUMP TRUCK | 16.80 | 4.06 | 20.86 |
| OPERATOR: TRENCHER | 26.34 | 12.58 | 38.92 |
| OPERATOR: ROLLER | 23.39 | 13.00 | 36.39 |
| OPERATOR: MECHANIC | 25.81 | 13.00 | 38.81 |
| OPERATOR: LOADER | 26.50 | 13.00 | 39.50 |
| OPERATOR: BULLDOZER | 25.35 | 16.74 | 42.09 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 20.85 | 5.00 | 25.85 |
| LABORER: PIPELAYER | 18.56 | 4.50 | 23.06 |
| LABORER: COMMON OR GENERAL | 17.17 | — | 17.17 |
| IRONWORKER, STRUCTURAL | 25.46 | 17.49 | 42.95 |
| OPERATOR: FORKLIFT | 40.05 | 19.10 | 59.15 |