Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ALL; UTILITY TRACTOR AND ATTACHMENTS, AND RUBBER TIRE FRONT END LOADER OR SIMILAR MACHINE OF 1 TO 1.5 CU YD SOLELY USED FOR PLACEMENT OF LARGE DECORATIVE BOULDERS, TREES WITH BALLED SOIL, AND OTHER DECORATIVE LANDSCAPE MATERIAL TOO LARGE TO BE ACCOMMODATED IN A 1 CU YD BUCKET. ALL OTHER EQUIPMENT UTILIZED FOR PERFORMING LANDSCAPE WORK, TREE TRIMMING OR REMOVAL OF STEES, AND TO INSTALL PLANTS; TRANSPORT TREES; EXCAVATE PLANT PITS; PLACE SOIL AND OTHER LANDSCAPE MATERIALS; AND APPLY FINISH LANDSCAPE MATERIAL ON SUBGRADE PREPARED BY OTHERS. (FOOTNOTE: A. HEALTH AND WELFARE CONTRIBUTION IS $1,780.00 PER MONTH. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; FOURTH OF JULY; LABOR DAY; THANKSGIVING DAY; AND CHRISTMAS DAY PROVIDED THAT ALL SUCH EMPLOYEES SHALL HAVE IN FACT WORKED THEIR REGULARLY SCHEDULED WORK DAY IMMEDIATELY PRECEDING AND THE REGULARLY SCHEDULED WORK DAY IMMEDIATELY SUCCEEDING THE OCCURRENCE OF SUCH HOLIDAY.) (BOONE, COOK, DUPAGE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) | 37.55 | 9.50 | 47.05 |
| ATTACHMENTS, AND RUBBER TIRE FRONT END LOADER OR SIMILAR MACHINE OF 1 TO 1.5 CU YD SOLELY USED FOR PLACEMENT OF LARGE DECORATIVE BOULDERS, TREES WITH BALLED SOIL, AND OTHER DECORATIVE LANDSCAPE MATERIAL TOO LARGE TO BE ACCOMMODATED IN A 1 CU YD BUCKET. ALL OTHER EQUIPMENT UTILIZED FOR PERFORMING LANDSCAPE WORK, TREE TRIMMING OR REMOVAL OF STEES, AND TO INSTALL PLANTS; TRANSPORT TREES; EXCAVATE PLANT PITS; PLACE SOIL AND OTHER LANDSCAPE MATERIALS; AND APPLY FINISH LANDSCAPE MATERIAL ON SUBGRADE PREPARED BY OTHERS. (FOOTNOTE: A. HEALTH AND WELFARE CONTRIBUTION IS $1,780.00 PER MONTH B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; FOURTH OF JULY; LABOR DAY; THANKSGIVING DAY; AND CHRISTMAS DAY PROVIDED THAT ALL SUCH EMPLOYEES SHALL HAVE IN FACT WORKED THEIR REGULARLY SCHEDULED WORK DAY IMMEDIATELY PRECEDING AND THE REGULARLY SCHEDULED WORK DAY IMMEDIATELY SUCCEEDING THE OCCURRENCE OF SUCH HOLIDAY.) (HENRY, MCLEAN, OGLE, PEORIA, ROCK ISLAND, TAZEWELL, WINNEBAGO, AND WOODFORD COUNTIES) | 37.55 | 9.50 | 47.05 |
| LANDSCAPE LABORER- HIGHWAY CONSTRUCTION (WINNEBAGO COUNTY) | 47.04 | 36.31 | 83.35 |
| LANDSCAPE LABORER- HIGHWAY CONSTRUCTION (ROCK ISLAND COUNTY) | 33.77 | 23.60 | 57.37 |
| LANDSCAPE LABORER- HIGHWAY CONSTRUCTION (MCLEAN COUNTY) | 31.08 | 24.43 | 55.51 |
| LANDSCAPE LABORER-HIGHWAY CONSTRUCTION (HENRY COUNTY) | 35.23 | 28.10 | 63.33 |
| LANDSCAPE LABORER-HIGHWAY CONSTRUCTION (KANKAKEE COUNTY) | 39.44 | 32.54 | 71.98 |
| LANDSCAPE LABORER- HIGHWAY CONSTRUCTION (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | 32.73 | 23.74 | 56.47 |
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE DRIVER 2 & 3 AXLES. (GRUNDY, LAKE & WILL COUNTIES) | 11.86 | 2.81 | 14.67 |
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (DE KALB COUNTY) | 7.25 | — | 7.25 |
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (DU PAGE COUNTY) | 7.25 | — | 7.25 |
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS. (COOK COUNTY) | 7.25 | — | 7.25 |
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATORS (DE KALB COUNTY) | 7.25 | — | 7.25 |
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (DE KALB COUNTY) | 9.66 | 0.26 | 9.92 |
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (GRUNDY, LAKE & WILL COUNTIES) .$ 12.00 3.32 LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, & WILL COUNTIES) | 9.73 | 2.05 | 11.78 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (COOK COUNTY) | 7.25 | — | 7.25 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (DE KALB COUNTY) | 7.25 | — | 7.25 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATORS (DU PAGE COUNTY) | 10.75 | — | 10.75 |
| LABORER: HIGHWAY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (DE KALB COUNTY) | 9.66 | 0.26 | 9.92 |
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) | 7.25 | — | 7.25 |
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (COOK COUNTY) | 9.80 | 1.82 | 11.62 |
| LABORER: BUILDING CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (DU PAGE COUNTY) | 9.04 | 1.16 | 10.20 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE DRIVER, 2 & 3 AXLES (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY & WILL COUNTIES) | 11.94 | 2.42 | 14.36 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, & WILL COUNTIES) | 7.25 | — | 7.25 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATORS (BOONE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, & WILL COUNTIES) | 13.11 | 3.01 | 16.12 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE DRIVER, 2 & 3 AXLES (COOK COUNTY) | 9.93 | 1.89 | 11.82 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATORS (COOK COUNTY) | 10.98 | 2.12 | 13.10 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATORS (DE KALB COUNTY) | 7.25 | — | 7.25 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (DE KALB COUNTY) | 9.66 | 0.26 | 9.92 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE DRIVER, 2 & 3 AXLES (DU PAGE COUNTY) | 8.32 | 1.02 | 9.34 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORERS (DU PAGE COUNTY) | 7.25 | — | 7.25 |
| LABORER: HIGHWAY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE LABORER (DE KALB COUNTY) | 7.25 | — | 7.25 |
| LABORER: HIGHWAY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATORS (DE KALB COUNTY) | 7.25 | — | 7.25 |
| LABORER: HIGHWAY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE DRIVER (KANKAKEE COUNTY) | 8.75 | 0.17 | 8.92 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (COOK COUNTY) | 10.08 | 2.06 | 12.14 |
| LABORER: HEAVY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE PLANTSMAN (DU PAGE COUNTY) | 10.65 | — | 10.65 |
| LABORER: HIGHWAY CONSTRUCTION (LANDSCAPE WORK)- LANDSCAPE OPERATOR (KANKAKEE COUNTY) | 16.57 | 3.56 | 20.13 |
| LABORER: HIGHWAY CONSTRUCTION (LANDSCAPE WORK)- TRUCK DRIVERS, 2 & 3 AXLES (PEORIA, TAZEWELL, & WOODFORD COUNTIES) | 17.58 | 5.88 | 23.46 |
| TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | 45.29 | 25.42 | 70.71 |
| TRUCK DRIVER, GROUP 2 - 2 OR 3 AXLES HAULING LESS THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB. CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBINATION UNITS. (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | 45.88 | 25.42 | 71.30 |
| TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | 46.15 | 25.42 | 71.57 |
| TRUCK DRIVER, GROUP 4- LOW BOY AND OIL DISTRIBUTORS. (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | 46.54 | 25.42 | 71.96 |
| TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (MCLEAN (SOUTH OF A STRAIGHT LINE FROM WHERE ROUTE 24 INTERSECTS THE WOODFORD COUNTY LINE IN A SOUTHEAST DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY) COUNTY) | 47.64 | 25.42 | 73.06 |
| TRUCK DRIVER: 2-3 AXLES. FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION $562.80 PER WEEK B. LOWBOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) | 46.12 | 0.30 | 46.42 |
| TRUCK DRIVER: 4 AXLES. FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION $562.80 PER WEEK B. LOWBOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) | 46.27 | 0.30 | 46.57 |
| TRUCK DRIVER: 5 AXLES. FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION $562.80 PER WEEK B. LOWBOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) | 46.47 | 0.30 | 46.77 |
| TRUCK DRIVER: 6 AXLES. FOOTNOTES: A.HEALTH AND WELFARE $448.80 PER WEEK; PENSION $562.80 PER WEEK B. LOWBOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES (GRUNDY, KENDALL, MCLEAN (NORTH OF A STRAIGHT LINE STARTING AT THE INTERSECTION OF MCLEAN-WOODFORD COUNTIES LINE & ROUTE 24 IN A SOUTHEASTERN DIRECTION TO THE SOUTH SOUTHWEST CORNER OF LIVINGSTON COUNTY), WILL, AND WOODFORD (NORTHEAST CORNER EAST OF ROUTE 51/251 & NORTH OF ROUTE 24) COUNTIES) | 46.67 | 0.30 | 46.97 |
| TRUCK DRIVER: 2 OR 3 AXLES. FOOTNOTES: A $1055.60 PER WEEK. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. (KANKAKEE COUNTY) | 44.82 | 0.25 | 45.07 |
| TRUCK DRIVER: 4 AXLES. FOOTNOTES: A. $1055.60 PER WEEK. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. (KANKAKEE COUNTY) | 44.97 | 0.25 | 45.22 |
| TRUCK DRIVER: 5 AXLES. FOOTNOTES: A. $1055.60 PER WEEK. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. (KANKAKEE COUNTY) | 45.17 | 0.25 | 45.42 |
| TRUCK DRIVER: 6 AXLES. FOOTNOTES: A. $1055.60 PER WEEK. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. (KANKAKEE COUNTY) | 45.37 | 0.25 | 45.62 |
| TRUCK DRIVER: 2-3 AXLES. FOOTNOTES: A.$500.00 PER WEEK PENSION. B. LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. (LAKE AND MCHENRY COUNTIES) | 44.54 | 13.40 | 57.94 |
| TRUCK DRIVER: 4 AXLES. FOOTNOTES: A.$500.00 PER WEEK PENSION. B. LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. (LAKE AND MCHENRY COUNTIES) | 44.69 | 13.40 | 58.09 |
| TRUCK DRIVER: 5 AXLES. FOOTNOTES: A.$500.00 PER WEEK PENSION. B. LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. (LAKE AND MCHENRY COUNTIES) | 44.89 | 13.40 | 58.29 |
| TRUCK DRIVER: 6 AXLES. FOOTNOTES: A.$500.00 PER WEEK PENSION. B. LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. (LAKE AND MCHENRY COUNTIES) | 45.09 | 13.40 | 58.49 |
| TRUCK DRIVER: 2 - 3 AXLES. FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. (BOONE AND WINNEBAGO COUNTIES) | 48.47 | 26.70 | 75.17 |
| TRUCK DRIVER: 4 AXLES. FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. (BOONE AND WINNEBAGO COUNTIES) | 48.62 | 26.70 | 75.32 |
| TRUCK DRIVER: 5 AXLES. FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. (BOONE AND WINNEBAGO COUNTIES) | 48.82 | 26.70 | 75.52 |
| TRUCK DRIVER: 6 AXLES. FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. (BOONE AND WINNEBAGO COUNTIES) | 48.93 | 26.70 | 75.63 |
| TRUCK DRIVER: 2-3 AXLES. FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) | 44.83 | 0.30 | 45.13 |
| TRUCK DRIVER: 4 AXLES. FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) | 44.98 | 0.30 | 45.28 |
| TRUCK DRIVER: 5 AXLES. FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) | 45.18 | 0.30 | 45.48 |
| TRUCK DRIVER: 6 AXLES. FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. (DEKALB AND OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT) COUNTIES) | 45.38 | 0.30 | 45.68 |
| TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (HENRY AND ROCK ISLAND COUNTIES) | 45.35 | 25.72 | 71.07 |
| TRUCK DRIVER, GROUP 2- 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB. CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBINATION UNITS. (HENRY AND ROCK ISLAND COUNTIES) | 45.93 | 25.72 | 71.65 |
| TRUCK DRIVER, GROUP 3- 2, 3, OR 4 AXLES HAULING 16 TONS OR MORE; 5-AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS. (HENRY AND ROCK ISLAND COUNTIES) | 46.25 | 25.72 | 71.97 |
| TRUCK DRIVER, GROUP 4- LOW BOY AND OIL DISTRIBUTORS. (HENRY AND ROCK ISLAND COUNTIES) | 46.60 | 25.72 | 72.32 |
| TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (HENRY AND ROCK ISLAND COUNTIES) | 47.71 | 25.72 | 73.43 |
| TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | 43.24 | 24.27 | 67.51 |
| TRUCK DRIVER, GROUP 2- 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB. CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBINATION UNITS. (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | 43.83 | 24.27 | 68.10 |
| TRUCK DRIVER, GROUP 3- 2, 3, OR 4 AXLES HAULING 16 TONS OR MORE; 5 AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS. (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | 44.10 | 24.27 | 68.37 |
| TRUCK DRIVER, GROUP 4- LOW BOY AND OIL DISTRIBUTORS. (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | 44.49 | 24.27 | 68.76 |
| TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (PEORIA, TAZEWELL, AND WOODFORD COUNTIES) | 45.59 | 24.27 | 69.86 |
| TRUCK DRIVER: 2-3 AXLES. FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE $453.20 PER WEEK. PENSON: $589.90 PER WEEK. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. (DU PAGE AND KANE COUNTIES) | 45.31 | 0.30 | 45.61 |
| TRUCK DRIVER: 4 AXLES. FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK. PENSON: $589.90 PER WEEK. PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. (DU PAGE AND KANE COUNTIES) | 45.46 | 0.30 | 45.76 |
| TRUCK DRIVER: 5 AXLES. FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK. PENSON: $589.90 PER WEEK. PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. (DU PAGE AND KANE COUNTIES) | 45.66 | 0.30 | 45.96 |
| TRUCK DRIVER: 6 AXLES. FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK. PENSON: $589.90 PER WEEK. PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. (DU PAGE AND KANE COUNTIES) | 45.86 | 0.30 | 46.16 |
| TRUCK DRIVER, GROUP 1- DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | 45.29 | 25.42 | 70.71 |
| TRUCK DRIVER, GROUP 2- 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYUDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB. CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBINATION UNITS. (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | 45.88 | 25.42 | 71.30 |
| TRUCK DRIVER, GROUP 3- 2, 3, OR 4 AXLES HAULING 16 TONS OR MORE; 5-AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS. (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | 46.15 | 25.42 | 71.57 |
| TRUCK DRIVER, GROUP 4- LOW BOY AND OIL DISTRIBUTORS. (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | 46.54 | 25.42 | 71.96 |
| TRUCK DRIVER, GROUP 5- DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (OGLE (NORTH OF ROUTE 72/EAST OF ROUTE 251) COUNTY) | 47.64 | 25.42 | 73.06 |
| VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $448.80 PER WEEK. PENSION: $562.80 PER WEEK. (COOK COUNTY) | 45.55 | 30.27 | 75.82 |
| VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $448.80 PER WEEK. PENSION: $562.80 PER WEEK. (COOK COUNTY) | 45.80 | 30.27 | 76.07 |
| VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $448.80 PER WEEK. PENSION: $562.80 PER WEEK. (COOK COUNTY) | 46.00 | 30.27 | 76.27 |
| VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $448.80 PER WEEK. PENSION: $562.80 PER WEEK. (COOK COUNTY) | 46.20 | 30.27 | 76.47 |
| VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. (COOK COUNTY) | 53.95 | 0.30 | 54.25 |
| TRUCK DRIVER: 4 AXLES. (BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. (COOK COUNTY) | 54.21 | 0.30 | 54.51 |
| TRUCK DRIVER: 5 AXLES. (BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. (COOK COUNTY) | 54.43 | 0.30 | 54.73 |
| TRUCK DRIVER: 6 AXLES. (BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. (COOK COUNTY) | 54.64 | 0.30 | 54.94 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | 45.49 | 25.72 | 71.21 |
| TERRAZZO WORKER/SETTER | 44.38 | 25.84 | 70.22 |
| UNITS SUCH AS A ROWHOUSE, TOWNHOUSE AND CONDOMINIUM | 24.61 | 15.94 | 40.55 |
| CARPENTER: (INCLUDING DRYWALL HANGING AND BATT INSULATION) RATE A - MULTI-UNIT BUILDING/STRUCTURE CONTAINING MORE THAN EIGHT (8) UNITS USED EXCLUSIVELY AS INDIVIDUAL RESIDENCES WHETHER THEY BE LEASED OR RENTED | 31.32 | 26.23 | 57.55 |
| ELECTRICIAN | 30.61 | 28.17 | 58.78 |
| TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA | 51.60 | 51.05 | 102.65 |
| (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, (OGLE COUNTY) PREMIUM PAY: LONG BOOM CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA | 53.60 | 51.05 | 104.65 |
| BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA | 56.05 | 51.05 | 107.10 |
| MACHINES*. (OGLE COUNTY) *-REQUIRES OILER PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA | 56.75 | 51.05 | 107.80 |
| LABORERS: COMMON AND LANDSCAPE | 19.88 | 11.87 | 31.75 |
| PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL (BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES) | 45.15 | 29.41 | 74.56 |
| CEMENT MASON/CONCRETE FINISHER | 27.43 | 22.21 | 49.64 |
| PLUMBER/PIPEFITTER | 55.54 | 31.43 | 86.97 |
| ROOFER | 50.25 | 30.43 | 80.68 |
| SHEET METAL WORKER (INCLUNDING HVAC) | 39.47 | 31.55 | 71.02 |
| LABORERS: PLANTSMAN | 9.00 | — | 9.00 |
| RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | 45.38 | 0.30 | 45.68 |
| RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | 45.18 | 0.30 | 45.48 |
| RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | 44.98 | 0.30 | 45.28 |
| RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | 44.83 | 0.30 | 45.13 |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (OGLE COUNTY (SOUTH OF ROUTE 72/WEST OF ROUTE 251)) | 47.64 | 25.42 | 73.06 |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS (OGLE COUNTY (SOUTH OF ROUTE 72/WEST OF ROUTE 251)).$ 46.54 25.42 TRUCK DRIVER, GROUP 3 (OGLE COUNTY (SOUTH OF ROUTE 72/WEST OF ROUTE 251)) | 46.15 | 25.42 | 71.57 |
| TRUCK DRIVER, GROUP 2 (OGLE COUNTY (SOUTH OF ROUTE 72/WEST OF ROUTE 251)) | 45.88 | 25.42 | 71.30 |
| TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (OGLE COUNTY (SOUTH OF ROUTE 72/WEST OF ROUTE 251)) | 45.29 | 25.42 | 70.71 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (HENRY AND ROCK ISLAND COUNTIES) | 38.00 | 35.16 | 73.16 |
| CARPENTER (BUREAU COUNTY) | 40.28 | 38.95 | 79.23 |
| CARPENTER (CARROLL, JO DAVIESS, LEE, OGLE (OREGON AND SOUTH THEREOF), STEPHENSON, AND WHITESIDE COUNTIES) | 48.60 | 38.53 | 87.13 |
| CARPENTER (OGLE (NORTHERN ONE-HALF), AND WINNEBAGO COUNTIES) | 51.00 | 36.13 | 87.13 |
| LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR (ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON CRANE OR LARGER) (BUREAU & HENRY (ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS)) | 52.63 | 24.35 | 76.98 |
| LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER (BUREAU & HENRY (ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS)) | 39.92 | 20.22 | 60.14 |
| LINE CONSTRUCTION: LINEMAN AND SUBSTATION TECHNICIAN (BUREAU & HENRY (ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS)) | 58.58 | 26.29 | 84.87 |
| LINE CONSTRUCTION, CABLE SPLICER (CARROLL (TOWNSHIPS OF FAIR HAVEN, FREEDOM, MOUNT CARROLL, SALEM, SAVANNA, WASHINGTON, WOODLAND & YORK), JO DAVIESS (TOWNSHIPS OF COUNCIL HILL, DERINDA, DUNLEITH, EAST GALENA, ELIZABETH, GUILFORD, HANOVER, MENOMINEE, RAWLINS, RICE, SCALES MOUND, VINEGAR HILL & WEST GALENA), HENRY (EXCEPT ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS) ROCK ISLAND & WHITESIDE (TOWNSHIPS OF ALBANY, CLYDE, ERIE, FENTON, FULTON, GARDEN PLAIN, LYN | 53.12 | 24.53 | 77.65 |
| LINE CONSTRUCTION, DYNAMITER (CARROLL (TOWNSHIPS OF FAIR HAVEN, FREEDOM, MOUNT CARROLL, SALEM, SAVANNA, WASHINGTON, WOODLAND & YORK), JO DAVIESS (TOWNSHIPS OF COUNCIL HILL, DERINDA, DUNLEITH, EAST GALENA, ELIZABETH, GUILFORD, HANOVER, MENOMINEE, RAWLINS, RICE, SCALES MOUND, VINEGAR HILL & WEST GALENA), HENRY (EXCEPT ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS) ROCK ISLAND & WHITESIDE (TOWNSHIPS OF ALBANY, CLYDE, ERIE, FENTON, FULTON, GARDEN PLAIN, LYNDON, | 43.92 | 21.49 | 65.41 |
| LINE CONSTRUCTION, GROUNDMAN (CARROLL (TOWNSHIPS OF FAIR HAVEN, FREEDOM, MOUNT CARROLL, SALEM, SAVANNA, WASHINGTON, WOODLAND & YORK), JO DAVIESS (TOWNSHIPS OF COUNCIL HILL, DERINDA, DUNLEITH, EAST GALENA, ELIZABETH, GUILFORD, HANOVER, MENOMINEE, RAWLINS, RICE, SCALES MOUND, VINEGAR HILL & WEST GALENA), HENRY (EXCEPT ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS) ROCK ISLAND & WHITESIDE (TOWNSHIPS OF ALBANY, CLYDE, ERIE, FENTON, FULTON, GARDEN PLAIN, LYNDON, | 34.64 | 18.43 | 53.07 |
| LINE CONSTRUCTION, GROUNDMAN EQUIPMENT OPERATOR (CARROLL (TOWNSHIPS OF FAIR HAVEN, FREEDOM, MOUNT CARROLL, SALEM, SAVANNA, WASHINGTON, WOODLAND & YORK), JO DAVIESS (TOWNSHIPS OF COUNCIL HILL, DERINDA, DUNLEITH, EAST GALENA, ELIZABETH, GUILFORD, HANOVER, MENOMINEE, RAWLINS, RICE, SCALES MOUND, VINEGAR HILL & WEST GALENA), HENRY (EXCEPT ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS) ROCK ISLAND & WHITESIDE (TOWNSHIPS OF ALBANY, CLYDE, ERIE, FENTON, FULTON, GA | 41.61 | 20.73 | 62.34 |
| LINE CONSTRUCTION, GROUNDMAN TRUCK DRIVER (CARROLL (TOWNSHIPS OF FAIR HAVEN, FREEDOM, MOUNT CARROLL, SALEM, SAVANNA, WASHINGTON, WOODLAND & YORK), JO DAVIESS (TOWNSHIPS OF COUNCIL HILL, DERINDA, DUNLEITH, EAST GALENA, ELIZABETH, GUILFORD, HANOVER, MENOMINEE, RAWLINS, RICE, SCALES MOUND, VINEGAR HILL & WEST GALENA), HENRY (EXCEPT ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS) ROCK ISLAND & WHITESIDE (TOWNSHIPS OF ALBANY, CLYDE, ERIE, FENTON, FULTON, GARDEN P | 36.15 | 18.93 | 55.08 |
| LINE CONSTRUCTION, LINEMAN, TECHNICIAN, HEAVY EQUIPMENT OPERATOR (CARROLL (TOWNSHIPS OF FAIR HAVEN, FREEDOM, MOUNT CARROLL, SALEM, SAVANNA, WASHINGTON, WOODLAND & YORK), JO DAVIESS (TOWNSHIPS OF COUNCIL HILL, DERINDA, DUNLEITH, EAST GALENA, ELIZABETH, GUILFORD, HANOVER, MENOMINEE, RAWLINS, RICE, SCALES MOUND, VINEGAR HILL & WEST GALENA), HENRY (EXCEPT ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS) ROCK ISLAND & WHITESIDE (TOWNSHIPS OF ALBANY, CLYDE, ERIE, F | 52.67 | 24.38 | 77.05 |
| CABLE SPLICER (CARROLL (CHADWICK, MT. CARROLL, SAVANNA AND THOMPSON TWPS), HENRY (EXCLUDING ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS), JO DAVIESS (SAVANNA ORDNANCE DEPOT), WHITESIDE (REMAINDER OF COUNTY), AND ROCK ISLAND COUNTIES) | 47.00 | 28.64 | 75.64 |
| ELECTRICIAN (CARROLL (CHADWICK, MT. CARROLL, SAVANNA AND THOMPSON TWPS), HENRY (EXCLUDING ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WESTERFIELD TWPS), JO DAVIESS (SAVANNA ORDNANCE DEPOT), WHITESIDE (REMAINDER OF COUNTY), AND ROCK ISLAND COUNTIES) | 46.00 | 28.56 | 74.56 |
| ELECTRICIAN (BUREAU AND HENRY (ANNAWAN, BURNS, CAMBRIDGE, GALVA, KEWANEE, WELLER, AND WETHERSFIELD TWPS) COUNTIES) | 50.45 | 44.96 | 95.41 |
| LINE CONSTRUCTION, LINEMAN, SUBSTATION TECHNICIAN, CABLE SPLICING TECHNICIAN, DIGGER OPERATOR, CRANE OPERATOR 20 TONS AND ABOVE, AND SIGNAL TECHNICIAN (CARROLL (TOWNSHIPS OF CHERRY GROVE, ELKHORN GROVE, LIMA, ROCK CREEK, SHANNON & WYSOX), JO DAVIESS (TOWNSHIPS OF APPLE RIVER, BERREMAN, PLEASANT VALLEY, NORA, RUSH, STOCKTON, THOMPSON, WARDS GROVE, WARREN & WOODBINE), LEE, OGLE, STEPHENSON, WHITESIDE (TOWNSHIPS OF GENESEE, HAHNAMAN, HOPKINS, HUME, JORDAN, MONTMORENCY, STERLING & TAPI | 59.17 | 27.12 | 86.29 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR (CARROLL (TOWNSHIPS OF CHERRY GROVE, ELKHORN GROVE, LIMA, ROCK CREEK, SHANNON & WYSOX), JO DAVIESS (TOWNSHIPS OF APPLE RIVER, BERREMAN, PLEASANT VALLEY, NORA, RUSH, STOCKTON, THOMPSON, WARDS GROVE, WARREN & WOODBINE), LEE, OGLE, STEPHENSON, WHITESIDE (TOWNSHIPS OF GENESEE, HAHNAMAN, HOPKINS, HUME, JORDAN, MONTMORENCY, STERLING & TAPICO) & WINNEBAGO COUNTIES) FOOTNOTE: A. PAID HOLIDAYS MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | 49.22 | 23.73 | 72.95 |
| LINE CONSTRUCTION: GROUNDMAN (CARROLL (TOWNSHIPS OF CHERRY GROVE, ELKHORN GROVE, LIMA, ROCK CREEK, SHANNON & WYSOX), JO DAVIESS (TOWNSHIPS OF APPLE RIVER, BERREMAN, PLEASANT VALLEY, NORA, RUSH, STOCKTON, THOMPSON, WARDS GROVE, WARREN & WOODBINE), LEE, OGLE, STEPHENSON, WHITESIDE (TOWNSHIPS OF GENESEE, HAHNAMAN, HOPKINS, HUME, JORDAN, MONTMORENCY, STERLING & TAPICO) & WINNEBAGO COUNTIES) FOOTNOTE: A. PAID HOLIDAYS MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | 37.81 | 19.86 | 57.67 |
| LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (CARROLL (TOWNSHIPS OF CHERRY GROVE, ELKHORN GROVE, LIMA, ROCK CREEK, SHANNON & WYSOX), JO DAVIESS (TOWNSHIPS OF APPLE RIVER, BERREMAN, PLEASANT VALLEY, NORA, RUSH, STOCKTON, THOMPSON, WARDS GROVE, WARREN & WOODBINE), LEE, OGLE, STEPHENSON, WHITESIDE (TOWNSHIPS OF GENESEE, HAHNAMAN, HOPKINS, HUME, JORDAN, MONTMORENCY, STERLING & TAPICO) & WINNEBAGO COUNTIES) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | 39.19 | 20.32 | 59.51 |
| ELECTRICIAN (CARROLL (CHERRY GROVE, SHANNON, ROCK CREEK, LIMA, WYSOX, ELKHORN GROVE TWPS), JO DAVIESS (WARREN, RUSH, NORA, STOCKTON, WARDS GROVE, PLEASANT VALLEY, AND BERRENMAN TWPS), LEE, OGLE, STEPHENSON, WHITESIDE (GENESEE, JORDAN, HOPKINS, STERLING, HUME, MONTGOMERY, TAMPICO, AND HAHNAMAN TWPS) AND WINNEBAGO COUNTIES) | 62.61 | 43.96 | 106.57 |
| EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE MINING MACHINES- BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR | 56.60 | 51.05 | 107.65 |
| OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. UNDERGROUND WORK EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE. MINING MACHINES- BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE (EASTERN HALF) AND WINNEBAGO COUNTIES) | 56.05 | 51.05 | 107.10 |
| EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA. TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE MINING MACHINES- BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR | 54.75 | 51.05 | 105.80 |
| TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA TRUCK MOUNTED CONCRETE CONVEYOR: TRUCK MOUNTED CONCRETE CONVEYORS EQUIPPED WITH CONVEYORS THAT ARE CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR UNDERGROUND WORK: EMPLOYEES WORKING IN TUNNELS, SHAFTS, ETC. SHALL BE PAID AN ADDITIONAL $.40 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE 1/2 POUND TO 7 POUNDS SHALL RECEIVE AN ADDITIONAL $.50 PER HOUR. EMPLOYEES WORKING UNDER AIR PRESSURE OF 7 POUNDS OR OVER SHALL RECEIVE $.65 PER HOUR MORE MINING MACHINES- BORING MACHINES: THE CREW OPERATING AND MAINTAINING THE MINING MACHINES SHALL BE COMPENSATED AN ADDITIONAL $.50 PER HOUR | 53.30 | 51.05 | 104.35 |
| OPERATOR: POWER EQUIPMENT, GROUP 5 OILERS (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE (EASTERN HALF) AND WINNEBAGO COUNTIES) | 50.85 | 51.05 | 101.90 |
| POST DRIVER MOUNTED*; HOISTS, ONE, TWO, AND THREE DRUM; HYDRAULIC BACKHOES; LOCOMOTIVE, ALL MUCKING MACHINE; PILE DRIVERS AND SKID RIG*; PRE- STRESS MACHINE; PUMP CRETES DUAL RAM (REQUIRES FREQUENT LUBRICATION AND WATER)*; ROCK/TRACK TAMPER; ROCK DRILL TRUCK MOUNTED; ROTO MILL GRINDER, 36"" AND OVER*; ROTO MILL GRINDER, LESS THAN 36""; SLIP- FORM PAVER*; SOIL TEST DRILL RIG, TRUCK MOUNTED*; STRADDLE BUGGIES; HYDRAULIC TELESCOPING FORM (TUNNEL); TRACTOR DRAWN BELT LOADER*; TRACTOR DRAWN BELT LOADER WITH ATTACHED PUSHER (TWO ENGINEERS); TRACTOR WITH BOOM; TRACTAIRE WITH ATTACHMENTS; RAISED OR BLIND HOE DRILL (TUNNEL & SHAFT)*; TRENCHING MACHINE; TRUCK MOUNTED CONCRETE PUMP WITH BOOM; UNDERGROUND BORING AND/OR MINING MACHINES 5 FT IN DIAMETER AND OVER TUNNEL, ETC.*; UNDERGROUND BORING AND/OR MINING MACHINES UNDER 5 FT; WHEEL EXCAVATOR* & WIDENER (APSCO) (BUREAU COUNTY (THE PORTION LYING EAST AND NORTH OF HIGHWAY 26 FROM THE TOWN OR VILLAGE OF BUREAU TO THE NORTHERN BUREAU COUNTY LINE.)) *EQUIPMENT REQUIRES AN OILER | 63.00 | 51.00 | 114.00 |
| ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADER; HOIST-SEWER DRAGGING MACHINE; HYDRAULIC BOOM TRUCKS, ALL ATTACHMENTS; HYDRO- BLASTER REQUIRES TWO OPERATORS (ONE GROUP 4); HYDRAULIC BOOM TRUCKS (ALL ATTACHMENTS);LOCOMOTIVES, DINKY; OFF-ROAD HAULING UNITS (INCLUDING ARTICULATING); LASER SCREED; PUMP CRETES, SQUEEZE CRETES-SCREW TYPE PUMPS, GYPSUM BULKER AND PUMP; ROCK DRILL-CRAWLER OR SKID*; ROCK DRILL-TRUCK MOUNTED*; ROLLER ASPHALT; ROTARY SNOW PLOWS; ROTOTILLER, SEAMAN, ETC. SELF- PROPELLED; SCOOPS-TRACTOR DRAWN; SELF-PROPELLED COMPACTOR; SPREADER-CHIP-STONE ETC; SCRAPER; SCRAPER-PRIME MOVER IN TANDEM REGARDLESS OF SIZE (ADD $1.00 TO TO GROUP 2 HOURLY RATE FOR EACH HOUR AND FOR EACH MACHINE ATTACHED THERETO); TANK CAR HEATER; TRACTORS, PUSH, PULLING SHEEPS FOOT, DISC, COMPACTOR, ETC; TUG BOATS (BUREAU COUNTY (THE PORTION LYING EAST AND NORTH OF HIGHWAY 26 FROM THE TOWN OR VILLAGE OF BUREAU TO THE NORTHERN BUREAU COUNTY LINE.)) *EQUIPMENT REQUIRES AN OILER | 62.45 | 51.00 | 113.45 |
| OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES; HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS, TUGGER SINGLE DRUM; JEEP DIGGERS; LOW BOYS; PIPE JACKING MACHINES; POST-HOLE DIGGER; POWER SAW, CONCRETE, POWER DRIVEN; PUG MILLS; ROLLERS, OTHER THAN ASPHALT; SEED AND STRAW BLOWER; STEAM GENERATORS; STUMP MACHINE; WINCH TRUCKS WITH A-FRAME; WORK BOATS;TAMPER-FORM MOTOR DRIVEN (BUREAU COUNTY (THE PORTION LYING EAST AND NORTH OF HIGHWAY 26 FROM THE TOWN OR VILLAGE OF BUREAU TO THE NORTHERN BUREAU COUNTY LINE.)) | 60.40 | 51.00 | 111.40 |
| OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR - SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 250; COMBINATION - SMALL EQUIPMENT OPERATOR; GENERATORS - SMALL 50 KW AND UNDER; GENERATORS - LARGE, OVER 50 KW; HEATERS, MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING, EXTRACTING OR DRILLING); HYDRO-BLASTER REQUIRES TWO OPERATORS (ONE GROUP 2); LIGHT PLANTS ALL (1 TO 5); PUMPS, OVER 3"" (1 TO 3, NOT TO EXCEED A TOTAL OF 300 FT); TRACTAIRE; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES (BUREAU COUNTY (THE PORTION LYING EAST AND NORTH OF HIGHWAY 26 FROM THE TOWN OR VILLAGE OF BUREAU TO THE NORTHERN BUREAU COUNTY LINE.)) | 59.00 | 51.00 | 110.00 |
| OPERATOR: POWER EQUIPMENT, GROUP 5 BOBCATS (ALL); BRICK FORKLIFTS; DIRECTIONAL BORING MACHINE LOCATOR; OILERS (BUREAU COUNTY (THE PORTION LYING EAST AND NORTH OF HIGHWAY 26 FROM THE TOWN OR VILLAGE OF BUREAU TO THE NORTHERN BUREAU COUNTY LINE.)) | 57.80 | 51.00 | 108.80 |
| OPERATOR: POWER EQUIPMENT, GROUP 1 CRANE (FRICTION OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS); TOW OR PUSH BOAT (HENRY (WESTERN HALF), ROCK ISLAND, AND WHITESIDE (WESTERN HALF) COUNTIES) | 43.50 | 41.25 | 84.75 |
| ROCK ISLAND, AND WHITESIDE (WESTERN HALF) COUNTIES).$ 41.50 41.25 OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER (ENGINEER OR FIREMAN); CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE OR SIMILAR MACHINES; ELEVATOR; FARM-TYPE TRACTOR (WITHOUT POWER ATTACHMENT); FIREMAN & PUMP OPERATOR AT ASPHALT PLANT; FORKLIFT (LESS THAN 6000 LB CAPACITY); GROUT PUMP; LIGHT PLANT; MECHANICAL BROOM; MUD JACK; SELF-PROPELLED ROLLER (OTHER THAN LISTED IN GROUP 2); STRADDLE CARRIER; TRENCH MACHINE (UNDER 40 H.P.). (HENRY (WESTERN HALF), ROCK ISLAND, AND WHITESIDE (WESTERN HALF) COUNTIES).$ 38.85 41.25 OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR (400 C.F.M. OR OVER); COMPACT LOADER (RUBBER TIRE, TRACK & UTILITY); ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER (OTHER THAN STEAM BOILER); SMALL OUTBOARD MOTOR BOAT (SAFETY BOAT & LIFE BOAT); WATER PUMP (MORE THAN ONE WELL POINT PUMP). (HENRY (WESTERN HALF), ROCK ISLAND, AND WHITESIDE (WESTERN HALF) COUNTIES) | 37.80 | 41.25 | 79.05 |
| DREDGE LEVERMAN; DREDGE ENGINEER; LULL OR SIMILAR TYPE; HYDRO-BOOM TRUCK; GUARD RAIL MACHINE. (HENRY (EASTERN HALF) AND BUREAU (WESTERN HALF) COUNTIES) - ESCALATED RATE ON CRANE, DERRICK BOOMS, AND TOWER CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE ADJACENT GROUND LEVEL OR WATER LEVEL. $.05 PER HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB $0.02 PER HOUR, PER TON - OVER 50-TON CAPACITY. - OPERATING ENGINEERS WHO OPERATE LATTICE BOOM CRAWLER CRANES, LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL RECEIVE $1.60 PER HOUR OVER SCALE. A. ON DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE GROUP RATE; LEVELS B AND C ADD $3.00 TO THE APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO THE APPROPRIATE GROUP RATE | 47.79 | 43.42 | 91.21 |
| TO THE APPROPRIATE GROUP RATE | 44.09 | 43.42 | 87.51 |
| ROLLERS, 5 TONS & UNDER ON EARTH & GRAVEL; FORM GRADER; BULK CEMENT PLANT; OILERS. (HENRY (EASTERN HALF) AND BUREAU (WESTERN HALF) COUNTIES) - ESCALATED RATE ON CRANE, DERRICK BOOMS, AND TOWER CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE ADJACENT GROUND LEVEL OR WATER LEVEL. $.05 PER HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB. $0.02 PER HOUR, PER TON - OVER 50-TON CAPACITY. - OPERATING ENGINEERS WHO OPERATE LATTICE BOOM CRAWLER CRANES, LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL RECEIVE $1.60 PER HOUR OVER SCALE. A. ON DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE GROUP RATE; LEVELS B AND C ADD $3.00 TO THE APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO THE APPROPRIATE GROUP RATE | 38.03 | 43.42 | 81.45 |
| IRONWORKER (CARROLL (THOMPSON, SAVANNA & VICINITY), HENRY, JO DAVIESS (EAST DUBUQUE, GALENA, HANOVER, & VICINITY), KNOX (GALESBURG AND AREA NORTH OF THE CITY), MERCER (EXCEPT SOUTHWEST PART), ROCK ISLAND, WARREN (INCLUDES NORTHWEST PART), AND WHITESIDE (WESTERN HALF) COUNTIES) | 38.25 | 32.28 | 70.53 |
| IRONWORKER (BUREAU COUNTY) | 45.50 | 38.90 | 84.40 |
| IRONWORKER (CARROLL (REMAINDER), JO DAVIESS (REMAINDER), LEE, OGLE, STEPHENS, WHITESIDE (EASTERN HALF), AND WINNEBAGO COUNTIES) | 41.37 | 44.41 | 85.78 |
| LABORER: GENERAL LABORER: CARPENTER TENDER, TOOL CRIBMAN, FIREMAN OR SALAMANDER TENDER, FLAGMAN, GRAVEL BOX MAN, BUMPMAN & SPOTTER, FORM HANDLER, MATERIAL HANDLER, FENCING LABORER, CLEANING LUMBER, PIT MAN, MATERIAL CHECKER, LANDSCAPER, UNLOADING EXPLOSIVES, LAYING OF SOD, PLANTING OF TREES, ASPHALT WORKERS WITH MACHINE & LAYERS, ASPHALT PLANT LABORER, WRECKING, FIRE-PROOFING, DRIVING STAKES, STRINGLINES FOR ALL MACHINERY, WINDOW CLEANING, DEMOLITION WORKER, EXPLOSIVE HANDLING, TRIMMING & REMOVAL OF TREES, MULTI-PLATE PIPE, PILOT CARS FOR TRAFFIC CONTROL, POWER RIGGING (WINNEBAGO COUNTY) | 47.04 | 36.31 | 83.35 |
| PLACING CUTTING & TYING OF REINFORCING, DECK HAND, DREDGE HAND AND SHORE LABORER, BANKMAN ON FLOATING PLANT, GRADE CHECKER, POWER TOOLS, FRONT END MAN ON CHIP SPREADER, CAISSON WORKER PLUS DEPTH, GUNNITE NOZZLEMAN, LEADMAN ON SEWER WORK, WELDER, CUTTER, BURNER & TORCHMAN, CHAIN SAW OPERATOR, JACKHAMMER & DRILL OPERATOR, LAYOUT MAN AND/OR TILE LAYER, STEEL FORM SETTER - STREET & HIGHWAY, AIR TAMPING HAMMERMAN, SIGNAL MAN ON CRANE, CONCRETE SAW OPERATOR, SCREENMAN ON ASPHALT PAVER, TENDING MASONS WITH HOT MATERIAL OR WHERE FOREIGN MATERIALS ARE USED, MORTAR MIXER OPERATOR, MULTIPLE CONCRETE DUCT - LEADMAN, LUTEMAN, ASPHALT RAKER, CURB ASPHALT MACHINE OPERATOR, READY MIX SCALEMAN PERMANENT PORTABLE OR TEMPORARY PLANT, LABORER HANDLING MASTERPLATE OR SIMILAR MATERIALS, LASER BEAM OPERATOR, CONCRETE BURNING MACHINE OPERATOR, CORING MACHINE OPERATOR, PLASTER TENDER, UNDERPINNING & SHORING OF BUILDINGS, PUMP MAN, MANHOLE & CATCH BASIN, DIRT & STONE TAMPER, HOSEMAN ON CONCRETE PUMP. (WINNEBAGO COUNTY) | 50.39 | 36.31 | 86.70 |
| COVERED), CRAFT- TENDER, MATERIAL CHECKER, MATERIAL HANDLER, FORM HANDLER, CONCRETE DUMPER, PUDDLER, EXPLOSIVES HANDLER, CENTER STRIP, REINFORCING IN CONCRETE, WIRE MESH HANDLER AND INSTALLER, PRIME MOVER OR ANY MECHANICAL DEVICE TAKING THE PLACE OF CONCRETE BUGGY OR WHEEL-BARROW, SANDPOINT SETTER, ASPHALT KETTLEMAN, SHEETING HAMMER DRIVERS, LAYING AND JOINING OF TELEPHONE CONDUIT, GAS DISTRIBUTION MEN, PIPE SETTER ON LATERALS, DRAIN TILES, CULVERT PIPE, AND STORM SEWER CATCH BASIN LEADS, CATCH BASINS, MANHOLES, BATCH DUMPERS, TANK CLEANERS, COFFERDAM WORKER, BANKMAN ON FLOATING PLANT, JOINTMAN WITH PIPELAYERS BACK-UP MAN (CORKER, JOINT MAKER) WITH PIPE SETTER ON SEWER AND WATER MAINS, BATTERBOARD MAN OR LASER OPERATOR ON SEWER AND WATER MAIN, LABORER IN DITCH, OR TUNNEL, ON SEWER OR WATER MAINS AND TELEPHONE CONDUIT, CUTTERS, BURNERS, TORCHMAN, GRAVEL BOX MAN, ASPHALT PLANT LABORER, CONCRETE PLANT LABORER, DECK HAND, UNLOADING OF STEEL AND REBAR, LASER BEAM OPERATOR, WRECKING LABORERS. (ROCK ISLAND COUNTY) | 33.77 | 23.60 | 57.37 |
| LABORER GROUP 2 ASPHALT RAKER OR LUTEMAN, HEAD FORM SETTER, HEAD DYNAMITE MAN (POWDERMAN) HEAD STRING OR WIRELINE MAN (ON PAVING), PIPE SETTER ON SEWER OR WATER MAIN, GUNNITE NOZZLE MAN, ASPHALT OR CONCRETE CURB MACHINE OPERATOR, HEAD GRADE MAN, HEAD TUNNEL MINER, CONCRETE BURNING MACHINE OPERATOR, CORING MACHINE OPERATOR, WELDER, HAZARDOUS WASTE WORKER, ASBESTOS ABATEMENT WORKER (ROCK ISLAND COUNTY) | 34.27 | 23.60 | 57.87 |
| LABORER GROUP 3 CONCRETE SPECIALIST (ROCK ISLAND COUNTY) | 34.90 | 23.60 | 58.50 |
| LABORER GROUP 1 UNSKILLED - ALL CLASSIFICATIONS NOT LISTED (BUREAU COUNTY) | 40.54 | 32.42 | 72.96 |
| CLOTHING; TRACK LABORERS; CEMENT HANDLERS; CHLORIDE HANDLERS; UNLOADING AND LABORERS WITH STEEL WORKERS AND RE-BARS; CONCRETE WORKERS )WET); BATCH DUMPERS; MASON TENDERS; KETTLE AND TAR MEN; TANK CLEANERS; PLASTIC INSTALLERS; SCAFFOLD WORKERS; MOTORIZED BUGGIES OR MOTORIZED UBIT USED FOR WET CONCRETE OR HANDLING OF BUILDING MATERIALS; LABORERS WITH DE-WATERING SYSTEMS; SEWER WORKERS PLUS DEPTH; VIBRATOR OPERATORS; MOTOR MIXER OPERATORS; CEMENT SILICA, CLAY, FLY ASH, LIME AND PLASTERS, HANDLERS (BULK OR BAG); COFFERDAM WORKERS PLUS DEPTH; CONCRETE PAVING, PLACING, CUTTING AND TYING OF REINFORCING; DECK HAND, DREDGE HAND AND SHORE LABORERS; BACKMEN ON FLOATING PLANT; ASPHALT WORKERS WITH MACHINE AND LAYERS; GRADE CHECKER; POWER TOOLS; DRIVING ALL STAKES, STRINGLINES FOR ALL MACHINERY; SETTING AND BUILDING OF MANHOLES AND CATCH BASINS; STRIPPING OF ALL CONCRETE FORMS EXCEPT PAVING FORMS; ALL CONCRETE PAVING AND SLOPE WALLS, PLACING, CUTTING AND TYING OF REINFORCING (RE-BARS AND WIRE MESH) (BUREAU COUNTY) | 40.54 | 32.42 | 72.96 |
| LABORER GROUP 3 SKILLED - MASON TENDERS; CAISSON WORKERS PLUS DEPTH; GUNNITE NOZZLE MEN; LEAD MAN ON SEWER WORK; WELDERS, CUTTERS, BURNERS & TORCHMEN; CHAIN SAW OPERATORS; PAVING BREAKER, JACKHAMMER & DRILL OPERATORS; LAYOUT MAN AND/OR TILE LAYER; STEEL FORM SETTERS (STREET & HWY); AIR TAMPING HAMMERMAN; SIGNAL MAN ON CRANE; CONCRETE SAW OPERATOR; SCREENMAN ON ASPHALT PAVERS; FRONT END MAN ON CHIP SPREADER; LABORERS TENDING MASONS WITH HOT MATERIALS OR WHERE FOREIGN MATERIALS ARE USED; MULTIPLE CONCRETE DUCT-LEADMAN; LUTEMAN; ASPHALT RAKER; CURB ASPHALT MACHINE OPERATOR; READY MIX SCALEMEN, PERMANENT, PORTABLE OR TEMPORARY PLANT; LABORERS HANDLING MASTERPLATE OR SIMILAR MATERIALS; LASER BEAM OPERATOR; CORING MACHINE OPERATOR; PLASTERER TENDERS; UNDERPINNING AND SHORING OF BUILDING; MATERIAL SELECTOR WHEN WORKING WITH FIREBRICK OR CASTABLE MATERIALS; FIRE WATCH; SIGNALLING OF ALL POWER EQUIPMENT; TREE TOPPER OR TRIMMER (BUREAU COUNTY) | 40.54 | 32.42 | 72.96 |
| LABORER GROUP 4 DYNAMITE MAN (BUREAU COUNTY) | 41.54 | 32.42 | 73.96 |
| LABORER GROUP 5 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER (BUREAU COUNTY) | 42.54 | 32.42 | 74.96 |
| LABORER: GENERAL LABORER: ALL CLASSIFICATIONS NOT LISTED BELOW. (HENRY COUNTY) | 35.23 | 28.10 | 63.33 |
| OPERATOR; PAVING BREAKER, JACKHAMMER AND DRILL OPERATOR, LAYOUT MAN AND /OR TILE LAYER; STEEL FORM SETTERS - STREET AND HIGHWAY, AIR TAMPING HAMMERMAN; SIGNALMAN ON CRANE CONCRETE SAW OPERATOR; SCREEDMAN ON ASPHALT PAVERS; FRONT END MAN ON CHIP SPREADER; MULTIPLE CONCRETE DUCT; LUTEMAN, ASPHALT RAKER; CURB ASPHALT MACHINE OPERATOR. (HENRY COUNTY) | 36.23 | 28.10 | 64.33 |
| LABORER: GENERAL LABORER: CARPENTER TENDER, TOOL CRIBMAN, FIREMAN OR SALAMANDER TENDER, FLAGMAN, GRAVEL BOX MAN, DUMPMAN & SPOTTER, FORM HANDLER, MATERIAL HANDLER, FENCING LABORER, CLEANING LUMBER, PIT MAN, UNLOADING EXPLOSIVES, REMOVAL OF TREES, ASPHALT WORKERS WITH MACHINE & LAYERS, ASPHALT PLANT LABORER, WRECKING, FIREPROOFING, DRIVING STAKES, STRINGLINES FOR ALL MACHINERY, WINDOW CLEANING. (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, AND WHITESIDE COUNTIES) | 49.17 | 34.25 | 83.42 |
| LABORER, BANKMAN ON FLOATING PLANT, GRADE CHECKER, POWER TOOLS, FRONT END MAN ON CHIP SPREADER, CAISSON WORKER PLUS DEPTH, GUNNITER NOZZLEMAN, LEADMAN ON SEWER WORK, WELDER, CUTTER, BURNER & TORCHMAN, CHAIN SAW OPERATOR, JACKHAMMER & DRILL OPERATOR, LAYOUT MAN AND/OR TILE LAYER, STEEL FORM SETTER - STREET & HIGHWAY, AIR TAMPING HAMMERMAN, SIGNAL MAN ON CRANE, CONCRETE SAW OPERATOR, SCREENMAN ON ASPHALT PAVER, TENDING MASONS WITH HOT MATERIAL OR WHERE FOREIGN MATERIALS ARE USED, MORTAR MIXER OPERATOR, MULTIPLE CONCRETE DUCT - LEADMAN, LUTEMAN, ASPHALT RAKER CURB ASPHALT MACHINE OPERATOR, READY MIX SCALEMAN PERMANENT PORTABLE OR TEMPORARY PLANT, LABORER HANDLING MASTERPLATE OR SIMILAR MATERIALS, LASER BEAM OPERATOR, CONCRETE BURNING MACHINE OPERATOR, CORING MACHINE OPERATOR, PLASTER TENDER, UNDERPINNING & SHORING OF BUILDINGS, PUMP MAN, MANHOLE & CATCH BASIN, DIRT & STONE TAMPER, HOSEMAN ON CONCRETE PUMP. (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, AND WHITESIDE COUNTIES) | 52.52 | 34.25 | 86.77 |
| PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL (BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES) | 45.15 | 29.41 | 74.56 |
| PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES (BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON, MCDONOUGH, MCLEAN, PUTNAM AND STARK COUNTIES) | 40.00 | 26.90 | 66.90 |
| PAINTER: BRIDGES (CARROLL, HENRY, ROCK ISLAND, AND WHITESIDE COUNTIES) | 32.00 | 17.37 | 49.37 |
| PAINTER: BRUSH AND ROLLER (CARROLL, HENRY, ROCK ISLAND, AND WHITESIDE COUNTIES) | 30.00 | 17.37 | 47.37 |
| PAINTER: SPRAY, STRUCTURAL STEEL, & SANDBLASTING (CARROLL, HENRY, ROCK ISLAND, AND WHITESIDE COUNTIES) | 30.50 | 17.37 | 47.87 |
| CEMENT MASON/CONCRETE FINISHER (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, AND WHITESIDE (EXCEPT ERIE AND AREA SOUTHWEST THEREOF) COUNTIES) | 38.48 | 38.77 | 77.25 |
| PLASTERER (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, AND WHITESIDE (EXCEPT ERIE AND AREA SOUTHWEST THEREOF) COUNTIES) | 38.98 | 36.58 | 75.56 |
| CEMENT MASON/CONCRETE FINISHER (BUREAU COUNTY) | 40.50 | 33.54 | 74.04 |
| CEMENT MASON/CONCRETE FINISHER (WINNEBAGO COUNTY) | 41.03 | 36.39 | 77.42 |
| CEMENT MASON/CONCRETE FINISHER (HENRY COUNTY) | 36.70 | 22.08 | 58.78 |
| TRUCK DRIVER: 2 OR 3 AXLES (CARROLL (NORTH OF ROUTE. #72 & EAST OF ROUTE #78), JODAVIESS (EAST OF ROUTE #78, EXCLUDING STOCKTON), STEPHENSON, AND WINNEBAGO COUNTIES) FOOTNOTE: .20 CENTS ADDITIONAL PER AXLE OVER 6 AXLES | 48.47 | 26.70 | 75.17 |
| TRUCK DRIVER: 4 AXLES (CARROLL (NORTH OF ROUTE #72 & EAST OF ROUTE #78), JODAVIESS (EAST OF ROUTE #78, EXCLUDING STOCKTON), STEPHENSON, AND WINNEBAGO COUNTIES) FOOTNOTE: .20 CENTS ADDITIONAL PER AXLE OVER 6 AXLES | 48.62 | 26.70 | 75.32 |
| TRUCK DRIVER: 5 AXLES (CARROLL (NORTH OF ROUTE #72 & EAST OF ROUTE #78), JODAVIESS (EAST OF ROUTE #78, EXCLUDING STOCKTON), STEPHENSON, AND WINNEBAGO COUNTIES) FOOTNOTE: .20 CENTS ADDITIONAL PER AXLE OVER 6 AXLES | 48.82 | 26.70 | 75.52 |
| TRUCK DRIVER: 6 AXLES (CARROLL (NORTH OF ROUTE #72 & EAST OF ROUTE #78), JODAVIESS (EAST OF ROUTE #78, EXCLUDING STOCKTON), STEPHENSON, AND WINNEBAGO COUNTIES) FOOTNOTE: .20 CENTS ADDITIONAL PER AXLE OVER 6 AXLES | 48.93 | 26.70 | 75.63 |
| VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | 44.83 | 0.30 | 45.13 |
| VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | 44.98 | 0.30 | 45.28 |
| VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | 45.18 | 0.30 | 45.48 |
| VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | 45.38 | 0.30 | 45.68 |
| TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (HENRY AND ROCK ISLAND COUNTIES) | 45.35 | 25.72 | 71.07 |
| TRUCK DRIVER, GROUP 2 (HENRY AND ROCK ISLAND COUNTIES) | 45.93 | 25.72 | 71.65 |
| TRUCK DRIVER, GROUP 3 (HENRY AND ROCK ISLAND COUNTIES) | 46.25 | 25.72 | 71.97 |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS (HENRY AND ROCK ISLAND COUNTIES) | 46.60 | 25.72 | 72.32 |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (HENRY AND ROCK ISLAND COUNTIES) | 47.71 | 25.72 | 73.43 |
| TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (BUREAU, CARROLL (WEST OF ROUTE78/SOUTH OF ROUTE 72), JODAVIESS (WEST OF ROUTE 78), LEE (WEST OF ROUTE 251), OGLE (SOUTH OF ROUTE 72/WEST OF ROUTE 251), AND WHITESIDE COUNTIES) | 45.29 | 25.42 | 70.71 |
| TRUCK DRIVER, GROUP 2 (BUREAU, CARROLL (WEST OF ROUTE78/SOUTH OF ROUTE 72), JODAVIESS (WEST OF ROUTE 78), LEE (WEST OF ROUTE 251), OGLE (SOUTH OF ROUTE 72/WEST OF ROUTE 251), AND WHITESIDE COUNTIES) | 45.88 | 25.42 | 71.30 |
| TRUCK DRIVER, GROUP 3 (BUREAU, CARROLL (WEST OF ROUTE78/SOUTH OF ROUTE 72), JODAVIESS (WEST OF ROUTE 78), LEE (WEST OF ROUTE 251), OGLE (SOUTH OF ROUTE 72/WEST OF ROUTE 251), AND WHITESIDE COUNTIES) | 46.15 | 25.42 | 71.57 |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS (BUREAU, CARROLL (WEST OF ROUTE78/SOUTH OF ROUTE 72), JODAVIESS (WEST OF ROUTE 78), LEE (WEST OF ROUTE 251), OGLE (SOUTH OF ROUTE 72/WEST OF ROUTE 251), AND WHITESIDE COUNTIES) | 46.54 | 25.42 | 71.96 |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (BUREAU, CARROLL (WEST OF ROUTE78/SOUTH OF ROUTE 72), JODAVIESS (WEST OF ROUTE 78), LEE (WEST OF ROUTE 251), OGLE (SOUTH OF ROUTE 72/WEST OF ROUTE 251), AND WHITESIDE COUNTIES) | 47.64 | 25.42 | 73.06 |