Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | 26.79 | 17.34 | 44.13 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) | 40.00 | 18.74 | 58.74 |
| POWER EQUIPMENT OPERATOR: GROUP 7 CRANE (OVER 50 TONS), TOWER CRANE ZONE PAY: ZONE CENTERS BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES $30.00/PER DAY ZONE 3 MORE THAN 60 MILES $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | 37.35 | 16.10 | 53.45 |
| POWER EQUIPMENT OPERATOR: GROUP 6 CRANE (UP TO AND INCLUDING 50 TON) ZONE PAY: ZONE CENTERS BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES $30.00/PER DAY ZONE 3 MORE THAN 60 MILES $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | 36.98 | 16.10 | 53.08 |
| POWER EQUIPMENT OPERATOR: GROUP 3 FORKLIFT ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | 36.33 | 16.10 | 52.43 |
| IRONWORKER, STRUCTURAL | 33.37 | 22.98 | 56.35 |
| LABORER: GROUP 4 MASON TENDER (CEMENT/CONCRETE & BRICK ) | 33.93 | 16.50 | 50.43 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | 12.09 | 5.33 | 17.42 |
| PLUMBER | 36.75 | 18.93 | 55.68 |
| TRUCK DRIVER: DUMP TRUCK | 16.06 | — | 16.06 |
| ROOFER | 19.00 | — | 19.00 |
| OPERATOR: LOADER (FRONT END) | 21.27 | 5.54 | 26.81 |
| OPERATOR: BULLDOZER | 24.52 | 7.87 | 32.39 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 16.28 | — | 16.28 |
| OPERATOR: BACKHOE/EXCAVATOR | 22.23 | — | 22.23 |
| LABORER: COMMON OR GENERAL | 17.87 | — | 17.87 |
| IRONWORKER, REINFORCING | 24.74 | 14.82 | 39.56 |
| CEMENT MASON/CONCRETE FINISHER | 13.52 | 2.80 | 16.32 |
| CARPENTER | 18.00 | — | 18.00 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | 8.86 | — | 8.86 |
| SHEET METAL WORKER | 10.47 | 1.79 | 12.26 |
| ROOFER | 9.40 | 1.00 | 10.40 |
| PLUMBER | 9.86 | — | 9.86 |
| PAINTER | 8.81 | — | 8.81 |
| LABORER | 7.25 | — | 7.25 |
| ELECTRICIAN | 9.65 | — | 9.65 |
| CEMENT MASON/CONCRETE FINISHER | 9.53 | — | 9.53 |
| CARPENTER | 7.25 | — | 7.25 |
| BRICKLAYER | 10.25 | 1.00 | 11.25 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | 36.98 | 16.10 | 53.08 |
| POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | 37.58 | 16.10 | 53.68 |
| APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | 37.35 | 16.10 | 53.45 |
| 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | 36.81 | 16.10 | 52.91 |
| LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | 36.64 | 16.10 | 52.74 |
| LABORER: PIPELAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: PASCO ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | 28.48 | 13.00 | 41.48 |
| TRUCK DRIVER: WATER TRUCK | 21.54 | 12.19 | 33.73 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | 23.93 | 11.27 | 35.20 |
| TRUCK DRIVER: LOWBOY TRUCK | 26.61 | 13.21 | 39.82 |
| TRUCK DRIVER: DUMP TRUCK | 21.50 | 10.91 | 32.41 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 17.69 | 4.66 | 22.35 |
| OPERATOR: SCREED | 22.30 | 7.22 | 29.52 |
| OPERATOR: ROLLER (SUBGRADE) | 19.99 | 7.99 | 27.98 |
| OPERATOR: ROLLER | 24.26 | 8.14 | 32.40 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 24.24 | 7.12 | 31.36 |
| OPERATOR: OILER | 22.25 | 6.52 | 28.77 |
| OPERATOR: FORKLIFT | 23.13 | 9.17 | 32.30 |
| OPERATOR: CRANE | 23.34 | 9.45 | 32.79 |
| OPERATOR: BROOM/SWEEPER | 22.80 | 7.47 | 30.27 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 21.15 | 8.20 | 29.35 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 22.34 | 10.90 | 33.24 |
| LABORER: GRADE CHECKER | 20.64 | 7.37 | 28.01 |
| LABORER: COMMON OR GENERAL | 19.18 | 7.65 | 26.83 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 19.38 | 7.65 | 27.03 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | 25.47 | 9.52 | 34.99 |
| ELECTRICIAN | 26.33 | 11.45 | 37.78 |
| CEMENT MASON/CONCRETE FINISHER | 22.90 | 11.99 | 34.89 |
| CARPENTER, EXCLUDES FORM WORK | 23.92 | 9.84 | 33.76 |
| CARPENTER (FORM WORK ONLY) | 26.24 | 9.48 | 35.72 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | 40.00 | 18.74 | 58.74 |
| POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES $30.00/PER DAY ZONE 3 MORE THAN 60 MILES $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | 37.58 | 16.10 | 53.68 |
| POWER EQUIPMENT OPERATOR: GROUP 7 GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) ZONE PAY ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES $30.00/PER DAY ZONE 3 MORE THAN 60 MILES $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | 37.35 | 16.10 | 53.45 |
| POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR, BACKHOE (UNDER 3/4 YD) ZONE PAY ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES $30.00/PER DAY ZONE 3 MORE THAN 60 MILES $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | 36.81 | 16.10 | 52.91 |
| LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | 36.64 | 16.10 | 52.74 |
| 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | 38.06 | 16.10 | 54.16 |
| LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | 36.98 | 16.10 | 53.08 |
| AND OVER FROM THE MAIN POST OFFICE | 32.15 | 16.30 | 48.45 |
| TRUCK DRIVER: WATER TRUCK | 21.00 | 13.42 | 34.42 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 22.15 | 10.15 | 32.30 |
| LABORER: GRADE CHECKER | 22.68 | 10.90 | 33.58 |
| CEMENT MASON/CONCRETE FINISHER | 22.43 | 15.06 | 37.49 |
| CARPENTER, EXCLUDES FORM WORK | 26.06 | 11.26 | 37.32 |
| CARPENTER (FORM WORK ONLY) | 23.92 | 9.03 | 32.95 |
| TRUCK DRIVER, GROUP 5F DUMP (OVER 100 YDS) | 37.19 | 17.00 | 54.19 |
| TRUCK DRIVER, GROUP 5E DUMP (75-100 YDS) | 36.75 | 17.00 | 53.75 |
| TRUCK DRIVER, GROUP 5D DUMP (50-75 YDS) | 36.12 | 17.00 | 53.12 |
| TRUCK DRIVER, GROUP 5C DUMP (30-50 YDS) | 36.01 | 17.00 | 53.01 |
| TRUCK DRIVER, GROUP 5B DUMP (16-30 YDS) | 35.78 | 17.00 | 52.78 |
| TRUCK DRIVER, GROUP 5A DUMP (0-16 YDS) | 35.60 | 17.00 | 52.60 |