Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

Davis-Bacon rates — Camas County, Idaho

Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.

Pick the construction type that matches your contract, not the highest rate. Building, Residential, Highway and Heavy are separate determinations with different rates, and using the wrong one is a common reason a certified payroll comes back rejected. Where your trade appears under several classifications the choice between them is a judgement call — the plainest match is usually right, and the contracting officer can confirm it.
Building
ID20260022 rev 2 · 05/18/2026 · 18 classifications
ClassificationBase rateFringeTotal
BRICKLAYER30.0017.7847.78
ELECTRICIAN40.0018.7458.74
IRONWORKER, STRUCTURAL33.3722.9856.35
LABORER:MASON TENDER-CEMENT/CONCRETE33.9316.5050.43
PLUMBER39.9018.6758.57
ROOFER29.0219.9048.92
SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION)39.2023.5962.79
TRUCK DRIVER: DUMP TRUCK17.822.1820.00
PAINTER: BRUSH, ROLLER AND SPRAY16.12—16.12
OPERATOR: CRANE27.2910.5337.82
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE18.964.4223.38
LABORER: TAMPER (HAND HELD)15.005.0020.00
LABORER: PIPELAYER14.26—14.26
LABORER: COMMON OR GENERAL14.82—14.82
HVAC MECHANIC: DUCT INSTALLATION23.636.6330.26
CEMENT MASON/CONCRETE FINISHER14.762.8017.56
CARPENTER21.44—21.44
TRUCK DRIVER: GROUP 3 WATER TRUCK35.0017.0052.00
Residential
ID20260006 rev 1 · 05/18/2026 · 7 classifications
ClassificationBase rateFringeTotal
POWER EQUIPMENT OPERATORS: (BACKHOE)8.361.429.78
PLUMBER12.92—12.92
LABORER7.251.028.27
INSULATION MECHANIC9.99—9.99
ELECTRICIAN9.45—9.45
CEMENT MASON/CONCRETE FINISHER7.251.208.45
CARPENTER9.09—9.09
Highway
ID20260089 rev 2 · 05/18/2026 · 32 classifications
ClassificationBase rateFringeTotal
ELECTRICIAN40.0018.7458.74
POWER EQUIPMENT OPERATOR: GROUP 7 MECHANIC ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE37.3516.1053.45
CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE40.8918.6459.53
TRUCK DRIVER: WATER TRUCK21.6113.0534.66
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK22.5412.3534.89
TRUCK DRIVER: LOWBOY TRUCK21.5312.9834.51
TRUCK DRIVER: DUMP TRUCK21.1913.3034.49
TRUCK DRIVER: DISTRIBUTOR TRUCK21.3513.0534.40
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER22.6610.9033.56
TRAFFIC CONTROL: FLAGGER22.6810.9033.58
OPERATOR: SCREED25.6310.3435.97
OPERATOR: ROTOMILL26.5410.0036.54
OPERATOR: ROLLER (SUBGRADE)22.248.5730.81
OPERATOR: ROLLER25.4710.3235.79
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)25.6710.5636.23
OPERATOR: OILER25.669.2334.89
OPERATOR: LOADER25.7810.1735.95
OPERATOR: HYDROSEEDER24.7611.5136.27
OPERATOR: GRADER/BLADE26.1410.6936.83
OPERATOR: CRUSHER25.069.2334.29
OPERATOR: CRANE26.0410.0036.04
OPERATOR: BULLDOZER26.199.6035.79
OPERATOR: BROOM/SWEEPER25.0110.1635.17
OPERATOR: BOBCAT/SKID STEER/SKID LOADER25.3511.5536.90
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE25.8010.0035.80
LABORER: MASON TENDER - CEMENT/CONCRETE23.6910.9734.66
LABORER: GRADE CHECKER23.4510.9734.42
LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND)23.9811.0535.03
LABORER: COMMON OR GENERAL23.3510.9134.26
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR23.1311.0134.14
HIGHWAY/PARKING LOT STRIPING: PAINTER26.387.8934.27
CARPENTER (FORM WORK ONLY)26.578.1034.67
Heavy
ID20260043 rev 2 · 05/18/2026 · 27 classifications
ClassificationBase rateFringeTotal
ELECTRICIAN40.0018.7458.74
POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) ZONE PAY ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES $30.00/PER DAY ZONE 3 MORE THAN 60 MILES $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE37.5816.1053.68
N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE37.3516.1053.45
apply ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE BOOM PAY: All Cranes and Concrete Pump Boom Trucks 100 ft to 150 ft $.15 over scale 150 ft to 200 ft $.30 over scale Over 200 ft $.45 over scale36.9816.1053.08
POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE36.3316.1052.43
8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE38.0616.1054.16
IRONWORKER, STRUCTURAL33.3722.9856.35
LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR33.8316.5050.33
LABORER: GROUP 1 FLAGGER33.6316.5050.13
TRUCK DRIVER: WATER TRUCK23.899.5233.41
TRUCK DRIVER: LOWBOY TRUCK21.0012.1033.10
TRUCK DRIVER: DUMP TRUCK17.11—17.11
TREATMENT PLANTS: OPERATOR: EXCAVATOR20.24—20.24
PAINTER: ROLLER AND SPRAY17.90—17.90
OPERATOR: CONCRETE BATCH PLANT24.9411.9636.90
OPERATOR: LOADER (FRONT END)18.91—18.91
OPERATOR: GRADER/BLADE25.179.4434.61
OPERATOR: FORKLIFT21.98—21.98
OPERATOR: CRANE27.599.6037.19
OPERATOR: BOBCAT/SKID STEER/SKID LOADER17.00—17.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE21.06—21.06
LABORER: PIPELAYER16.39—16.39
LABORER: COMMON OR GENERAL21.089.9431.02
IRONWORKER, REINFORCING27.2216.7043.92
CEMENT MASON/CONCRETE FINISHER17.165.6722.83
CARPENTER, EXCLUDES FORM WORK28.00—28.00
CARPENTER (FORM WORK ONLY)28.00—28.00
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.