| BOILERMAKER | 48.48 | 33.91 | 82.39 |
| CARPENTER (FORM WORK ONLY) | 34.25 | 29.53 | 63.78 |
| ELEVATOR MECHANIC FOOTNOTES: A. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR EMPLOYEES WITH LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY | 56.30 | 38.44 | 94.74 |
| POWER EQUIPMENT OPERATOR: CRANE | 36.93 | 21.94 | 58.87 |
| POWER EQUIPMENT OPERATOR: (CLASS 2)- FORKLIFT (OTHER THAN THE ABOVE) | 34.70 | 21.94 | 56.64 |
| POWER EQUIPMENT OPERATOR: (CLASS 1)- FORKLIFT (ON STEEL ERECTION AND MACHINERY MOVING OR HOISTING ABOVE ONE COMPLETE STORY) | 35.02 | 21.94 | 56.96 |
| IRONWORKER: REINFORCING | 37.50 | 30.99 | 68.49 |
| IRONWORKER: ORNAMENTAL | 36.30 | 25.80 | 62.10 |
| LABORER: MASON TENDER - BRICK | 28.57 | 17.53 | 46.10 |
| PAINTER: BRUSH AND ROLLER | 32.41 | 16.30 | 48.71 |
| DRYWALL FINISHER/TAPER | 31.82 | 19.05 | 50.87 |
| PIPEFITTER (INCLUDES HVAC PIPE AND UNIT INSTALLATION) | 46.10 | 27.05 | 73.15 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 45.99 | 26.42 | 72.41 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | 37.12 | 22.22 | 59.34 |
| ROOFER | 14.00 | 3.91 | 17.91 |
| PLUMBER | 31.85 | 15.12 | 46.97 |
| OPERATOR: LOADER | 25.80 | 17.19 | 42.99 |
| OPERATOR: BULLDOZER | 22.31 | 8.36 | 30.67 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 27.55 | 22.85 | 50.40 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 27.31 | 15.35 | 42.66 |
| LABORER: PIPELAYER | 18.00 | 2.70 | 20.70 |
| LABORER: LANDSCAPE | 14.81 | — | 14.81 |
| LABORER: COMMON OR GENERAL | 17.25 | 6.93 | 24.18 |
| IRONWORKER, STRUCTURAL | 25.29 | 15.89 | 41.18 |
| INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | 19.04 | 7.32 | 26.36 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF HVAC/TEMPERATURE CONTROLS | 23.58 | 9.15 | 32.73 |
| CEMENT MASON/CONCRETE FINISHER | 21.12 | 11.07 | 32.19 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND DRYWALL HANGING (EXCLUDES FORM WORK) | 23.30 | 12.28 | 35.58 |
| BRICKLAYER | 25.93 | 9.70 | 35.63 |
| MILLWRIGHT | 35.93 | 28.05 | 63.98 |