Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 34.21 | 23.92 | 58.13 |
| ELEVATOR MECHANIC (FRANKLIN, UNION, & WHITE COUNTIES) PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | 52.08 | 38.44 | 90.52 |
| ELEVATOR MECHANIC (FANNIN & GILMER COUNTIES) PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | 52.81 | 38.44 | 91.25 |
| OPERATOR: CRANE | 38.53 | 16.08 | 54.61 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 15.77 0.00 SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 24.89 | 9.09 | 33.98 |
| ROOFER | 13.62 | — | 13.62 |
| PLUMBER, EXCLUDES INSTALLATION OF HVAC PIPE, HVAC UNIT, AND HVAC ELECTRICAL/TEMPERATURE CONTROLS | 17.54 | 1.27 | 18.81 |
| PAINTER: BRUSH, ROLLER AND SPRAY | 14.77 | 0.27 | 15.04 |
| OPERATOR: OILER | 12.00 | — | 12.00 |
| OPERATOR: BACKHOE/EXCAVATOR | 14.00 | — | 14.00 |
| LABORER: PIPELAYER | 15.50 | — | 15.50 |
| LABORER: COMMON OR GENERAL | 11.46 | — | 11.46 |
| IRONWORKER, STRUCTURAL | 16.75 | — | 16.75 |
| IRONWORKER, REINFORCING | 17.72 | — | 17.72 |
| ELECTRICIAN | 23.34 | 3.70 | 27.04 |
| CEMENT MASON/CONCRETE FINISHER | 12.89 | — | 12.89 |
| CARPENTER | 18.91 | 3.37 | 22.28 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 9.73 0.00 PLUMBER | 14.40 | — | 14.40 |
| PAINTER: BRUSH ONLY | 10.45 | — | 10.45 |
| OPERATOR: BACKHOE/EXCAVATOR | 11.89 | — | 11.89 |
| LABORER: COMMON OR GENERAL | 7.25 | — | 7.25 |
| HVAC MECHANIC (INSTALLATION OF HVAC DUCT) | 10.51 | — | 10.51 |
| ELECTRICIAN | 11.42 | — | 11.42 |
| CEMENT MASON/CONCRETE FINISHER | 8.00 | — | 8.00 |
| CARPENTER | 10.66 | — | 10.66 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: SEMI/TRAILER TRUCK | 16.99 | — | 16.99 |
| TRUCK DRIVER: WATER TRUCK | 12.82 | — | 12.82 |
| TRUCK DRIVER: LOWBOY TRUCK | 17.42 | — | 17.42 |
| TRUCK DRIVER: HYDROSEEDER TRUCK | 11.23 | — | 11.23 |
| TRUCK DRIVER: FLATBED TRUCK | 15.42 | 2.02 | 17.44 |
| TRUCK DRIVER: DUMP TRUCK | 14.83 | — | 14.83 |
| TRAFFIC SIGNALIZATION: LABORER | 13.38 | 0.83 | 14.21 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 13.21 | — | 13.21 |
| TRAFFIC CONTROL: FLAGGER | 12.30 | — | 12.30 |
| OPERATOR: SHUTTLE BUGGY | 13.61 | — | 13.61 |
| OPERATOR: SCREED | 15.23 | 1.70 | 16.93 |
| OPERATOR: SCRAPER | 13.16 | — | 13.16 |
| OPERATOR: ROLLER | 14.01 | 2.71 | 16.72 |
| OPERATOR: PILEDRIVER | 20.34 | 2.86 | 23.20 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 16.54 | 3.26 | 19.80 |
| OPERATOR: MILLING MACHINE GROUNDSMAN | 14.50 | 2.18 | 16.68 |
| OPERATOR: MILLING MACHINE | 15.95 | — | 15.95 |
| OPERATOR: MECHANIC | 16.88 | — | 16.88 |
| OPERATOR: LOADER | 14.16 | — | 14.16 |
| OPERATOR: HYDROSEEDER | 15.82 | — | 15.82 |
| OPERATOR: GRADER/BLADE | 19.05 | — | 19.05 |
| OPERATOR: DISTRIBUTOR | 17.24 | 3.99 | 21.23 |
| OPERATOR: CRANE | 21.35 | 4.08 | 25.43 |
| OPERATOR: CONCRETE SAW | 18.10 | 1.95 | 20.05 |
| OPERATOR: COMPACTOR | 13.31 | 2.19 | 15.50 |
| OPERATOR: BULLDOZER | 14.96 | 1.85 | 16.81 |
| OPERATOR: BROOM/SWEEPER | 13.71 | — | 13.71 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 17.81 | — | 17.81 |
| LABORER: COMMON OR GENERAL, INCLUDES EROSION CONTROL | 11.10 | — | 11.10 |
| LABORER: ASPHALT (INCLUDES DISTRIBUTOR, RAKER, SCREED, SHOVELER, AND SPREADER) | 13.34 | — | 13.34 |
| LABORER: PIPELAYER | 14.50 | — | 14.50 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 10.45 | — | 10.45 |
| LABORER: GRADE CHECKER | 12.49 | — | 12.49 |
| IRONWORKER, STRUCTURAL | 15.53 | — | 15.53 |
| IRONWORKER, REINFORCING | 14.63 | — | 14.63 |
| INSTALLER - GUARDRAIL | 14.27 | — | 14.27 |
| HIGHWAY/PARKING LOT STRIPING: OPERATOR (STRIPING MACHINE) | 12.17 | 1.82 | 13.99 |
| FORM WORKER | 14.18 | 1.82 | 16.00 |
| CEMENT MASON/CONCRETE FINISHER | 14.49 | — | 14.49 |
| CARPENTER, EXCLUDES FORM WORK | 14.64 | 1.98 | 16.62 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | 16.41 | 2.93 | 19.34 |
| OPERATOR: LOADER | 21.77 | — | 21.77 |
| OPERATOR: GRADER/BLADE | 25.82 | 1.81 | 27.63 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 24.89 | — | 24.89 |
| LABORER: PIPELAYER | 16.08 | — | 16.08 |
| LABORER: COMMON OR GENERAL | 15.19 | — | 15.19 |
| ELECTRICIAN | 28.40 | 0.52 | 28.92 |
| CEMENT MASON/CONCRETE FINISHER | 19.30 | 2.43 | 21.73 |
| CARPENTER (FORM WORK ONLY) | 20.51 | 0.01 | 20.52 |