Pick the construction type that matches your contract, not the highest rate. Building, Residential, Highway and Heavy are separate determinations with different rates, and using the wrong one is a common reason a certified payroll comes back rejected. Where your trade appears under several classifications the choice between them is a judgement call — the plainest match is usually right, and the contracting officer can confirm it.
Building
DC20260002 rev 3 · 05/18/2026 · 32 classifications
ClassificationBase rateFringeTotal
PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) A. PAID HOLIDAYS NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY40.7720.1760.94
ASBESTOS WORKER: HAZARDOUS MATERIAL HANDLER INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS A. PAID HOLIDAYS NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY24.4610.1934.65
OTHER GASES. THE APPLICATION INCLUDES ALL COMPONENTS INVOLVED IN CREATING THE RATED BARRIER AT PERIMETER SLAB EDGES AND EXTERIOR CAVITIES, THE HEAD OF GYPSUM BOARD OR CONCRETE WALLS, JOINTS BETWEEN RATED WALL OR FLOOR COMPONENTS, SEALING OF PENETRATING ITEMS AND BLANK OPENINGS. A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY30.2110.4340.64
BRICKLAYER38.8015.1753.97
CARPENTER: INCLUDES DRYWALL HANGING, FORM WORK, AND SOFT FLOOR LAYING-CARPET34.4114.3348.74
MILLWRIGHT39.5017.3256.82
PILEDRIVERMAN36.6014.4751.07
ELECTRICIAN: INCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS59.5023.0682.56
ELECTRICAL INSTALLER (SOUND & COMMUNICATION SYSTEMS) SCOPE OF WORK: INCLUDES LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, VSAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK). WORK EXCLUDED: THE INSTALLATION OF COMPUTER SYSTEMS IN INDUSTRIAL APPLICATIONS SUCH AS ASSEMBLY LINES, ROBOTICS AND COMPUTER CONTROLLER MANUFACTURING SYSTEMS. THE INSTALLATION OF CONDUIT AND/OR RACEWAYS SHALL BE INSTALLED BY INSIDE WIREMEN. ON SITES WHERE THERE IS NO INSIDE WIREMAN EMPLOYED, THE TELEDATA TECHNICIAN MAY INSTALL RACEWAY OR CONDUIT NOT GREATER THAN 10 FEET. FIRE ALARM WORK IS EXCLUDED ON ALL NEW CONSTRUCTION SITES OR WHEREVER THE FIRE ALARM SYSTEM IS INSTALLED IN CONDUIT. ALL HVAC CONTROL WORK34.1613.5447.70
EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE; 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT57.1638.4495.60
IRONWORKER: STRUCTURAL AND ORNAMENTAL37.8625.8663.72
IRONWORKER, REINFORCING31.8823.7855.66
LABORER: SKILLED30.478.7039.17
MARBLE/STONE MASON INCLUDING POINTING, CAULKING AND CLEANING OF ALL TYPES OF MASONRY, BRICK, STONE AND CEMENT EXCEPT POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT (RESTORATION WORK)45.6521.2166.86
TERRAZZO WORKER/SETTER34.3414.2048.54
TERRAZZO FINISHER28.8512.5541.40
TILE SETTER34.3414.2048.54
TILE FINISHER28.8512.5541.40
GLAZIER: GLAZING CONTRACTS $2 MILLION AND UNDER32.4114.4646.87
GLAZIER (GLAZING CONTRACTS OVER $2 MILLION)36.6514.4651.11
PAINTER: BRUSH, ROLLER, SPRAY AND DRYWALL FINISHER29.1611.8641.02
PLASTERER (INCLUDING FIREPROOFING)32.8610.4643.32
CEMENT MASON/CONCRETE FINISHER30.5014.2344.73
PLUMBER A. PAID HOLIDAYS: LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING, CHRISTMAS DAY, NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY AND THE FOURTH OF JULY53.3023.7177.01
PIPEFITTER: INCLUDES HVAC PIPE INSTALLATION A PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY55.0024.4679.46
ROOFER36.2614.9151.17
SPRINKLER FITTER (FIRE SPRINKLERS)45.2227.6972.91
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY53.4223.2076.62
POINTER, CAULKER, CLEANER, INCLUDES POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES (RESTORATION WORK); EXCLUDES POINTING, CAULKING, CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE OR CEMENT18.88—18.88
LABORER: MASON TENDER FOR POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES (RESTORATION WORK); EXCLUDES POINTING, CAULKING AND CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE AND CEMENT11.67—11.67
LABORER: MASON TENDER - CEMENT/CONCRETE15.402.8518.25
LABORER: COMMON OR GENERAL13.042.8015.84
Residential
DC20260003 rev 1 · 05/18/2026 · 15 classifications
ClassificationBase rateFringeTotal
ASBESTOS WORKER: HAZARDOUS MATERIAL HANDLER INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS A. PAID HOLIDAYS NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY24.4610.1934.65
EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE; 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT57.1638.4495.60
PLUMBER A. PAID HOLIDAYS: LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING, CHRISTMAS DAY, NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY AND THE FOURTH OF JULY29.6014.7144.31
PIPEFITTER (HVAC PIPE INSTALLATION) A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY55.0024.4679.46
SHEET METAL WORKER18.33—18.33
ROOFER26.33—26.33
POINTER, CAULKER, CLEANER, INCLUDES POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES (RESTORATION WORK); EXCLUDES POINTING, CAULKING, CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE OR CEMENT18.33—18.33
PAINTER: BRUSH AND ROLLER15.325.1520.47
LABORER: MASON TENDER FOR POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES (RESTORATION WORK); EXCLUDES POINTING, CAULKING AND CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE AND CEMENT12.59—12.59
LABORER: COMMON OR GENERAL12.54—12.54
ELECTRICIAN19.933.1123.04
DRYWALL FINISHER/TAPER15.00—15.00
CEMENT MASON/CONCRETE FINISHER18.72—18.72
CARPENTER, INCLUDING DRYWALL HANGING17.432.3719.80
BRICKLAYER20.71—20.71
HeavyHighway
DC20260001 rev 6 · 08/27/2026 · 77 classifications
ClassificationBase rateFringeTotal
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS.) (A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY.)24.4610.1934.65
OTHER GASES. THE APPLICATION INCLUDES ALL COMPONENTS INVOLVED IN CREATING THE RATED BARRIER AT PERIMETER SLAB EDGES AND EXTERIOR CAVITIES, THE HEAD OF GYPSUM BOARD OR CONCRETE WALLS, JOINTS BETWEEN RATED WALL OR FLOOR COMPONENTS, SEALING OF PENETRATING ITEMS AND BLANK OPENINGS) (A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY.)30.2110.4340.64
BOILERMAKERS47.3725.6072.97
BRICKLAYER38.8015.1753.97
BRICKLAYER: REFRACTORY (FIREBRICK)43.9417.7461.68
CARPENTER/LATHER34.4114.3348.74
MILLWRIGHT39.5017.3256.82
PILEDRIVERMAN36.6014.4751.07
DIVER43.9214.4758.39
DIVER TENDER36.6014.4751.07
ELECTRICIANS59.5023.0682.56
LINE CONSTRUCTION: CABLE SPLICERS44.5617.5062.06
LINE CONSTRUCTION: EQUIPMENT OPERATORS44.5617.5062.06
LINE CONSTRUCTION: GROUNDMEN18.0011.6629.66
LINE CONSTRUCTION: LINEMEN44.5617.5062.06
LINE CONSTRUCTION: TRUCK DRIVER23.0012.7635.76
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 - TOWER CRANES AND CRANES 100 TON AND OVER. (PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.)45.7613.2759.03
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 - 35 TON CRANES & ABOVE, DERRICKS, CONCRETE BOOM PUMP, DRILL RIGS (+50,000 LBS TORQUE), MOLE, MECHANIC. (PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.)43.4413.2756.71
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 - CRANES, HOISTS, DRILL RIGS (UNDER 50,000 LBS TORQUE), TIE BACK MACHINES, PAVING MIXERS, TUNNEL SHOVELS, BATCH PLANTS, SHIELDS, TUNNEL MINING MACHINES, DRAGLINES, MUCKING MACHINES, GRADERS IN TUNNELS, PILE DRIVING ENGINES, WELDER, HORIZONTAL DIRECTIONAL DRILL OPERATOR, TUG BOATS. (PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.)40.7313.2754.00
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 4 - FRONT END LOADERS, BOOM TRUCKS, BACKHOES, EXCAVATORS, GRADALLS, POWER DRIVEN WHEEL SCOOPS & SCRAPERS, BLADE GRADERS, MOTOR GRADERS, BULLDOZERS, TRENCHING MACHINES, BALLAST REGULATOR,HOE RAM, LOCOMOTIVE (STANDARD, NARROW GAUGE, TUGGERS). (PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.)36.3113.2749.58
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 - BOILERS (SKELTON), ASPHALT SPREADERS, BULLFLOAT FINISHING MACHINES, CONCRETE FINISHING MACHINES, CONCRETE SPREADERS,CONCRETE MIXER, CONCRETE PUMP, WELL POINTS, HYDRAULIC PUMPS, ELEVATORS, FREEZE UNIITS, TUNNEL MOTORMAN OR DINKY OPERATOR, CONVEYORS, GROUT PUMP, FIREMAN, ULTRA HIGH PRESSURE WATER JET CUTTING TOOL SYSTEM OPERATOR/MECHANIC, HORIZONTAL DIRECTIONAL DRILL LOCATOR, SKID STEERS (FINE GRADING), HIGH LIFTS (LULL TYPE LIFTS). (PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.)31.0913.2744.36
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 6 - FORK LIFTS, DITCH WITCH, BOBCAT, SKID STEER, SPACE HEATERS, SWEEPERS, ASSISTANT ENGINEERS, OILERS, SERVICE UNIT EQUIPMENT, ROLLER. (PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.)28.3913.2741.66
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 7 - MASTER MECHANIC. (PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.)47.1813.2760.45
POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 1 - GRADALL OPERATOR, CRANE37.0711.1748.24
POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 2 - BOOM TRUCK, MILLING MACHINE, EXCAVATOR, RUBBER TIRE BACKHOE, ASPHALT PAVER, ASPHALT PLANT ENGINEER, MOTOR GRADER, TRACK LOADER, RUBBER TIRE LOADER, TRACK DOZER, CONCRETE PAVER32.8911.1744.06
POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 3 - BROOM TRUCK, ASPHALT ROLLER28.0911.1739.26
POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 4 - AIR COMPRESSOR, GRADE ROLLERS25.1411.1736.31
POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 5 - MECHANIC37.9310.9748.90
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 1 - CRANES 50 TON AND ABOVE. (PAID HOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY)41.4011.5552.95
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 2 - CRANES UNDER 50 TON CAPACITY, BOOM TRUCKS. (PAID HOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY)35.0011.5546.55
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 3 - GRADALL, LEAD MECHANIC. (PAID HOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY)33.8011.5545.35
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 4 - EXCAVATORS, BACKHOES, FRONT-END LOADERS, FORK LIFT/LULL, BULLDOZERS, MOTOR GRADERS, MECHANIC 1, HYDRAULIC TAMPER AND HOE PACK, PAVING MIXERS, PILE DRIVING ENGINES, BATCH PLANT, CONCRETE PUMPS, LOW-BOY DRIVER, LUBE TRUCK (PAID HOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY)33.2611.5544.81
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 5 - KNUCKLE BOOM, TRENCHING MACHINE, WELL DRILLING MACHINES, CONCRETE MIXERS, ASSISTANT MECHANIC, MINI EXCAVATOR UNDER 10,000 LBS. GROSS WEIGHT. (PAID HOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY)31.1611.5542.71
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 6 - OILER, DUMP TRUCK, SKID STEER/BOBCAT, ROLLERS. (PAID HOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY)25.8911.5537.44
IRONWORKER, STRUCTURAL AND ORNAMENTAL37.8625.8663.72
IRONWORKER, REINFORCING31.8823.7855.66
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 1 - CARLAODERS, CHOKER SETTER, CONCRETE CREWMAN, CRUSHED FEEDER, DEMOLITION LABORERS, INCLUDING SALVAGING ALL MATERIAL, LOADING, CLEANING UP, WRECKING, DUMPMENT, FLAGMENT, FENCE ERECTOR AND INSTALLER (OTHER THAN CHAIN LINK), INCLUDING INSTALLATION AND ERECTION OF FENCE, GUARD RAILS, MEDIAL RAILS, REFERENCE POSTS, GUIDE POSTS AND RIGHT-OF-WAY MARKERS, FORM STRIPPERS, GENERAL LABORERS, RAILROAD TRACK LABORERS, RIPRAP MAN, SCALE MAN, STAKE JUMPER, STRUCTURE MOVER, INCLUDES FOUNDATION, SEPARATION, PREPARATION, CRIBBING, SHORING, JACKING AND UNLOADING OF STRUCTURES, WATER NOZZLEMAN, TIMBER BUCKER AND FALLER, TRUCK LOADER, WATER BOYS, TOOL ROOM MEN33.258.7041.95
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 2 - COMBINED AIR AND WATER NOZZLEMAN, CEMENT HANDLER, DOPE POT FIREMAN (NONMECHANICAL), FORM CLEANING MACHINE, MECHANICAL RAILROAD EQUIPMENT (INCLUDES SPIKER, PULLER, TILE CLEANER, TAMPER, PIPE WRAPPER, POWER DRIVEN WHEELBARROWS, OPERATORS OF HAND DERRICKS, TOWMASTERS, SCOOTSCRETES, BUGGYMOBILES, AND SIMILAR EQUIPMENT), TAMPER OR RAMMER OPERATOR, TRESTLE SCAFFOLD BUILDERS OVER ONE TIER HIGH, POWER TOOL OPERATOR (GAS, ELECTRIC, OR PNEUMATIC), SANDBLAST OR GUNNITE TAILHOSE MAN, SCAFFOLD ERECTOR (STEEL OR WOOD), VIBRATOR OPERATOR (UP TO 4 FEET), ASPHALT CUTTER, MORTAR MEN, SHORER AND LAGGER, CREOSOTE MATERIAL HANDLER, CORROSIVE ENAMEL OR EQUAL, PAVER BREAKER AND JACKHAMMER OPERATORS34.278.7042.97
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 3 - MULTI-SECTION PIPE LAYER, NON-METALLIC CLAY AND CONCRETE PIPE LAYER (INCLUDING CAULKER, COLLARMAN, JOINTER, RIGGER AND JACKER, THERMAL WELDER AND CORRUGATED METAL CULVERT PIPE LAYER34.278.7042.97
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 4 - ASPHALT BLOCK PNEUMATIC CUTTER, ASPHALT ROLLER, WALKER, CHAINSAW OPERATOR WITH ATTACHMENT, CONCRETE SAW (WALKING), HIGH SCALERS, JACKHAMMER OPERATOR *USING OVER 6 FEET OF STEEL), VIBRATORY OPERATOR (4 FEET AND OVER), WELL POINT INSTALLER, AIR TRAC OPERATOR34.328.7043.02
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 5 - ASPHALT SCREEDER, BIG DRILLS, CUT OF THE HOLE DRILLS (1 1/2"" PISTON OR LARGER), DOWN THE HOLE DRILLS (3 1/2"" PISTON OR LARGER) GUNNITE OR SANDBLASTER NOZZLEMAN, ASPHALT RAKER, ASPHALT TAMPER, FORM SETTER, DEMOLITION TORCH OPERATOR, SHOTCRETE NOZZLEMEN AND POTMAN35.008.7043.70
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 6 - POWDERMAN, MASTER FORM SETTERS35.938.7044.63
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 7 - BRICK PAVER (ASPHALT BLOCK PAVER, ASPHALT BLOCK SAWMAN, ASPHALT BLOCK GRINDER, HASTINGS BLOCK OR SIMILAR TYPE)36.818.7045.51
LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 8 - LICENSED POWDERMEN37.958.7046.65
LABORERS:, SKILLED ASBESTOS ABATEMENT LABORERS (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS)32.258.7040.95
LABORERS:, SKILLED TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS)32.258.7040.95
LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP 1 - BRAKEMAN, BULL GANG, DUMPER, TRACKMEN, CONCRETE MAN34.418.7043.11
LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP 2 - CHUCK TENDER, POWDERMEN IN PRIME HOUSE, FORM SETTERS AND MOVERS, NIPPERS, CABLEMAN, HOUSEMAN, GROUTMAN, BELL OR SIGNALMAN, TOP OR BOTTOM VIBRATORY OPERATOR35.488.7044.18
OPERATOR, SHOT CRETE NOZZLEMAN AND POTMAN38.178.7046.87
LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP 4 - MUCKING MACHINE OPERATOR (AIR)39.298.7047.99
LABORERS: TUNNEL, RAISE AND SHAFT (COMPRESSED AIR) FOR HEAVY CONSTRUCTION ONLY, POUNDS (1-14) AND HOURS (7)44.048.7052.74
LABORERS: TUNNEL, RAISE AND SHAFT (COMPRESSED AIR) FOR HEAVY CONSTRUCTION ONLY, POUNDS (14-18) AND HOURS (6)51.828.7060.52
LABORERS: ASPHALT RAKER & CONCRETE SAW OPERATOR (PAVING AND INCIDENTAL GRADING)24.308.7433.04
LABORERS: ASPHALT TAMPER & CONCRETE SHOVELER (PAVING AND INCIDENTAL GRADING)23.868.7432.60
LABORERS: JACK HAMMER (PAVING AND INCIDENTAL GRADING)23.898.7432.63
LABORERS: LABORER (PAVING AND INCIDENTAL GRADING)23.068.7431.80
LABORERS: SAND SETTER & FORM SETTER (PAVING AND INCIDENTAL GRADING)25.108.7433.84
LABORERS: ASPHALT SHOVELER (PAVING AND INCIDENTAL GRADING)23.278.7432.01
LABORERS: BRICK MASONRY WORK (MASON TENDERS)24.318.7033.01
LABORERS: BRICK MASONRY WORK (SCAFFOLD BUILDERS, MORTARMEN)24.968.7033.66
MARBLE & STONE MASON (INCLUDES POINTING, CAULKING AND CLEANING OF ALL TYPES OF MASONRY, BRICK, STONE AND CEMENT STRUCTURES)45.6521.2166.86
MOSAIC & TERRAZZO WORKER, TILE LAYER34.3414.2048.54
MARBLE, TILE & TERRAZZO FINISHER28.8512.5541.40
PAINTERS: COMMERCIAL AND MOLD REMEDIATION, PAINTERS, WALLCOVERS AND DRYWALL FINISHERS29.1611.8641.02
PAINTERS: ALL INDUSTRIAL WORK34.3012.9847.28
PAINTERS: BRIDGES, HEAVY HIGHWAY, LEAD ABATEMENT AND FLAME/THERMAL SPRAY42.9313.7756.70
METAL POLISHING AND REFINISHING28.4611.5640.02
CEMENT MASONS: (HEAVY CONSTRUCTION ONLY)30.5014.2344.73
CEMENT MASONS: CEMENT MASONS (PAVING & INCIDENTAL GRADING)23.509.7533.25
CEMENT MASONS: CONCRETE SAW OPERATORS (PAVING & INCIDENTAL GRADING)23.509.7533.25
CEMENT MASONS: FORM SETTERS (PAVING & INCIDENTAL GRADING)23.509.7533.25
PLUMBERS (PAID HOLIDAYS: LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING, CHRISTMAS DAY, NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY AND THE FOURTH OF JULY.)53.3023.7177.01
STEAMFITTER, REFRIGERATION & AIR CONDITIONING MECHANIC (PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY)55.0024.4679.46
SHEET METAL WORKER (PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY)53.4223.2076.62
TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCTION - TRACTOR TRAILER, LOW BOY (VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE.)33.757.3041.05
TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCTION - TRUCK DRIVERS (VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE.)31.757.3039.05
ONE (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE31.757.3039.05
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.