Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

Davis-Bacon rates — Marin County, California

Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.

Pick the construction type that matches your contract, not the highest rate. Building, Residential, Highway and Heavy are separate determinations with different rates, and using the wrong one is a common reason a certified payroll comes back rejected. Where your trade appears under several classifications the choice between them is a judgement call — the plainest match is usually right, and the contracting officer can confirm it.
BuildingHeavyHighway
CA20260007 rev 4 · 05/18/2026 · 268 classifications
ClassificationBase rateFringeTotal
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (AREA 2)64.5625.0789.63
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (AREA 1)84.7625.07109.83
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 2)44.7312.7557.48
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 1)35.3112.7548.06
BOILERMAKER: (2) REMAINING COUNTIES45.6038.9984.59
BOILERMAKER: (1) MARIN & SOLANO COUNTIES49.6241.2790.89
MARBLE FINISHER42.0619.8061.86
BRICKLAYER (AREA 2)57.0228.5085.52
BRICKLAYER (AREA 1)52.7625.0177.77
TERRAZZO WORKER/SETTER60.5829.7990.37
TERRAZZO FINISHER44.9320.9865.91
TILE LAYER AREA 4: SONOMA56.7922.5479.33
TILE LAYER AREA 3: MARIN, NAPA, SOLANO, SISKIYOU59.9222.6282.54
TILE LAYER AREA 2: ALPINE, AMADOR55.1722.5277.69
TILE LAYER AREA 1: BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SUTTER, TEHEMA, YOLO, YUBA55.5521.0876.63
TILE FINISHER AREA 2: ALPINE, AMADOR34.7619.2253.98
TILE FINISHER AREA 4: SONOMA35.7819.2355.01
TILE FINISHER AREA 3: MARIN, NAPA, SOLANO, SISKIYOU37.7519.2857.03
TILE FINISHER AREA 1: BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SUTTER, TEHEMA, YOLO, YUBA35.0017.4452.44
MARBLE MASON61.7230.3192.03
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT59.5134.6994.20
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT64.5134.6999.20
HIGHEST RATE FOR THAT SHIFT103.6234.69138.31
HIGHEST RATE FOR THAT SHIFT59.5134.6994.20
HIGHEST RATE FOR THAT SHIFT60.5134.6995.20
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT54.1034.6988.79
PILEDRIVER54.1034.6988.79
DRYWALL STOCKER/SCRAPPER: (AREA 4)22.9718.2241.19
DRYWALL STOCKER/SCRAPPER: (AREA 3)23.6418.2241.86
DRYWALL STOCKER/SCRAPPER: (AREA 1)26.3318.2244.55
DRYWALL INSTALLERS/LATHERS:: (AREA 4)45.9231.2677.18
DRYWALL INSTALLERS/LATHERS:: (AREA 3)47.2731.2678.53
DRYWALL INSTALLERS/LATHERS:: (AREA 1)52.6531.2683.91
CARPENTER: MILLWRIGHT MARIN COUNTY52.7532.4185.16
CARPENTER: JOURNEYMAN CARPENTER MARIN COUNTY52.6530.8283.47
CARPENTER: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER MARIN COUNTY52.8030.8283.62
CARPENTER: BRIDGE BUILDER/HIGHWAY CARPENTER MARIN COUNTY52.6530.8283.47
MASTER INSTALLER (MODULAR FURNITURE INSTALLER) AREA 331.3823.0354.41
MASTER INSTALLER (MODULAR FURNITURE INSTALLER) AREA 232.7123.0355.74
MASTER INSTALLER (MODULAR FURNITURE INSTALLER) AREA 136.4323.0359.46
LEAD INSTALLER (MODULAR FURNITURE INSTALLER) AREA 3.$ 27.96 23.03 LEAD INSTALLER (MODULAR FURNITURE INSTALLER) AREA 2.$ 29.08 23.03 LEAD INSTALLER (MODULAR FURNITURE INSTALLER) AREA 1.$ 32.21 23.03 INSTALLER (MODULAR FURNITURE INSTALLER) AREA 325.1622.5347.69
INSTALLER (MODULAR FURNITURE INSTALLER) AREA 226.1122.5348.64
INSTALLER (MODULAR FURNITURE INSTALLER) AREA 128.7622.5351.29
CARPENTERS: MILLWRIGHT EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES FOOTNOTE PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY LIMITS OF PLACERVILLE57.0135.1192.12
CARPENTERS: JOURNEYMAN CARPENTER EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES FOOTNOTE: PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY LIMITS OF PLACERVILLE54.5133.5288.03
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES FOOTNOTE PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY LIMITS OF PLACERVILLE54.6633.5288.18
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES FOOTNOTE: PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY LIMITS OF PLACERVILLE60.3933.5293.91
CARPENTERS: MILLWRIGHT ALPINE, COLUSA, EL DORADO (EAST), NEVADA, PLACER (EAST), SIERRA, SUTTER AND YUBA COUNTIES55.6635.1190.77
CARPENTERS: JOURNEYMAN CARPENTER ALPINE, COLUSA, EL DORADO (EAST), NEVADA, PLACER (EAST), SIERRA, SUTTER AND YUBA COUNTIES53.1633.5286.68
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER ALPINE, COLUSA, EL DORADO (EAST), NEVADA, PLACER (EAST), SIERRA, SUTTER AND YUBA COUNTIES53.3133.5286.83
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER ALPINE, COLUSA, EL DORADO (EAST), NEVADA, PLACER (EAST), SIERRA, SUTTER AND YUBA COUNTIES60.3933.5293.91
CARPENTERS: MILLWRIGHT AMADOR COUNTY47.9232.4180.33
CARPENTERS: JOURNEYMAN CARPENTER AMADOR COUNTY45.4230.8276.24
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER AMADOR COUNTY45.5730.8276.39
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER AMADOR COUNTY52.6530.8283.47
CARPENTERS: MILLWRIGHT SOLANO COUNTY54.9533.0888.03
CARPENTERS: JOURNEYMAN CARPENTER SOLANO COUNTY54.8531.4986.34
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER SOLANO COUNTY55.0031.4986.49
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER SOLANO COUNTY54.8531.4986.34
CARPENTERS: MILLWRIGHT NAPA AND SONOMA COUNTIES54.9533.0888.03
CARPENTERS: JOURNEYMAN CARPENTER NAPA AND SONOMA COUNTIES54.8531.4986.34
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER NAPA AND SONOMA COUNTIES55.0031.4986.49
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER NAPA AND SONOMA COUNTIES54.8531.4986.34
CARPENTERS: MILLWRIGHT BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SISKIYOU, TEHAMA AND TRINITY COUNTIES47.9232.4180.33
CARPENTERS: JOURNEYMAN CARPENTER BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SISKIYOU, TEHAMA AND TRINITY COUNTIES45.4230.8276.24
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SISKIYOU, TEHAMA AND TRINITY COUNTIES45.5730.8276.39
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SISKIYOU, TEHAMA AND TRINITY COUNTIES52.6530.8283.47
ELECTRICIAN NAPA AND SOLANO COUNTIES61.5631.1392.69
CABLE SPLICER NAPA AND SOLANO COUNTIES69.2631.36100.62
EXCLUDES ENERGY MANAGEMENT SYSTEMS61.0431.0892.12
EXCLUDES ENERGY MANAGEMENT SYSTEMS53.0830.8483.92
ALARM SYSTEMS WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) SHALL BE PERFORMED AT THE ELECTRICIAN WAGE RATE, WHEN EITHER OF THE FOLLOWING TWO (2) CONDITIONS APPLY: 1. THE PROJECT INVOLVES NEW OR MAJOR REMODEL BUILDING TRADES CONSTRUCTION. 2. THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT46.0025.6871.68
ALARM SYSTEMS WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) SHALL BE PERFORMED AT THE ELECTRICIAN WAGE RATE, WHEN EITHER OF THE FOLLOWING TWO (2) CONDITIONS APPLY: 1. THE PROJECT INVOLVES NEW OR MAJOR REMODEL BUILDING TRADES CONSTRUCTION. 2. THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT40.0025.5065.50
ELECTRICIAN (REMAINING AREA) ALPINE (WEST OF SIERRA MT. WATERSHED), AMADOR, BUTTE, COLUSA, EL DORADO (WEST OF SIERRA MT. WATERSHED), GLENN, LASSEN, NEVADA (WEST OF SIERRA MT. WATERSHED), PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA (WEST OF SIERRA MT. WATERSHED), SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES CABLE SPLICER: RECEIVES 110% OF THE ELECTRICIAN BASIC HOURLY RATE52.7038.6891.38
ELECTRICIAN MARIN AND SONOMA COUNTIES59.1732.0491.21
ELECTRICIAN MODOC AND SISKIYOU COUNTIES47.0421.8468.88
LINE CONSTRUCTION: (1) CABLE SPLICER DEL NORTE, MODOC & SISKIYOU COUNTIES67.8025.2093.00
LINE CONSTRUCTION: (2) LINEMAN, POLE SPRAYER, HEAVY LINE EQUIPMENT MAN DEL NORTE, MODOC & SISKIYOU COUNTIES60.5424.8785.41
LINE CONSTRUCTION: (3) GROUNDMAN ALL COUNTIES EXCEPT DEL NORTE, MODOC & SISKIYOU HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY40.7621.7662.52
LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE EQUIPMENT ALL COUNTIES EXCEPT DEL NORTE, MODOC & SISKIYOU HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY53.3022.2675.56
LINE CONSTRUCTION (1) LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY ALL COUNTIES EXCEPT DEL NORTE, MODOC & SISKIYOU70.1624.7194.87
ELEVATOR MECHANIC FOOTNOTE: A. PAID VACATION EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY84.0538.44122.49
EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2 EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2 REMAINDER PLACER COUNTY: AREA 1: AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1 WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2 EASTERN PART53.2339.5592.78
EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2 EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2 REMAINDER PLACER COUNTY: AREA 1: AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1 WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2 EASTERN PART56.5339.5596.08
MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2 SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1 AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2 REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2 REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2 REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART57.6539.5597.20
COUNTY: AREA 1: WESTERN PORTION AREA 2 REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2 REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2 REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART62.6139.55102.16
EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2 EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2 REMAINDER PLACER COUNTY: AREA 1: AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1 WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2 EASTERN PART51.2339.5590.78
EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2 EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2 REMAINDER PLACER COUNTY: AREA 1: AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1 WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2 EASTERN PART54.5339.5594.08
COUNTY: AREA 1: WESTERN PORTION AREA 2 REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2 REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2 REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART60.6139.55100.16
MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2 SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1 AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2 REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2 REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2 REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART55.6539.5595.20
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY GROUP 3 (AREA 2)49.6428.5678.20
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY GROUP 3 (AREA 1)47.6428.5676.20
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY GROUP 2 (AREA 2)54.2528.5682.81
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY GROUP 2 (AREA 1)52.2528.5680.81
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY GROUP 1 (AREA 2)57.8528.5686.41
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY GROUP 1 (AREA 1)55.8528.5684.41
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 GROUP 642.5031.1573.65
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 GROUP 544.7331.1575.88
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 GROUP 447.3731.1578.52
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 GROUP 3 (Truck Crane Oiler)45.1231.1576.27
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 GROUP 3 (Oiler)42.8931.1574.04
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 GROUP 3 (Lifting devices)49.1431.1580.29
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 GROUP 2 (Truck Crane Oiler)45.4131.1576.56
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 GROUP 2 (Oiler)43.1131.1574.26
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 GROUP 2 (Lifting devices)50.8231.1581.97
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 GROUP 1 (Truck Crane Oiler)45.6631.1576.81
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 GROUP 1 (Oiler)43.3831.1574.53
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 GROUP 1 (Lifting devices)52.6431.1583.79
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 5)58.0932.5390.62
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 4)59.2332.5391.76
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 3)60.3732.5392.90
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 2)61.7032.5394.23
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 1-A)65.4332.5397.96
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 1)62.9632.5395.49
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 5)58.1932.5390.72
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 4)59.3332.5391.86
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 3)60.4732.5393.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 2)61.8032.5394.33
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1-A).$ 65.53 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1)63.0632.5395.59
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 562.2432.5394.77
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 463.5432.5396.07
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 365.5632.5398.09
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 267.0432.5399.57
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 168.8132.53101.34
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 461.3032.5393.83
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 3 (Hydraulic)60.6132.5393.14
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 3 (Cranes)64.3432.5396.87
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 266.0832.5398.61
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 168.5932.53101.12
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8-A55.4932.5388.02
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 857.7032.5390.23
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 758.8432.5391.37
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 659.9832.5392.51
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 561.3032.5393.83
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 462.5732.5395.10
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 363.9532.5396.48
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 265.4332.5397.96
OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 166.9632.5399.49
IRONWORKER ALPINE, LASSEN, MODOC, SISKIYOU AND TRINITY COUNTIES43.7534.4578.20
IRONWORKER AMADOR, BUTTE, COLUSA,EL DORADO, GLENN,MARIN, NAPA, NEVADA, PLACER,PLUMAS, SACRAMENTO, SHASTA, SIERRA, SOLANO, SONOMA, SUTTER, TEHAMA, YOLO AND YUBA COUNTIES50.7035.1585.85
LABORER, ASBESTOS/MOLD/LEAD LABORER: REMAINING COUNTIES36.7529.6966.44
LABORER, ASBESTOS/MOLD/LEAD LABORER: MARIN AND NAPA COUNTIES37.7529.6967.44
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II (Area B)34.0627.3261.38
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II (Area A)35.0627.3262.38
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I (Area B)36.5627.3263.88
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I (Area A)37.5627.3264.88
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (Area B)36.2627.3263.58
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (Area A)37.2627.3264.58
LABORER: MASON TENDER-BRICK ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES36.2925.5561.84
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES46.4127.7274.13
TUNNEL AND SHAFT LABORERS: GROUP 5: GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES)44.4227.7272.14
TUNNEL AND SHAFT LABORERS: GROUP 4: VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD) (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES)44.9627.7272.68
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER - POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES)45.4127.7273.13
TUNNEL AND SHAFT LABORERS: GROUP 2: RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES)45.6627.7273.38
TUNNEL AND SHAFT LABORERS: GROUP 1: DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES)45.8927.7273.61
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES)- (2) Establishment Warranty Period28.9427.3056.24
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES)- (1) New Construction35.2527.3062.55
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW35.3527.3062.65
COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES35.5027.3062.80
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW35.2527.3062.55
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW35.3727.3062.67
LABORER, GUNITE - AREA B: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW35.9627.3063.26
COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES36.4627.3063.76
SACRAMENTO, SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES) FOOTNOTES LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed28.9427.3056.24
PLUMAS, SACRAMENTO, SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed35.2527.3062.55
SACRAMENTO, SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES) FOOTNOTES LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed35.3527.3062.65
AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) FOOTNOTES LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed36.0527.3063.35
SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. Sewer cleaners shall receive $4.00 per day above Group 1 wage rates ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed35.5527.3062.85
SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES) Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed35.7227.3063.02
WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW36.2027.3063.50
PLASTERER TENDER WORK ON A SWING STAGE SCAFFOLD $1.00 PER HOUR ADDITIONAL39.7728.5468.31
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. MARIN COUNTY35.0627.3062.36
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE MARIN COUNTY37.5627.3064.86
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (MARIN COUNTY)37.2627.3064.56
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST MARIN COUNTY46.4127.7274.13
TUNNEL AND SHAFT LABORERS: GROUP 5 GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (MARIN COUNTY)44.4227.7272.14
TUNNEL AND SHAFT LABORERS: GROUP 4 VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD) (MARIN COUNTY)44.9627.7272.68
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER - POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE (MARIN COUNTY)45.4127.7273.13
TUNNEL AND SHAFT LABORERS: GROUP 2 RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (MARIN COUNTY)45.6627.7273.38
TUNNEL AND SHAFT LABORERS: GROUP 1 DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN (MARIN COUNTY)45.8927.7273.61
LABORER: MASON TENDER-BRICK MARIN COUNTY37.5425.5563.09
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: (MARIN COUNTY)- (2) Establishment Warranty Period29.9427.3057.24
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: (MARIN COUNTY)- (1) New Construction36.2527.3063.55
LABORER, WRECKING - AREA A:: GROUP 1 (MARIN COUNTY).$ 36.50 27.30 LABORER, WRECKING - AREA A: GROUP 2 Semi-skilled wrecker (salvaging of other building materials) (MARIN COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW36.3527.3063.65
LABORER, GUNITE - AREA A:: GROUP 1 (MARIN COUNTY)37.4627.3064.76
LABORER, GUNITE - AREA A: GROUP 4 GUNITE LABORER (MARIN COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW36.2527.3063.55
LABORER, GUNITE - AREA A: GROUP 3 REBOUNDMAN (MARIN COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW36.3727.3063.67
LABORER, GUNITE - AREA A: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN (MARIN COUNTY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW36.9627.3064.26
LABORER, CONSTRUCTION CRAFT LABORERS - AREA A GROUP 1 (MARIN COUNTY)36.5027.3063.80
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED29.9427.3057.24
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.2527.3063.55
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.3527.3063.65
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED37.0527.3064.35
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.5527.3063.85
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.7227.3064.02
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED37.2027.3064.50
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. NAPA, SOLANO, AND SONOMA, COUNTIES.$ 34.06 27.30 LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE NAPA, SOLANO, AND SONOMA, COUNTIES36.5627.3063.86
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON NAPA, SOLANO, AND SONOMA, COUNTIES36.2627.3063.56
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST NAPA, SOLANO, AND SONOMA COUNTIES46.4127.7274.13
TUNNEL AND SHAFT LABORERS: GROUP 5 GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (NAPA, SOLANO, AND SONOMA COUNTIES)44.4227.7272.14
TUNNEL AND SHAFT LABORERS: GROUP 4 VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD) (NAPA, SOLANO, AND SONOMA COUNTIES)44.9627.7272.68
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER - POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE (NAPA, SOLANO, AND SONOMA COUNTIES)45.4127.7273.13
TUNNEL AND SHAFT LABORERS: GROUP 2 RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (NAPA, SOLANO, AND SONOMA COUNTIES)45.6627.7273.38
TUNNEL AND SHAFT LABORERS: GROUP 1 DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN (NAPA, SOLANO, AND SONOMA COUNTIES)45.8927.7273.61
LABORER: MASON TENDER-BRICK SOLANO AND SONOMA COUNTIES36.8426.2463.08
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: (NAPA, SOLANO, AND SONOMA COUNTIES)- (2) Establishment Warranty Period28.9427.3056.24
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: (NAPA, SOLANO, AND SONOMA COUNTIES)- (1) New Construction35.2527.3062.55
LABORER, WRECKING - AREA B:: GROUP 1 (NAPA, SOLANO, AND SONOMA COUNTIES)35.5027.3062.80
LABORER, WRECKING - AREA B: GROUP 2 Semi-skilled wrecker (salvaging of other building materials) NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTES LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW35.3527.3062.65
LABORER, GUNITE - AREA B:: GROUP 1 (NAPA, SOLANO, AND SONOMA COUNTIES)36.4627.3063.76
LABORER, GUNITE - AREA B: GROUP 4 GUNITE LABORER (NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTES LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW35.2527.3062.55
LABORER, GUNITE - AREA B: GROUP 3 REBOUNDMAN (NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTES LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW35.3727.3062.67
LABORER, GUNITE - AREA B: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN (NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW35.9627.3063.26
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED28.9427.3056.24
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED35.2527.3062.55
FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED35.3527.3062.65
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.0827.3063.38
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.0527.3063.35
$4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED35.5527.3062.85
WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER (NAPA, SOLANO, AND SONOMA COUNTIES) SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED35.7227.3063.02
RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED35.5027.3062.80
LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE APPLICABLE WAGE RATE. THIS SHALL NOT APPLY TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A BELOW SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.2027.3063.50
PAINTERS MARIN, NAPA, SOLANO & SONOMA COUNTIES PREMIUMS: EXOTIC MATERIALS - $1.25 ADDITIONAL PER HOUR. SPRAY WORK: - $0.50 ADDITIONAL PER HOUR INDUSTRIAL PAINTING - $0.25 ADDITIONAL PER HOUR [WORK ON INDUSTRIAL BUILDINGS USED FOR THE MANUFACTURE AND PROCESSING OF GOODS FOR SALE OR SERVICE; STEEL CONSTRUCTION (BRIDGES), STACKS, TOWERS, TANKS, AND SIMILAR STRUCTURES] HIGH WORK OVER 50 FEET - $2.00 PER HOUR ADDITIONAL 100 TO 180 FEET - $4.00 PER HOUR ADDITIONAL OVER 180 FEET - $6.00 PER HOUIR ADDITIONAL53.3828.0481.42
DRYWALL FINISHER/TAPER ALPINE, BUTTE, COLUSA, EL DORADO (WEST OF THE SIERRA NEVADA MOUNTAINS), GLENN, LASSEN (WEST OF HWY. 395, EXCLUDING HONEY LAKE); MARIN, MODOC, NAPA, NEVADA (WEST OF THE SIERRA NEVADA MOUNTAINS), PLACER (WEST OF THE SIERRA NEVADA MOUNTAINS), PLUMAS, SACRAMENTO, SHASTA, SIERRA (WEST OF THE SIERRA NEVADA MOUNTAINS), SISKIYOU, SOLANO, SONOMA, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES59.6331.2990.92
PAINTERS ALPINE, AMADOR, BUTTE, COLUSA. EL DORADO (WEST OF THE SIERRA NEVADA MOUNTAINS), GLENN, LASSEN (WEST OF HIGHWAY 395, EXCLUDING HONEY LAKE), MODOC, NEVADA (WEST OF THE SIERRA NEVADA MOUNTAINS), PLACER (WEST OF THE SIERRA NEVADA MOUNTAINS), PLUMAS, SACRAMENTO, SHASTA, SIERRA (WEST OF THE SIERRA NEVADA MOUNTAINS), SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES SPRAY/SANDBLAST: $0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR. HIGH TIME OVER 50 FT ABOVE GROUND OR WATER LEVEL $2.00 ADDITIONAL PER HOUR. 100 TO 180 FT ABOVE GROUND OR WATER LEVEL $4.00 ADDITIONAL PER HOUR. OVER 180 FT ABOVE GROUND OR WATER LEVEL $6.00 ADDITIONAL PER HOUR43.4522.8066.25
SOFT FLOOR LAYER MARIN, NAPA, SOLANO AND SONOMA COUNTIES59.0033.0392.03
GLAZIER MARIN , NAPA & SONOMA COUNTIES; SOLANO COUNTY (WEST OF A LINE DEFINED AS FOLLOWS: HWY. 80 CORRIDOR BEGINNING AT THE CITY OF FAIRFIELD, INCLUDING TRAVIS AIR FORCE BASE AND SUISUN CITY; GOING NORTH OF MANAKAS CORNER RD., CONTINUE NORTH ON SUISUN VALLEY RD. TO THE NAPA COUNTY LINE; HWY 80 CORRIDOR SOUTH ON GRIZZLY ISLAND RD. TO THE GRIZZLY ISLAND MANAGEMENT AREA)56.2234.0090.22
OF HIGHWAY 395, BEGINNING AT STACEY AND INCLUDING HONEY LAKE); NEVADA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); PLACER COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); AND SIERRA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS) PREMIUMS: SPECIAL COATINGS (BRUSH), AND SANDBLASTING = $0.50/HR SPECIAL COATINGS (SPRAY), AND STEEPLEJACK = $1.00/HR SPECIAL COATING SPRAY STEEL = $1.25/HR SWING STAGE = $2.00/HR *A SPECIAL COATING IS A COATING THAT REQUIRES THE MIXING OF 2 OR MORE PRODUCTS41.4316.1657.59
OF HIGHWAY 395, BEGINNING AT STACEY AND INCLUDING HONEY LAKE); NEVADA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); PLACER COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); AND SIERRA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS) PREMIUMS: SPECIAL COATINGS (BRUSH), AND SANDBLASTING = $0.50/HR SPECIAL COATINGS (SPRAY), AND STEEPLEJACK = $1.00/HR SPECIAL COATING SPRAY STEEL = $1.25/HR SWING STAGE = $2.00/HR *A SPECIAL COATING IS A COATING THAT REQUIRES THE MIXING OF 2 OR MORE PRODUCTS42.1916.1658.35
(EAST OF THE SIERRA NEVADA MOUNTAINS) PREMIUMS SPECIAL COATINGS (BRUSH), AND SANDBLASTING = $0.50/HR SPECIAL COATINGS (SPRAY), AND STEEPLEJACK = $1.00/HR SPECIAL COATING SPRAY STEEL = $1.25/HR SWING STAGE = $2.00/HR *A SPECIAL COATING IS A COATING THAT REQUIRES THE MIXING OF 2 OR MORE PRODUCTS39.4316.1655.59
SOFT FLOOR LAYER EL DORADO COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); LASSEN COUNTY (EAST OF HIGHWAY 395, BEGINNING AT STACEY AND INCLUDING HONEY LAKE); NEVADA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); PLACER COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS) AND SIERRA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS))34.2716.4750.74
DRYWALL: (2) STEEPLEJACK - TAPER, OVER 40 FT WITH OPEN SPACE BELOW EL DORADO COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); LASSEN COUNTY (EAST OF HIGHWAY 395, BEGINNING AT STACEY AND INCLUDING HONEY LAKE); NEVADA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); PLACER COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); AND SIERRA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS)44.2916.1260.41
DRYWALL: (1) TAPER (EL DORADO COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); LASSEN COUNTY (EAST OF HIGHWAY 395, BEGINNING AT STACEY AND INCLUDING HONEY LAKE); NEVADA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); PLACER COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); AND SIERRA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS)42.7916.1258.91
GLAZIER ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SOLANO (REMAINDER), SUTTER, TEHAMA, TRINITY, YOLO, YUBA43.2535.6278.87
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT SEALING35.1117.6252.73
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO PLASTIC; TAPE, TRAFFIC STRIPES AND MARKINGS40.8317.6258.45
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND INSTALLER34.7117.6252.33
SOFT FLOOR LAYER ALPINE; COLUSA; EL DORADO (WEST OF THE SIERRA NEVADA MOUNTAINS); GLENN; LASSEN (WEST OF HIGHWAY 395, BEGINNING AT STACEY AND INCLUDING HONEY LAKE); MODOC; NEVADA (WEST OF THE SIERRA NEVADA MOUNTAINS); PLACER (WEST OF THE SIERRA NEVADA MOUNTAINS); PLUMAS; SACRAMENTO; SHASTA; SIERRA (WEST OF THE SIERRA NEVADA MOUNTAINS); SISKIYOU; SUTTER; TEHAMA; TRINITY; YOLO AND YUBA COUNTIES48.5426.5975.13
PLASTERER AREA 355: NAPA & SONOMA COUNTIES32.7031.6864.38
PLASTERER AREA 355: MARIN36.7331.6868.41
PLASTERER AREA 295: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SOLANO, SUTTER, TEHEMA, TRINITY, YOLO & YUBA COUNTIES32.7031.6864.38
CEMENT MASON/CONCRETE FINISHER32.1523.2755.42
PLUMBER, PLUMBER, STEAMFITTER, REFRIGERATION FITTER (MARIN AND SONOMA COUNTIES)91.0049.40140.40
LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY FITTER MARIN & SONOMA COUNTIES77.3536.53113.88
PLUMBER BUTTE, COLUSA, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY & YUBA COUNTIES52.7541.3994.14
PLUMBER/PIPEFITTER: ALL OTHER WORK NAPA AND SOLANO COUNTIES FOOTNOTES: WHILE FITTING GALVANIZED MATERIAL: $.75 PER HOUR ADDITIONAL WORK FROM TRUSSES, TEMPORARY STAGING, UNGUARDED STRUCTURES 35' FROM THE GROUND OR WATER: $.75 PER HOUR ADDITIONAL. WORK FROM SWINGING SCAFFOLDS, BOATSWAINS CHAIRS OR SIMILAR DEVICES: $.75 PER HOUR ADDITIONAL71.6038.38109.98
PLUMBER/PIPEFITTER EL DORADO COUNTY (LAKE TAHOE AREA ONLY); NEVADA COUNTY (LAKE TAHOE AREA ONLY); AND PLACER COUNTY (LAKE TAHOE AREA ONLY)52.1418.7170.85
UNDERGROUND UTILITY WORKER: /LANDSCAPE FITTER ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NAPA, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SOLANO, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES36.0118.5054.51
PLUMBER AMADOR (SOUTH OF SAN JOAQUIN RIVER) AND ALPINE COUNTIES58.4538.7497.19
PLUMBER/PIPEFITTER: LIGHT COMMERCIAL WORK AMADOR (NORTH OF SAN JOAQUIN RIVER), EL DORADO (EXCLUDING LAKE TAHOE AREA), NEVADA (EXCLUDING LAKE TAHOE AREA); PLACER (EXCLUDING LAKE TAHOE AREA), SACRAMENTO AND YOLO COUNTIES55.5824.0279.60
PLUMBER/PIPEFITTER: JOURNEYMAN AMADOR (NORTH OF SAN JOAQUIN RIVER), EL DORADO (EXCLUDING LAKE TAHOE AREA), NEVADA (EXCLUDING LAKE TAHOE AREA); PLACER (EXCLUDING LAKE TAHOE AREA), SACRAMENTO AND YOLO COUNTIES67.3730.0097.37
ROOFER MARIN, NAPA, SOLANO AND SONOMA COUNTIES54.9423.3478.28
ROOFER ALPINE, BUTTE, COLUSA, EL DORADO, GLENN,LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES46.7321.3668.09
SPRINKLER FITTER (FIRE SPRINKLERS) MARIN, NAPA, SOLANO AND SONOMA COUNTIES81.5441.35122.89
SPRINKLER FITTER (ALPINE, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES)52.0629.8681.92
SHEET METAL WORKER: MECHANICAL CONTRACTS $200,000 OR LESS MARIN, NAPA, SOLANO SONOMA & TRINITY COUNTIES55.9245.29101.21
SHEET METAL WORKER: ALL OTHER WORK MARIN, NAPA, SOLANO SONOMA & TRINITY COUNTIES64.0646.83110.89
SHEET METAL WORKER AMADOR, COLUSA, EL DORADO, NEVADA, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES47.8541.9089.75
SHEET METAL WORKER ALPINE COUNTY43.5037.4280.92
SHEET METAL WORKER: METAL DECKING AND SIDING ONLY BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, YOLO AND YUBA COUNTIES44.4535.5580.00
SHEET METAL WORKER: METAL DECKING AND SIDING ONLY (MARIN, NAPA, SOLANO, SONOMA AND TRINITY COUNTIES)44.4535.5580.00
SHEET METAL WORKER: MECHANICAL JOBS OVER $200,000 BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SIERRA, SISKIYOU AND TEHAMA COUNTIES46.6040.2186.81
SHEET METAL WORKER: MECHANICAL JOBS $200,000 & UNDER BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SIERRA, SISKIYOU AND TEHAMA COUNTIES35.1635.8871.04
TRUCK DRIVERS: GROUP 5: DUMP TRUCKS, 65 YDS. AND OVER; HOLLAND HAULER; LOW BED HEAVY DUTY TRANSPORT OVER 7 AXLES FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED. TRUCK DRIVER CLASSIFICATIONS44.5634.2878.84
AND UNDER 65 YDS.; WATER PULLS - DW 10'S, 20'S, 21'S AND OTHER SIMILAR EQUIPMENT WHEN PULLING AQUA/PAK OR WATER TANK TRAILERS; HELICOPTER PILOTS (WHEN TRANSPORTING MEN AND MATERIALS); LOWBEDK HEAVY DUTY TRANSPORT UP TO INCLUDING 7 AXLES; DW10'S, 20'S, 21'S AND OTHER SIMILAR CAT TYPE, TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR GREASE TANK TRAILERS OR OTHER MISCELLANEOUS TRAILERS; VACUUM TRUCKS 7500 GALS AND OVER AND TRUCK REPAIRMAN FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED. TRUCK DRIVER CLASSIFICATIONS44.2134.2878.49
DRIVER CLASSIFICATIONS43.8634.2878.14
TRUCK DRIVERS: GROUP 2: DUMP TRUCKS, 6 YDS. AND UNDER 8 YDS.; TRANSIT MIXERS, THROUGH 10 YDS.; WATER TRUCKS, UNDER 7,000 GALS.; JETTING TRUCKS, UNDER 7,000 GALS.; SINGLE-UNIT FLAT RACK (3-AXLE UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; RUBBER-TIRED MUCK CAR (NOT SELF-LOADED); RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND ""A"" FRAME DRIVERS; COMBINATION WINCH TRUCK WITH HOIST; ROAD OIL TRUCK OR BOOTPERSON; BUGGYMOBILE; ROSS, HYSTER AND SIMILAR STRADDLE CARRIERS; SMALL RUBBER-TIRED TRACTOR FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED TRUCK DRIVER CLASSIFICATIONS43.5634.2877.84
DRIVER CLASSIFICATIONS43.2634.2877.54
Residential
CA20260019 rev 5 · 05/18/2026 · 335 classifications
ClassificationBase rateFringeTotal
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (AREA 2: EL DORADO, MONTEREY, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SOLANO, SONOMA, SUTTER, YOLO, & YUBA COUNTIES)64.5625.0789.63
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO & SANTA CLARA COUNTIES)84.7625.07109.83
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 1: EL DORADO, MONTEREY, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SOLANO, SANOMA, SUTTER, YOLO & YUBA COUNTIES)34.5611.4045.96
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 2 ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO & SANTA CLARA COUNTIES)36.539.2745.80
MARBLE FINISHER42.0619.8061.86
BRICKLAYER: (16) MONTEREY, SANTA CRUZ SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE. (B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE54.1827.8282.00
$1.25 PER HOUR IN ADDITION TO THE ABOVE. (B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE52.7625.0177.77
BRICKLAYER: ( 8) ALAMEDA, CONTRA COSTA, SAN BENITO, SANTA CLARA SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE (B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE56.9426.2883.22
RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE57.0228.5085.52
TERRAZZO WORKER FOOTNOTE: BASE MACHINE OPERATOR $1.00 PER HOUR ADDITIONAL60.5829.7990.37
TERRAZZO FINISHER FOOTNOTE: BASE MACHINE OPERATOR: $1.00 PER HOUR ADDITIONAL44.9320.9865.91
MARBLE MASON61.7230.3192.03
TILE LAYER (SONOMA)56.7922.5479.33
TILE LAYER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO, YUBA)55.5521.0876.63
TILE LAYER (ALAMEDA, CONTRA COSTA, MARIN, MONTERREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO)59.9222.6282.54
TILE FINISHER (SONOMA)35.7819.2355.01
TILE FINISHER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO, YUBA)35.0017.4452.44
TILE FINISHER (ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO)37.7519.2857.03
CARPENTERS: MILLWRIGHT (SAN FRANCISCO COUNTY)60.4935.1195.60
CARPENTERS: JOURNEYMAN CARPENTER (SAN FRANCISCO COUNTY)60.3933.5293.91
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN FRANCISCO COUNTY)60.5433.5294.06
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN FRANCISCO COUNTY)60.3933.5293.91
DRYWALL STOCKER/SCRAPPER: (AREA 4) AREA 4: El Dorado, Placer, Sacramento, Sutter, Yolo, & Yuba Counties24.0718.5842.65
DRYWALL STOCKER/SCRAPPER: (AREA 2) AREA 2 Monterey, San Benito & Santa Cruz Counties24.4918.5843.07
DRYWALL STOCKER/SCRAPPER: (AREA 1) AREA 1 Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano & Sonoma Counties27.4318.5846.01
DRYWALL INSTALLERS/LATHERS: (AREA 4) AREA 4: El Dorado, Placer, Sacramento, Sutter, Yolo, & YubaCounties48.1231.9380.05
DRYWALL INSTALLERS/LATHERS: (AREA 2) AREA 2 Monterey, San Benito & Santa Cruz Counties48.9731.9380.90
DRYWALL INSTALLERS/LATHERS: (AREA 1) AREA 1 Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano & Sonoma Counties54.8531.9386.78
CARPENTER: MILLWRIGHT MARIN COUNTY52.7532.4185.16
CARPENTER: JOURNEYMAN CARPENTER MARIN COUNTY52.6530.8283.47
CARPENTER: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER MARIN COUNTY52.8030.8283.62
CARPENTER: BRIDGE BUILDER/HIGHWAY CARPENTER MARIN COUNTY52.6530.8283.47
CARPENTERS: MILLWRIGHT EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES FOOTNOTE PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY LIMITS OF PLACERVILLE57.0135.1192.12
CARPENTERS: JOURNEYMAN CARPENTER EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES FOOTNOTE: PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY LIMITS OF PLACERVILLE54.5133.5288.03
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES FOOTNOTE PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY LIMITS OF PLACERVILLE54.6633.5288.18
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES FOOTNOTE: PLACER COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY LIMITS OF PLACERVILLE60.3933.5293.91
CARPENTERS: MILLWRIGHT (EL DORADO (EAST), PLACER (EAST), SUTTER AND YUBA COUNTIES)55.6635.1190.77
CARPENTERS: JOURNEYMAN CARPENTER (EL DORADO (EAST), PLACER (EAST), SUTTER AND YUBA COUNTIES)53.1633.5286.68
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER EL DORADO (EAST), PLACER (EAST), SUTTER AND YUBA COUNTIES53.3133.5286.83
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (EL DORADO (EAST), PLACER (EAST), SUTTER AND YUBA COUNTIES)60.3933.5293.91
CARPENTERS: MILLWRIGHT (CONTRA COSTA COUNTY)52.7532.4185.16
CARPENTERS: JOURNEYMAN CARPENTER (CONTRA COSTA COUNTY)52.6530.8283.47
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (CONTRA COSTA COUNTY)52.8030.8283.62
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (CONTRA COSTA COUNTY)52.6530.8283.47
CARPENTERS: MILLWRIGHT SOLANO COUNTY54.9533.0888.03
CARPENTERS: JOURNEYMAN CARPENTER SOLANO COUNTY54.8531.4986.34
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER SOLANO COUNTY55.0031.4986.49
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER SOLANO COUNTY54.8531.4986.34
CARPENTERS: MILLWRIGHT (SAN MATEO COUNTY)60.4935.1195.60
CARPENTERS: JOURNEYMAN CARPENTER (SAN MATEO COUNTY).$ 60.39 33.52 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN MATEO COUNTY)60.5433.5294.06
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN MATEO COUNTY)60.3933.5293.91
CARPENTERS: MILLWRIGHT (SANTA CLARA COUNTY)54.9533.0888.03
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CLARA COUNTY)54.8531.4986.34
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SANTA CLARA COUNTY)55.0031.4986.49
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA CLARA COUNTY)54.8531.4986.34
CARPENTERS: MILLWRIGHT (SAN BENITO COUNTY)51.4733.0884.55
CARPENTERS: JOURNEYMAN CARPENTER (SAN BENITO COUNTY)48.9731.4980.46
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN BENITO COUNTY)49.1231.4980.61
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN BENITO COUNTY)54.8531.4986.34
CARPENTERS: MILLWRIGHT (SANTA CRUZ COUNTY)51.4733.0884.55
CARPENTERS: JOURNEYMAN CARPENTER (SANTA CRUZ COUNTY)48.9731.4980.46
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SANTA CRUZ COUNTY)49.1231.4980.61
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA CRUZ COUNTY)54.8531.4986.34
CARPENTERS: MILLWRIGHT (MONTEREY COUNTY)51.4733.0884.55
CARPENTERS: JOURNEYMAN CARPENTER (MONTEREY COUNTY)48.9731.4980.46
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (MONTEREY COUNTY)49.1231.4980.61
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (MONTEREY COUNTY)54.8531.4986.34
CARPENTERS: MILLWRIGHT (ALAMEDA COUNTY)54.9533.0888.03
CARPENTERS: JOURNEYMAN CARPENTER (ALAMEDA COUNTY)54.8531.4986.34
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (ALAMEDA COUNTY)55.0031.4986.49
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (ALAMEDA COUNTY)54.8531.4986.34
CARPENTERS: MILLWRIGHT (NAPA AND SONOMA COUNTIES).$ 54.95 33.08 CARPENTERS: JOURNEYMAN CARPENTER (NAPA AND SONOMA COUNTIES)54.8531.4986.34
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (NAPA AND SONOMA COUNTIES)55.0031.4986.49
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (NAPA AND SONOMA COUNTIES)54.8531.4986.34
SOUND & COMMUNICATIONS: TECHNICIAN (SAN FRANCISCO COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS67.6531.7899.43
SOUND & COMMUNICATIONS: INSTALLER (SAN FRANCISCO COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS58.8331.5190.34
ELECTRICIAN (SAN FRANCISCO COUNTY) WORK ON RESIDENTIAL WOOD FRAME REMODEL AND REPAIR IN ALL WOOD-CONSTRUCTED BUILDINGS NOT TO EXCEED 24 LIVING UNITS; AND NEW WOOD FRAME SINGLE STRUCTURE 1 OR 2 FAMILY HOUSES, OR ON ALL WOOD- CONSTRUCTED BUILDINGS NOT TO EXCEED 20 LIVING UNITS UNDER 1 ROOF EXCLUDING PROJECTS OR TRACTS CONTAINING MORE THAN 2 HOUSES, OR MORE THAN 1 BUILDING55.5025.6481.14
ELECTRICIAN (NAPA & SOLANO COUNTIES)38.5021.1659.66
ELECTRICIAN: ZONE B: (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) ZONE B: ANY AREA OUTSIDE OF ZONE A77.4533.97111.42
ELECTRICIAN: ZONE A: (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) ZONE A: ALL OF SANTA CRUZ, MONTEREY, AND SAN BENITO COUNTIES WITHIN 25 AIR MILES OF HIGHWAY 1 AND DOLAN ROAD IN MOSS LANDING, AND AN AREA EXTENDING 5 MILES EAST AND WEST OF HIGHWAY 101 SOUTH TO THE SAN LUIS OBISPO COUNTY LINE70.4133.76104.17
SOUND & COMMUNICATIONS: TECHNICIAN (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) SCOPE OF WORK INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS55.1224.3079.42
SOUND & COMMUNICATIONS: INSTALLER (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) SCOPE OF WORK INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS47.9324.0972.02
ELECTRICIAN (CONTRA COSTA COUNTY)66.2635.84102.10
CABLE SPLICER (CONTRA COSTA COUNTY)74.5436.09110.63
SOUND & COMMUNICATIONS: TECHNICIAN (CONTRA COSTA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS61.0431.0892.12
SOUND & COMMUNICATIONS: INSTALLER (CONTRA COSTA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS53.0830.8483.92
ELECTRICIAN (SANTA CLARA COUNTY)47.3523.4970.84
SOUND & COMMUNICATIONS: TECHNICIAN (SANTA CLARA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS67.0831.2698.34
SOUND & COMMUNICATIONS: INSTALLER (SANTA CLARA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS58.3331.0089.33
ELECTRICIAN: WORK ON SINGLE FAMILY HOMES AND APARTMENTS UP TO AND INCLUDING 3 STORIES (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)23.1012.4835.58
ELECTRICIAN: FOUR STORIES (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)39.0624.5163.57
SOUND & COMMUNICATIONS: TECHNICIAN (COLUSA, PLACER, SUTTER, YOLO AND YUBA COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS46.0025.6871.68
SOUND & COMMUNICATIONS: INSTALLER (COLUSA, PLACER, SUTTER, YOLO AND YUBA COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS40.0025.5065.50
ELECTRICIAN (EL DORADO AND PLACER COUNTIES) ZONE PAY: ZONE 1 - 0 TO 70 MILES $0.00 PER HOUR ZONE 2 - 70 TO 90 MILES $5.00 PER HOUR ZONE 3 - 91 MILES AND OVER $7.00 PER HOUR31.888.4640.34
ELECTRICIAN (MARIN AND SONOMA COUNTIES)41.0024.2665.26
ELECTRICIAN (ALAMEDA COUNTY)76.0049.07125.07
CABLE SPLICER (ALAMEDA COUNTY)87.4049.41136.81
SOUND & COMMUNICATIONS, INSTALLER (ALAMEDA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS56.6828.3585.03
ELECTRICIAN (SAN MATEO COUNTY)86.0051.07137.07
ELEVATOR MECHANIC FOOTNOTE: A. PAID VACATION EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY84.0538.44122.49
by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2 SONOMA Area 1: All but the Northwestern Area 2: Reaminder63.0634.6997.75
$2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2 SONOMA Area 1: All but the Northwestern Area 2: Reaminder44.4431.1575.59
by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2 SONOMA Area 1: All but the Northwestern Area 2: Reaminder42.5531.1573.70
$2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2 SONOMA Area 1: All but the Northwestern Area 2: Reaminder44.8331.1575.98
cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1 ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2 SONOMA Area 1: All but the Northwestern Area 2: Reaminder64.7034.6999.39
cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1 ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2 SONOMA Area 1: All but the Northwestern Area 2: Reaminder42.8331.1573.98
suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2 SONOMA Area 1: All but the Northwestern Area 2: Reaminder45.0731.1576.22
by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2 SONOMA Area 1: All but the Northwestern Area 2: Reaminder66.3934.69101.08
by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2 SONOMA Area 1: All but the Northwestern Area 2: Reaminder43.7931.1574.94
cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1 ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2 SONOMA Area 1: All but the Northwestern Area 2: Reaminder46.0831.1577.23
cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1 ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2 SONOMA Area 1: All but the Northwestern Area 2: Reaminder54.6934.6989.38
cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1 ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2 SONOMA Area 1: All but the Northwestern Area 2: Reaminder56.7134.6991.40
cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1 ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2 SONOMA Area 1: All but the Northwestern Area 2: Reaminder57.7934.6992.48
by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2 SONOMA Area 1: All but the Northwestern Area 2: Reaminder58.8834.6993.57
cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1 ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2 SONOMA Area 1: All but the Northwestern Area 2: Reaminder60.1534.6994.84
suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2 SONOMA Area 1: All but the Northwestern Area 2: Reaminder61.3634.6996.05
by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2 SONOMA Area 1: All but the Northwestern Area 2: Reaminder62.6934.6997.38
$2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2 SONOMA Area 1: All but the Northwestern Area 2: Reaminder64.0934.6998.78
$2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2 SONOMA Area 1: All but the Northwestern Area 2: Reaminder65.5434.69100.23
AREA 2 NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder37.8628.0365.89
AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder37.5828.0365.61
AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder35.1128.0363.14
AREA 2 NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder37.2028.0365.23
AREA 2 NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder63.0634.6997.75
AREA 2 NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder37.8328.0365.86
AREA 2 NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder35.3428.0363.37
AREA 2 NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder64.7034.6999.39
AREA 2 NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder66.3934.69101.08
AREA 2 NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder35.5928.0363.62
AREA 2 NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder38.0528.0366.08
AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder54.6934.6989.38
AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder56.7134.6991.40
AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder57.7934.6992.48
AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder58.8834.6993.57
AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder60.1534.6994.84
AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder61.3634.6996.05
AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder62.6934.6997.38
AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder64.0934.6998.78
AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder65.5434.69100.23
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY GROUP 3 (AREA 2) THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder49.6428.5678.20
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY GROUP 3 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder47.6428.5676.20
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY GROUP 2 (AREA 2) THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder54.2528.5682.81
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY GROUP 2 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder52.2528.5680.81
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY GROUP 1 (AREA 2) THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder57.8528.5686.41
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY GROUP 1 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2 MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder55.8528.5684.41
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL (ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES) PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S Naval Air Facility - Sealey, Vandenberg $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock55.3335.1590.48
IRONWORKERS: FENCE ERECTOR (ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES) PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S Naval Air Facility - Sealey, Vandenberg $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock45.7826.5172.29
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL (SAN FRANCISCO CITY AND COUNTY) PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S Naval Air Facility - Sealey, Vandenberg $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock55.8335.1590.98
IRONWORKERS: FENCE ERECTOR (SAN FRANCISCO CITY AND COUNTY) PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S Naval Air Facility - Sealey, Vandenberg $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock45.7826.5172.29
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL (REMAINING COUNTIES) PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S Naval Air Facility - Sealey, Vandenberg $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock50.7035.1585.85
IRONWORKER: FENCE ERECTOR (REMAINING COUNTIES) PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S Naval Air Facility - Sealey, Vandenberg $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock45.7826.5172.29
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2 (AREA 2: EL DORADO, MONTEREY, PLACE, SACRAMENTO, SAN BENITO, SANTA CRUZ, SOLANO, SONOMA, SUTTER, YOLO, AND YUBA COUNTIES) SCOPE OF WORK: Covers site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations38.1530.0368.18
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1 (AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO,SANMATEO, SANTA CLARA) SCOPE OF WORK Covers site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations39.1530.0369.18
LANDSCAPE LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS : $0.25 PER HOUR ADDITIONAL28.9427.3056.24
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEW CONSTRUCTION (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL35.2527.3062.55
LABORERS:, WRECKING: GROUP 2 Semi-skilled wrecker (salvaging of other building materials) (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS $0.25 PER HOUR ADDITIONAL35.3527.3062.65
LABORERS:, WRECKING: GROUP 1 Skilled wrecker (removing and salvaging of sash, windows and materials) (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS): $0.25 PER HOUR ADDITIONAL35.5027.3062.80
LABORERS:, GUNITE: GROUP 4 GUNITE LABORER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS $0.25 PER HOUR ADDITIONAL35.2527.3062.55
LABORERS:, GUNITE: GROUP 3 REBOUNDMAN (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS : $0.25 PER HOUR ADDITIONAL35.3727.3062.67
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS : $0.25 PER HOUR ADDITIONAL35.9627.3063.26
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS : $0.25 PER HOUR ADDITIONAL36.4627.3063.76
UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION"". (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL28.9427.3056.24
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3 CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY) (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) $0.25 PER HOUR ADDITIONAL35.2527.3062.55
INCHES (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL35.3527.3062.65
SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL36.0527.3063.35
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL35.5527.3062.85
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL35.7227.3063.02
(including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL35.5027.3062.80
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST: ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) $0.25 PER HOUR ADDITIONAL36.2027.3063.50
LABORER: MASON TENDER-BRICK (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)36.2925.5561.84
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEW CONSTRUCTION (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS): $0.25 PER HOUR ADDITIONAL36.2527.3063.55
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL29.9427.3057.24
LABORERS:, WRECKING: GROUP 2 SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS) (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS ): $0.25 PER HOUR ADDITIONAL36.3527.3063.65
LABORERS:, WRECKING: GROUP 1 SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS ADN MATERIALS (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS $0.25 PER HOUR ADDITIONAL36.5027.3063.80
LABORERS:, GUNITE: GROUP 4 GUNITE LABORER (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL36.2527.3063.55
LABORERS:, GUNITE: GROUP 3 REBOUNDMAN (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL36.3727.3063.67
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) $0.25 PER HOUR ADDITIONAL36.9627.3064.26
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL37.4627.3064.76
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED29.9427.3057.24
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.2527.3063.55
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.3527.3063.65
HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED37.0527.3064.35
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.5527.3063.85
(UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.7227.3064.02
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.5027.3063.80
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED37.2027.3064.50
LABORER: MASON TENDER-BRICK MARIN COUNTY37.5425.5563.09
MASON TENDER, BRICK SAN FRANCISCO AND SAN MATEO COUNTIES FOOTNOTES: UNDERGROUND WORK SUCH AS SEWERS, MANHOLES, CATCH BASINS, SEWER PIPES, TELEPHONE CONDUITS, TUNNELS AND CUT TRENCHES: $5.00 PER DAY ADDITIONAL. WORK IN LIVE SEWAGE: $2.50 PER DAY ADDITIONAL37.0527.4564.50
PLASTERER TENDER (EL DORADO, MARIN, NAPA, PLACER, SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO AND YUBA COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL39.7728.5468.31
PLASTER TENDER (SAN FRANCISCO AND SAN MATEO COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL41.9330.3272.25
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: NEW CONSTRUCTION (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts $0.25 per hour additional35.2527.3062.55
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: ESTABLISHMENT WARRANTY PERIOD (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional28.9427.3056.24
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: NEW CONSTRUCTION (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional36.2527.3063.55
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: ESTABLISHMENT WARRANTY PERIOD (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional29.9427.3057.24
LABORERS:, WRECKING - AREA B: GROUP 2 Semi-skilled wrecker (salvaging of other building materials)(AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional35.3527.3062.65
LABORERS:, WRECKING - AREA B: GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional35.5027.3062.80
LABORERS:, WRECKING - AREA A: GROUP 2: Semi-skilled wrecker (salvaging of other building materials) (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional36.3527.3063.65
LABORERS:, WRECKING - AREA A: GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional36.5027.3063.80
LABORERS:, GUNITE - AREA B: GROUP 4: GUNITE LABORER (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts $0.25 per hour additional35.2527.3062.55
LABORERS:, GUNITE - AREA B: GROUP 3: REBOUNDMAN (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts $0.25 per hour additional35.3727.3062.67
LABORERS:, GUNITE - AREA B: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GORUNDMAN (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional35.9627.3063.26
LABORERS:, GUNITE - AREA B: GROUP 1: STRUCTURAL NOZZLEMAN (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional36.4627.3063.76
LABORERS:, GUNITE - AREA A: GROUP 4: GUNITE LABORER (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional36.2527.3063.55
LABORERS:, GUNITE - AREA A: GROUP 3: REBOUNDMAN (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional36.3727.3063.67
LABORERS:, GUNITE - AREA A: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts $0.25 per hour additional36.9627.3064.26
LABORERS:, GUNITE - AREA A: GROUP 1: STRUCTURAL NOZZLEMAN (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional37.4627.3064.76
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of """"form stripping, cleaning and oiling and moving to the next point of erection"". (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional28.9427.3056.24
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional35.2527.3062.55
inches (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional35.3527.3062.65
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B GROUP 1-F: Wire winding machine in connection with guniting or shot crete (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional36.0827.3063.38
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional36.0527.3063.35
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B GROUP 1-C: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional35.5527.3062.85
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional35.7227.3063.02
repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional35.5027.3062.80
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts $0.25 per hour additional36.2027.3063.50
(underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed29.9427.3057.24
handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates. Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed37.0827.3064.38
laborers' work; Synthetic thermoplastics and similar type welding (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts $0.25 per hour additional. Sewer cleaners shall receive $4.00 per day above Group 1 wage rates ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates. Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed36.5527.3063.85
handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates. Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed36.5027.3063.80
(and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill (AREA ""A"" - SANTA CLARA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional. Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates. Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed37.2027.3064.50
MASON TENDER, BRICK (SANTA CRUZ COUNTY)35.2926.8562.14
MASON TENDER, BRICK (SANTA CLARA COUNTY)35.2926.8562.14
LABORER: MASON TENDER-BRICK (MONTEREY AND SAN BENITO COUNTIES)36.2925.5561.84
PLASTER TENDER (SANTA CLARA & SANTA CRUZ) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL40.6829.6870.36
PLASTERER TENDER (MONTEREY AND SAN BENITO COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL40.6829.6870.36
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEW CONSTRUCTION (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL36.2527.3063.55
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) $0.25 PER HOUR ADDITIONAL29.9427.3057.24
LABORERS:, WRECKING: GROUP 2 GROUP 2: Semi-skilled wrecker (salvaging of other building materials) (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) $0.25 PER HOUR ADDITIONAL36.3527.3063.65
LABORERS:, WRECKING: GROUP 1 Skilled wrecker (removing and salvaging of sash, windows and materials) (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL36.5027.3063.80
LABORERS:, GUNITE: GROUP 4 GUNITE LABORER (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL36.2527.3063.55
LABORERS:, GUNITE: GROUP 3 REBOUNDMAN (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL36.3727.3063.67
LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN (ALAMEDA COUNTY) FOOTNOTE LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL36.9627.3064.26
LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL37.4627.3064.76
SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED29.9427.3057.24
TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY) (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.2527.3063.55
INCHES (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.3527.3063.65
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-F WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED37.0827.3064.38
FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED37.0527.3064.35
BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.5527.3063.85
METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.7227.3064.02
VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER (ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.5027.3063.80
(ALAMEDA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) $0.25 PER HOUR ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES. MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED37.2027.3064.50
BRICK TENDER (ALAMEDA COUNTY) FOOTNOTES: WORK ON JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED $2.00 PER HOUR ADDITIONAL. WORK AT GRINDERS: $.25 PER HOUR ADDITIONAL. MANHOLE WORK: $2.00 PER DAY ADDITIONAL37.0527.4564.50
PLASTERER TENDER (ALAMEDA AND CONTRA COSTA COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL41.9330.3272.25
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: NEW CONSTRUCTION (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional35.2527.3062.55
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: ESTABLISHMENT WARRANTY PERIOD (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts $0.25 per hour additional28.9427.3056.24
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: NEW CONSTRUCTION (AREA ""A"" - CONTRA COSTA COUNTY ) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional36.2527.3063.55
LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: ESTABLISHMENT WARRANTY PERIOD (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional29.9427.3057.24
LABORERS:, WRECKING - AREA B: GROUP 2: Semi-skilled wrecker (salvaging of other building materials) (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional35.3527.3062.65
LABORERS:, WRECKING - AREA B: GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts $0.25 per hour additional35.5027.3062.80
LABORERS:, WRECKING - AREA A: GROUP 2: Semi-skilled wrecker (salvaging of other building materials) (AREA ""A"" - CONTRA COSTA COUNTY ) FOOTNOTE Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional36.3527.3063.65
LABORERS:, WRECKING - AREA A: GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) (AREA ""A"" - CONTRA COSTA COUNTY ) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional36.5027.3063.80
LABORERS:, GUNITE - AREA B: GROUP 4: Gunite laborer (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional35.2527.3062.55
LABORERS:, GUNITE - AREA B: GROUP 3: Reboundman (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional35.3727.3062.67
LABORERS:, GUNITE - AREA B: GROUP 2: Nozzleman, Gunman, Potman, Groundman (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional35.9627.3063.26
LABORERS:, GUNITE - AREA B: GROUP 1: Structural nozzleman (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional36.4627.3063.76
LABORERS:, GUNITE - AREA A: GROUP 4: Gunite laborer (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional36.2527.3063.55
LABORERS:, GUNITE - AREA A: GROUP 3: Reboundman (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional36.3727.3063.67
LABORERS:, GUNITE - AREA A: GROUP 2: Nozzleman, Gunman, Potman, Groundman (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts $0.25 per hour additional36.9627.3064.26
LABORERS:, GUNITE - AREA A: GROUP 1: Structural nozzleman (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional37.4627.3064.76
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional28.9427.3056.24
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts $0.25 per hour additional35.2527.3062.55
inches (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts $0.25 per hour additional35.3527.3062.65
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B GROUP 1-F: Wire winding machine in connection with guniting or shot crete (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional36.0827.3063.38
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional36.0527.3063.35
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B GROUP 1-C: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional35.5527.3062.85
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES)35.7227.3063.02
No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional35.5027.3062.80
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill (AREA ""B"" - NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional36.2027.3063.50
performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates. Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed29.9427.3057.24
lines, Victaulic or similar; Tool room attendant (jobsite only) (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional. Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates. Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed36.2527.3063.55
(AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.3527.3063.65
voids; Precast manhole setters, cast in place manhole from setters (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts $0.25 per hour additional. Sewer cleaners shall receive $4.00 per day above Group 1 wage rates ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates. Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed36.7027.3064.00
GROUP 1-F: Wire winding machine in connection with guniting or shot crete (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts $0.25 per hour additional. Sewer cleaners shall receive $4.00 per day above Group 1 wage rates ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates. Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed37.0827.3064.38
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED37.0527.3064.35
BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.5527.3063.85
METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT (AREA ""A"" - CONTRA COSTA COUNTY) SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.7227.3064.02
(and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill (AREA ""A"" - CONTRA COSTA COUNTY) FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional. Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates. Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed37.2027.3064.50
LABORER: MASON TENDER-BRICK (SOLANO AND SONOMA COUNTIES) FOOTNOTE: REFRACTORY WORK WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL36.8426.2463.08
BRICK TENDER (CONTRA COSTA COUNTY) FOOTNOTES WORK ON JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL. WORK AT GRINDERS: $.25 PER HOUR ADDITIONAL. MANHOLE WORK $2.00 PER DAY ADDITIONAL37.0527.4564.50
PLASTER TENDER (EL DORADO, MARIN, NAPA, PLACER, SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO, AND YUBA COUNTIES) Work on a swing stage scaffold: $1.00 per hour additional39.7728.5468.31
PAINTERS: BRUSH (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) SPRAY/SANDBLAST $0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR. HIGH TIME: OVER 50 FT ABOVE GROUND OR WATER LEVEL $2.00 ADDITIONAL PER HOUR 100 TO 180 FT ABOVE GROUND OR WATER LEVEL $4.00 ADDITIONAL PER HOUR. OVER 180 FT ABOVE GROUND OR WATER LEVEL $6.00 ADDITIONAL PER HOUR43.4522.8066.25
SOFT FLOOR LAYER (ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ AND SONOMA COUNTIES)59.0033.0392.03
DRYWALL FINISHER/TAPER: (AREA 2) AREA 2: EL DORADO COUNTY, MONTEREY, PLACER, SACRAMENTO, BENITO, SANTA CRUZ, SIERRA, SUTTER AND YUBA COUNTIES59.6331.2990.92
DRYWALL FINISHER/TAPER: (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, NAPA, SAN FRANCISCO, SAN SANTA CLARA, SOLANO AND SONOMA COUNTIES63.7632.6996.45
PAINTER (ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, SAN BENITO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO & SONOMA COUNTIES) FOOTNOTES SPRAY WORK: $0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR53.3828.0481.42
PAINTER (SAN FRANCISCO COUNTY)57.0028.0485.04
GLAZIER (ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SONOMA COUNTIES;AND SOLANO COUNTY (WEST OF A LINE DEFINED AS FOLLOWS: HWY. 80 CORRIDOR BEGINNING AT THE CITY OF FAIRFIELD, INCLUDING TRAVIS AIR FORCE BASE AND SUISUN CITY; GOING NORTH OF MANAKAS CORNER RD., CONTINUE NORTH ON SUISUN VALLEY RD. TO THE NAPA COUNTY LINE; HWY 80 CORRIDOR SOUTH ON GRIZZLY ISLAND RD. TO THE GRIZZLY ISLAND MANAGEMENT AREA)56.2234.0090.22
PAINTER: SPRAY PAINTER (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY & PAPERHANGER = $0.85/HR SPECIAL COATINGS (BRUSH), & SANDBLAST = $0.50/HR SPECIAL COATINGS (SPRAY), & STEEPLEJACK = $1.00/HR SWING STAGE = $2.00/HR *A SPECIAL COATING IS A COATING THAT REQUIRES THE MIXING OF 2 OR MORE PRODUCTS41.4316.1657.59
PAINTER: PAPER HANGER (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY & PAPERHANGER = $0.85/HR SPECIAL COATINGS (BRUSH), & SANDBLAST = $0.50/HR SPECIAL COATINGS (SPRAY), & STEEPLEJACK = $1.00/HR SWING STAGE = $2.00/HR *A SPECIAL COATING IS A COATING THAT REQUIRES THE MIXING OF 2 OR MORE PRODUCTS42.1916.1658.35
PAINTER: BRUSH AND ROLLER (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY & PAPERHANGER = $0.85/HR SPECIAL COATINGS (BRUSH), & SANDBLAST = $0.50/HR SPECIAL COATINGS (SPRAY), & STEEPLEJACK = $1.00/HR SWING STAGE = $2.00/HR *A SPECIAL COATING IS A COATING THAT REQUIRES THE MIXING OF 2 OR MORE PRODUCTS39.4316.1655.59
SOFT FLOOR LAYER (EL DORADO AND PLACER COUNTIES)34.2716.4750.74
DRYWALL FINISHER/TAPER (EL DORADO AND PLACER COUNTIES) STEEPLEJACK-DRYWALL FINISHER OVER 40 FT WITH OPEN SPACE BELOW: $1.50 ADDITIONAL PER HOUR42.7916.1258.91
GLAZIER (EL DORADO, PLACER, SACRAMENTO, SOLANO, SUTTER, YOLO AND YUBA COUNTIES) PAID HOLIDAYS NEW YEAR'S DAY, MARTIN LUTHER KING, JR. DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTE: EMPLOYEE REQUIRED TO WEAR A BODY HARNESS SHALL RECEIVE $1.50 ABOVE THE BASIC HOURLY RATE AT ANY ELEVATION43.2535.6278.87
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT SEALING35.1117.6252.73
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO PLASTIC; TAPE, TRAFFIC STRIPES AND MARKINGS40.8317.6258.45
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND INSTALLER34.7117.6252.33
SOFT FLOOR LAYER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)48.5426.5975.13
PLASTERER (ALAMEDA, CONTRA COSTA, SAN FRANCISCO AND SAN MATEO COUNTIES)42.4130.7373.14
PLASTERER (AREA 355: MARIN COUNTY)36.7331.6868.41
PLASTERER (AREA 337: MONTEREY COUNTY)32.8831.6864.56
PLASTERER (AREA 295: EL DORADO, NAPA, PLACER, SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO & YUBA COUNTIES)32.7031.6864.38
PLASTERER (AREA 224: SAN BENITO, SANTA CLARA & SANTA CRUZ COUNTIES)32.8831.6864.56
CEMENT MASON/CONCRETE FINISHER32.1523.2755.42
PLUMBER, STEAMFITTER, REFRIGERATION FITTER: (2) NEW CONSTRUCTION IN SAN FRANCISCO COUNTY (MARIN, SAN FRANCISCO & SONOMA COUNTIES)91.0049.49140.49
PLUMBER, STEAMFITTER, REFRIGERATION FITTER: (1) Wood Frame Construction in San Francisco, and all work in Marin & Sonoma Counties (MARIN, SAN FRANCISCO & SONOMA COUNTIES)82.0048.18130.18
LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY FITTER (MARIN, SAN FRANCISCO & SONOMA COUNTIES)77.3536.53113.88
PLUMBER & STEAMFITTER (MONTEREY AND SANTA CRUZ COUNTIES)57.7543.60101.35
PLUMBER, PIPEFITTER, STEAMFITTER (CONTRA COSTA COUNTY)43.7220.2964.01
PLUMBER (SUTTER & YUBA COUNTIES)52.7541.3994.14
PLUMBER & STEAMFITTER (ALAMEDA COUNTY)80.5050.45130.95
FROM SWINGING SCAFFOLDS, BOATSWAINS CHAIRS OR SIMILAR DEVICES: $.75 PER HOUR ADDITIONAL37.3521.1558.50
PLUMBERS AND PIPEFITTERS (EL DORADO AND PLACER COUNTIES (LAKE TAHOE BASIN ONLY))52.1418.7170.85
UNDERGROUND UTILITY WORKER: /LANDSCAPE FITTER (ALAMEDA, CONTRA COSTA, EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, SUTTER, YOLO AND YUBA COUNTIES)36.0118.5054.51
PLUMBERS AND PIPEFITTERS (SAN BENITO & SANTA CLARA COUNTIES)30.907.9038.80
PLUMBERS AND PIPEFITTERS (EL DORADO,PLACER, SACRAMENTO AND YOLO COUNTIES)55.5824.0279.60
PLUMBER/PIPEFITTER/STEAMFITTER (SAN MATEO COUNTY)87.7541.44129.19
ROOFER (SAN FRANCISCO & SAN MATEO COUNTIES)55.3022.9778.27
ROOFER (ALAMEDA, CONTRA COSTA, MARIN, NAPA, SOLANO, AND SONOMA COUNTIES)54.9423.3478.28
ROOFER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)46.7321.3668.09
ROOFER: KETTLE PERSON (2 KETTLES) (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)55.1721.5176.68
ROOFER: JOURNEYMAN (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)53.1721.5174.68
ROOFER: BITUMASTIC, ENAMELER, COAL TAR, PITCH AND MASTIC WORKER (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES)57.1721.5178.68
SPRINKLER FITTER (ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SOLANO AND SONOMA COUNTIES:)49.8218.0567.87
SPRINKLER FITTER (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES)49.6929.7279.41
SPRINKLER FITTER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)52.0629.8681.92
SHEET METAL WORKER: (AREA 2) AREA 2: MONTEREY & SAN BENITO60.6439.0499.68
SHEET METAL WORKER: (AREA 3) AREA 3: SANTA CRUZ55.1634.1889.34
SHEET METAL WORKER: (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SOLANO & SONOMA67.0350.79117.82
SHEET METAL WORKER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)30.2916.4146.70
TRUCK DRIVERS: GROUP 5: DUMP TRUCKS, 65 YDS. AND OVER; HOLLAND HAULER; LOW BED HEAVY DUTY TRANSPORT OVER 7 AXLES FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED44.5634.2878.84
TRUCK DRIVERS: GROUP 4: DUMP TRUCKS, OVER 25 YDS AND UNDER 65 YDS.; WATER PULLS - DW 10'S, 20'S, 21'S AND OTHER SIMILAR EQUIPMENT WHEN PULLING AQUA/PAK OR WATER TANK TRAILERS; HELICOPTER PILOTS (WHEN TRANSPORTING MEN AND MATERIALS); LOWBEDK HEAVY DUTY TRANSPORT UP TO INCLUDING 7 AXLES; DW10'S, 20'S, 21'S AND OTHER SIMILAR CAT TYPE, TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR GREASE TANK TRAILERS OR OTHER MISCELLANEOUS TRAILERS; VACUUM TRUCKS 7500 GALS AND OVER AND TRUCK REPAIRMAN FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED44.2134.2878.49
GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL TRAILERS; LOWBED HEAVY DUTY TRANSPORT; HEAVY DUTY TRANSPORT TILLER PERSON; SELF- PROPELLED STREET SWEEPER WITH SELF-CONTAINED REFUSE BIN; BOOM TRUCK - HYDRO-LIFT OR SWEDISH TYPE EXTENSION OR RETRACTING CRANE; P.B. OR SIMILAR TYPE SELF-LOADING TRUCK; TIRE REPAIRPERSON; COMBINATION BOOTPERSON AND ROAD OILER; DRY DISTRIBUTION TRUCK (A BOOTPERSON WHEN EMPLOYED ON SUCH EQUIPMENT, SHALL RECEIVE THE RATE SPECIFIED FOR THE CLASSIFICATION OF ROAD OIL TRUCKS OR BOOTPERSON); AMMONIA NITRATE DISTRIBUTOR, DRIVER AND MIXER; SNOW GO AND/OR PLOW FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED43.8634.2878.14
TRUCK DRIVERS: GROUP 2: DUMP TRUCKS, 6 YDS. AND UNDER 8 YDS.; TRANSIT MIXERS, THROUGH 10 YDS.; WATER TRUCKS, UNDER 7,000 GALS.; JETTING TRUCKS, UNDER 7,000 GALS.; SINGLE-UNIT FLAT RACK (3-AXLE UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; RUBBER-TIRED MUCK CAR (NOT SELF-LOADED); RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND ""A"" FRAME DRIVERS; COMBINATION WINCH TRUCK WITH HOIST; ROAD OIL TRUCK OR BOOTPERSON; BUGGYMOBILE; ROSS, HYSTER AND SIMILAR STRADDLE CARRIERS; SMALL RUBBER-TIRED TRACTOR FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED43.5634.2877.84
TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK (2- AXLE UNIT); NIPPER TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP MACHINE; FORK LIFT AND LIFT JITNEYS; FUEL AND/OR GREASE TRUCK DRIVER OR FUEL PERSON; SNOW BUGGY; STEAM CLEANING; BUS OR PERSONHAUL DRIVER; ESCORT OR PILOT CAR DRIVER; PICKUP TRUCK; TEAMSTER OILER/GREASER AND/OR SERVICEPERSON; HOOK TENDER (INCLUDING LOADING AND UNLOADING); TEAM DRIVER; TOOL ROOM ATTENDANT (REFINERIES) FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED43.2634.2877.54
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.