Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

Davis-Bacon rates — Humboldt County, California

Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.

Pick the construction type that matches your contract, not the highest rate. Building, Residential, Highway and Heavy are separate determinations with different rates, and using the wrong one is a common reason a certified payroll comes back rejected. Where your trade appears under several classifications the choice between them is a judgement call — the plainest match is usually right, and the contracting officer can confirm it.
Building
CA20260005 rev 2 · 05/20/2026 · 130 classifications
ClassificationBase rateFringeTotal
TRUCK DRIVERS: GROUP 37 Over 80 to 95 yds19.147.6926.83
TRUCK DRIVERS: GROUP 36 Over 65 to 80 yds18.997.6926.68
TRUCK DRIVERS: GROUP 35 Bulk cement spreader (with or without auger, over 50 yds. and under 65 yds water level); Dump (over 50 yds. and under 65 yds water level); Dumpcrete (over 50 yds. and under 65 yds. water level); Dumpster (over 50 yds. and under 65 yds. water level); Helicopter pilot (when transporting workers ormaterials); Skid (debris box, over 50 yds. and under 65 yds. water level); Truck (dry pre-batch concrete mix, over 50 yds. and under 65 yds. water level)18.847.6926.53
TRUCK DRIVERS: GROUP 34 DW 10's, 20's, 21's and other similar Cat type, Terra Cobra, LeTournapulls, Tournarocker, Euclid and similar type equipment when pulling Aqua/Pak or water tank trailers18.797.6926.48
TRUCK DRIVERS: GROUP 33 Bulk cement spreader (with or without auger, over 35 yds. and including 50 yds. water level); Dump (over 35 yds. and including 50 yds. water level); Dumpcrete (over 35 yds. and including 50 yds. water level); Dumpster (over 35 yds. and including 50 yds. water level); Skid (debris box, over 35 yds. and including 50 yds water level); Truck (dry pre-batch concrete mix, over 35 yds. and including 50 yds. water level)18.697.6926.38
TRUCK DRIVERS: GROUP 32 Bulk cement spreader (with or without auger, over 24 yds. and including 35 yds. water level); Dump (over 24 yds. and including 35 yds. water level); Dumpcrete (over 24 yds. and including 35 yds. water level); Dumpster (over 24 yds. and including 35 yds. water level); DW 10's, 20's, 21's and other similar Cat type, Terra Cobra, LeTournapulls, Tournarocker, Euclid and similar type equipment when pulling fuel and/or grease tank trailers or other miscellaneous trailers; Skid (debris box, over 24 yds. and including 35 yds water level); Truck (dry pre- batch concrete mix, over 24 yds. and including 35 yds. water level)18.547.6926.23
TRUCK DRIVERS: GROUP 31 Bulk cement spreader (with or without auger, over 18 yds. and including 24 yds. water level); Combination dump and dump trailer; Dump (over 18 yds. and including 24 yds water level); Dumpcrete (over 18 yds. and including 24 yds. water level); Dumpster (over 18 yds. and including 24 yds. water level); Skid (debris box, over 18 yds. and including 24 yds. water level); Transit mix agitator (over 12 yds. through 16 yds.); Truck (dry pre-batch concrete mix, over 18 yds. and including 24 yds. water level)18.487.6926.17
TRUCK DRIVERS: GROUP 30 Truck repair; Hydro-lift or Swedish crane type (including when Swedish crane is used for jetting); Hydro-lift extension or retracting crane (boom-type)18.477.6926.16
TRUCK DRIVERS: GROUP 29 Transit mix agitator (over 14 yds. through 16 yds.)18.457.6926.14
TRUCK DRIVERS: GROUP 28 P.B. or similar type self-loading truck18.447.6926.13
TRUCK DRIVERS: GROUP 27 Double gooseneck (7 or more axles); Heavy-duty transport tiller18.407.6926.09
TRUCK DRIVERS: GROUP 26 Ammonia nitrate distributor driver and mixer; Bulk cement spreader (with or without auger, over 12 yds. and including 18 yds. water level); Dump (over 12 yds. and including 18 yds. water level); Dumpcrete (over 12 yds. and including 18 yds. water level); Dumpster (over 12 yds. and including 18 yds. water level); Skid (debris box, over 12 yds. and including 18 yds. water level); Truck (dry pre-batch concrete mix, over 12 yds. and including 18 yds. water level)18.387.6926.07
TRUCK DRIVERS: GROUP 25 Heavy-duty transport (gooseneck lowbed); Transit mix or agitator (over 12 yds. through 14 yds.)18.357.6926.04
TRUCK DRIVERS: GROUP 24 Bulk cement spreader (with or without auger, 8 ys. and including 12 yds. water level); Dump (8 yds. and including 12 yds. water level); Dumpcrete (8 yds. and including 12 yds water level); Dumpster (8 yds. and including 12 yds. water level); Self-propelled street sweeper with self-contained refuse bin; Skid (debris box, 8 yds. and including 12 yds. water level); Snow Go and/or snow plow; Truck (dry pre-batch concrete mix, 8 yds. and including 12 yds. water level)18.347.6926.03
TRUCK DRIVERS: GROUP 23 Transit mix or agitator (over 10 yds. through 12 yds.)18.257.6925.94
TRUCK DRIVERS: GROUP 22 Combination boot person and road oiler18.247.6925.93
TRUCK DRIVERS: GROUP 21 Jetting truck and water truck (5,000 gallons and under 7,000 gallons)18.217.6925.90
TRUCK DRIVERS: GROUP 20 Vacuum truck (5,500 gallons and under 7,500 gallons)18.167.6925.85
TRUCK DRIVERS: GROUP 19 Transit mix or agitator (8 yds. through 10 yds.)18.157.6925.84
TRUCK DRIVERS: GROUP 18 Ross Hyster and similar straddle carrier18.147.6925.83
TRUCK DRIVERS: GROUP 17 Heavy-duty transport (high bed)18.127.6925.81
TRUCK DRIVERS: GROUP 16 A-frame, winch truck; Buggymobile; Jetting and water truck (4,000 gallons and under 5,000 gallons); Rubber-tired truck jumbo18.117.6925.80
TRUCK DRIVERS: GROUP 15 Bulk cement spreader (with or without auger, 6 yds. and under 8 yds. water level); Dump (6 yds. and under 8 yds. water level); Dumpcrete (6 yds. and under 8 yds. water level); Dumpster (6 yds. and under 8 yds. water level); Skid (debris box, 6 yds. and under 8 yds. water level); Truck (dry pre-batch concrete mix, 6 yds and under 8 yds. water level)18.107.6925.79
TRUCK DRIVERS: GROUP 14 Rubber-tired muck car (not self-loaded)18.077.6925.76
TRUCK DRIVERS: GROUP 13 Vacuum truck, 3,500 gallons and under 5,500 gallons18.067.6925.75
TRUCK DRIVERS: GROUP 12 Combination winch truck with hoist; Transit mix or agitator (6 yds. and under 8 yds.)18.057.6925.74
TRUCK DRIVERS: GROUP 11 Jetting truck and water truck, 2,500 gallons and under 4,000 gallons18.017.6925.70
TRUCK DRIVERS: GROUP 10 Scissor truck; Single unit flat rack (3-axle unit); Industrial lift truck (mechanical tailgate); Small rubber-tired tractor (when used within teamsters' jurisdiction)18.007.6925.69
TRUCK DRIVERS: GROUP 9 Vacuum truck, under 3,500 gallons17.987.6925.67
TRUCK DRIVERS: GROUP 8 Fuel and/or grease truck driver or fuel worker17.977.6925.66
TRUCK DRIVERS: GROUP 7 Transit mix, agitator (under 6 yds.)17.957.6925.64
TRUCK DRIVERS: GROUP 6 Lift jitney, fork lift17.937.6925.62
TRUCK DRIVERS: GROUP 5 Road oil truck or boot17.927.6925.61
TRUCK DRIVERS: GROUP 4 Jetting truck and water truck (under 2,500 gallons)17.917.6925.60
TRUCK DRIVERS: GROUP 3 Bulk cement spreader (with or without auger, 4 yd. and under 6 yds. water level); Dump (4 yds. and under 6 yds. water level); Dumpcrete (4 yds. and under 6 yds. water level); Dumpster (4 yds. and under 6 yds. water level); Skid (debris box, 4 yds. and under 6 yds. water level); Single unit flat rack (2-axle unit); Industrial lift truck (mechanical tailgate); Truck (dry pre-batch concrete mix, 4 yds. and under 6 yds. water level)17.907.6925.59
TRUCK DRIVERS: GROUP 2 Teamster oiler and/or greaser and/or service17.887.6925.57
TRUCK DRIVERS: GROUP 1 Bulk cement spreader (with or without auger, under 4 yds. water level); Bus driver; Concrete pump machine; Concrete pump truck (when flat rack truck is used appropriate flat rack rate shall apply); Dump (under 4 yds. water level); Dumpcrete truck (under 4 yds. water level); Dumpster (under 4 yds. water level); Escort or pilot car driver; Nipper truck (when flat rack truck is used appropriate flat rack rate shall apply); Pick-up; Skid (debris box, under 4 yds water level); Team driver; Truck (dry pre-batch concrete mix, under 4 yds. water level)17.807.6925.49
TILE SETTER23.354.4827.83
TILE FINISHER16.174.9821.15
TERRAZZO FINISHER: TERRAZZO FINISHER (HUMBOLDT, LAKE, MENDOCINO)16.994.1821.17
TERRAZZO FINISHER: TERRAZZO FINISHER (DEL NORTE COUNTY)16.723.9520.67
TERRAZZO FINISHER: BASE MACHINE OPERATOR (HUMBOLDT, LAKE, MENDOCINO)17.694.1821.87
TERRAZZO FINISHER: BASE MACHINE OPERATOR (DEL NORTE COUNTY)17.423.9521.37
SPRINKLER FITTER24.183.7527.93
SHEET METAL WORKER (LAKE & MENDOCINO COUNTIES)27.177.1734.34
SHEET METAL WORKER (DEL NORTE & HUMBOLDT COUNTIES).$ 18.65 4.85 ROOFERS: ROOFER (LAKE & MENDOCINO COUNTIES)17.657.1724.82
ROOFERS: MASTIC WORKER; KETTLE TENDER (2 KETTLES WITHOUT PUMPS) (LAKE & MENDOCINO COUNTIES)17.907.1725.07
ROOFERS: ENAMELER & PITCH (DEL NORTE)18.303.8422.14
ROOFERS: BITUMASTIC; COAL TAR BUILT-UP; ENAMELER; PIPEWRAPPER (LAKE & MENDOCINO COUNTIES)19.657.1726.82
ROOFER (HUMBOLDT COUNTY)12.002.0014.00
ROOFER (DEL NORTE)16.303.8420.14
intersection of the Pacific Ocean, Thence northerly along the Pacific Ocean to the point of beginning HUMBOLDT COUNTY: AREA 2: Remainder of county LAKE COUNTY: AREA 1: Southern 2/3 LAKE COUNTY AREA 2: NORTHERN 1/3 MENDOCINO COUNTY: AREA 1 Southeastern part MENDOCINO COUNTY: AREA 2 Remainder of County AREA 2: $2.00 PREMIUM OF AREA 117.319.7027.01
intersection of the Pacific Ocean, Thence northerly along the Pacific Ocean to the point of beginning HUMBOLDT COUNTY: AREA 2: Remainder of county LAKE COUNTY: AREA 1: Southern 2/3 LAKE COUNTY AREA 2: NORTHERN 1/3 MENDOCINO COUNTY: AREA 1 Southeastern part MENDOCINO COUNTY: AREA 2 Remainder of County AREA 2: $2.00 PREMIUM OF AREA 118.159.7027.85
intersection of the Pacific Ocean, Thence northerly along the Pacific Ocean to the point of beginning HUMBOLDT COUNTY: AREA 2: Remainder of county LAKE COUNTY: AREA 1: Southern 2/3 LAKE COUNTY AREA 2: NORTHERN 1/3 MENDOCINO COUNTY: AREA 1 Southeastern part MENDOCINO COUNTY: AREA 2 Remainder of County AREA 2: $2.00 PREMIUM OF AREA 118.999.7028.69
intersection of the Pacific Ocean, Thence northerly along the Pacific Ocean to the point of beginning HUMBOLDT COUNTY: AREA 2: Remainder of county LAKE COUNTY: AREA 1: Southern 2/3 LAKE COUNTY AREA 2: NORTHERN 1/3 MENDOCINO COUNTY: AREA 1 Southeastern part MENDOCINO COUNTY: AREA 2 Remainder of County AREA 2: $2.00 PREMIUM OF AREA 119.979.7029.67
intersection of the Pacific Ocean, Thence northerly along the Pacific Ocean to the point of beginning HUMBOLDT COUNTY: AREA 2: Remainder of county LAKE COUNTY: AREA 1: Southern 2/3 LAKE COUNTY AREA 2: NORTHERN 1/3 MENDOCINO COUNTY: AREA 1 Southeastern part MENDOCINO COUNTY: AREA 2 Remainder of County AREA 2: $2.00 PREMIUM OF AREA 120.939.7030.63
intersection of the Pacific Ocean, Thence northerly along the Pacific Ocean to the point of beginning HUMBOLDT COUNTY: AREA 2: Remainder of county LAKE COUNTY: AREA 1: Southern 2/3 LAKE COUNTY AREA 2: NORTHERN 1/3 MENDOCINO COUNTY: AREA 1 Southeastern part MENDOCINO COUNTY: AREA 2 Remainder of County AREA 2: $2.00 PREMIUM OF AREA 121.969.7031.66
intersection of the Pacific Ocean, Thence northerly along the Pacific Ocean to the point of beginning HUMBOLDT COUNTY: AREA 2: Remainder of county LAKE COUNTY: AREA 1: Southern 2/3 LAKE COUNTY AREA 2: NORTHERN 1/3 MENDOCINO COUNTY: AREA 1 Southeastern part MENDOCINO COUNTY: AREA 2 Remainder of County AREA 2: $2.00 PREMIUM OF AREA 123.049.7032.74
intersection of the Pacific Ocean, Thence northerly along the Pacific Ocean to the point of beginning HUMBOLDT COUNTY: AREA 2: Remainder of county LAKE COUNTY: AREA 1: Southern 2/3 LAKE COUNTY AREA 2: NORTHERN 1/3 MENDOCINO COUNTY: AREA 1 Southeastern part MENDOCINO COUNTY: AREA 2 Remainder of County AREA 2: $2.00 PREMIUM OF AREA 124.179.7033.87
PLUMBER AND STEAMFITTER (LAKE & MENDOCINO COUNTIES)29.8412.5342.37
PLUMBER AND STEAMFITTER (DEL NORTE & HUMBOLDT COUNTIES)16.479.4525.92
PLASTERER17.738.2225.95
PARKING LOT STRIPING/HIGHWAY MARKING: SLURRY SEAL WORK: SEALER/MIXER14.543.5218.06
PARKING LOT STRIPING/HIGHWAY MARKING: SLURRY SEAL WORK: OPERATOR & SHUTTLE12.883.5216.40
PARKING LOT STRIPING/HIGHWAY MARKING: GROUP 4 TRAFFIC PROTECTIVE DELINEATING SYSTEMS INSTALLER removes; relocates; installs permanently affixed roadside and parking delineation barricades; fencing, guard rail; cable anchor, retaining walls, reference signs, monument markers16.833.5220.35
PARKING LOT STRIPING/HIGHWAY MARKING: GROUP 3 SURFACE ABRASIVE BLASTER: removal of traffic lines and markings, preparation of surface for coatings14.313.5217.83
PARKING LOT STRIPING/HIGHWAY MARKING: GROUP 2 TRAFFIC DELINEATING DEVICE APPLICATOR: Layout and application of pavement markers, delineating signs, rumble and traffic bars, adhesives, guide markers; other traffic delineating devices; includes all related surface preparation (sandblasting, waterblasting, grinding) as part of the application process15.993.5219.51
PARKING LOT STRIPING/HIGHWAY MARKING: GROUP 1 STRIPER: Layout and application of painted traffic stripes and markings; hot thermo plastic; tape traffic stripes and markings16.833.5220.35
PAINTERS: SANDBLASTING; SPRAY; STEAM-CLEANING (LAKE AND MENDOCINO COUNTIES)21.284.6825.96
PAINTERS: PAPERHANGER; SANDBLASTER; SPRAY; STRUCTURAL STEEL; SWING STAGE; TAPER (DEL NORTE AND HUMBOLDT COUNTIES)12.762.4315.19
PAINTERS: DRYWALL FINISHER; PAPERHANGER (LAKE AND MENDOCINO COUNTIES)21.784.6826.46
PAINTERS: BRUSH; ROLLER (DEL NORTE AND HUMBOLDT COUNTIES)12.512.4314.94
PAINTERS: BRUSH (LAKE AND MENDOCINO COUNTIES)20.784.6825.46
MARBLE FINISHER (HUMBOLDT, LAKE & MENDOCINO COUNTIES)15.223.9219.14
MARBLE FINISHER (DEL NORTE COUNTY)13.923.6717.59
MARBLE AND TERRAZZO SETTER21.094.1325.22
LINE CONSTRUCTION, LINE TECHNICIAN (LAKE AND MENDICINO COUNTIES)22.855.4328.28
LINE CONSTRUCTION, LINE TECHNICIAN (HUMBOLDT COUNTY)17.416.0323.44
LINE CONSTRUCTION, HEAVY EQUIPMENT OPERATOR (LAKE AND MENDICINO COUNTIES)18.225.2923.51
LINE CONSTRUCTION, HEAVY EQUIPMENT OPERATOR (HUMBOLDT COUNTY)15.675.9621.63
CALIFORNIA. ZONE 2: 3-20 MILES RADIUS. ZONE 3 20-35 MILES RADIUS. ZONE 4: 35-50 MILES RADIUS ZONE 5: OVER 50 MILES RADIUS. BASE RATE (ZONE 1) IS PAID WHEN WORKING OUT OF EMPLOYER'S PERMANENT SHOP. $ 13.23 3.71 LINE CONSTRUCTION, GROUP 6- Head ground person (chipper) (DEL NORTE COUNTY ZONES- ZONE 1: 0-3 MILES RADIUS FROM THE GEOGRAPHICAL CENTER OF ALTUROS AND YREKA, CALIFORNIA. ZONE 2: 3-20 MILES RADIUS. ZONE 3: 20-35 MILES RADIUS. ZONE 4: 35-50 MILES RADIUS. ZONE 5: OVER 50 MILES RADIUS. BASE RATE (ZONE 1) IS PAID WHEN WORKING OUT OF EMPLOYER'S PERMANENT SHOP. GROUPS 3 AND 6 RECEIVE BASE RATE (ZONE 1) ONLY (NO ZONE DIFFERENTIAL)14.073.7417.81
LINE CONSTRUCTION, GROUP 5- Head ground person, powder, jackhammer operator. (DEL NORTE COUNTY ZONES- ZONE 1: 0-3 MILES RADIUS FROM THE GEOGRAPHICAL CENTER OF ALTUROS AND YREKA, CALIFORNIA. ZONE 2: 3-20 MILES RADIUS. ZONE 3 20-35 MILES RADIUS. ZONE 4: 35-50 MILES RADIUS ZONE 5: OVER 50 MILES RADIUS. BASE RATE (ZONE 1) IS PAID WHEN WORKING OUT OF EMPLOYER'S PERMANENT SHOP. $ 14.07 3.74 LINE CONSTRUCTION, GROUP 4- Line equipment operator. (DEL NORTE COUNTY ZONES- ZONE 1: 0-3 MILES RADIUS FROM THE GEOGRAPHICAL CENTER OF ALTUROS AND YREKA, CALIFORNIA. ZONE 2: 3-20 MILES RADIUS. ZONE 3: 20-35 MILES RADIUS. ZONE 4: 35-50 MILES RADIUS. ZONE 5: OVER 50 MILES RADIUS. BASE RATE (ZONE 1) IS PAID WHEN WORKING OUT OF EMPLOYER'S PERMANENT SHOP16.083.8119.89
LINE CONSTRUCTION, GROUP 3-Tree trimmer. (DEL NORTE COUNTY ZONES- ZONE 1: 0-3 MILES RADIUS FROM THE GEOGRAPHICAL CENTER OF ALTUROS AND YREKA, CALIFORNIA. ZONE 2: 3-20 MILES RADIUS. ZONE 3 20-35 MILES RADIUS. ZONE 4: 35-50 MILES RADIUS ZONE 5: OVER 50 MILES RADIUS. BASE RATE (ZONE 1) IS PAID WHEN WORKING OUT OF EMPLOYER'S PERMANENT SHOP GROUPS 3 AND 6 RECEIVE BASE RATE (ZONE 1) ONLY (NO ZONE DIFFERENTIAL)15.353.7919.14
LINE CONSTRUCTION, GROUP 2-Line technician, pole sprayer, heavy line equipment operator, certified line welder. (DEL NORTE COUNTY ZONES- ZONE 1: 0-3 MILES RADIUS FROM THE GEOGRAPHICAL CENTER OF ALTUROS AND YREKA, CALIFORNIA. ZONE 2: 3-20 MILES RADIUS. ZONE 3: 20-35 MILES RADIUS. ZONE 4: 35-50 MILES RADIUS. ZONE 5: OVER 50 MILES RADIUS. BASE RATE (ZONE 1) IS PAID WHEN WORKING OUT OF EMPLOYER'S PERMANENT SHOP18.653.9022.55
LINE CONSTRUCTION, GROUP 1- Cable splicer, lead pole sprayer. (DEL NORTE COUNTY ZONES- ZONE 1: 0-3 MILES RADIUS FROM THE GEOGRAPHICAL CENTER OF ALTUROS AND YREKA, CALIFORNIA. ZONE 2: 3-20 MILES RADIUS. ZONE 3: 20-35 MILES RADIUS. ZONE 4: 35-50 MILES RADIUS. ZONE 5: OVER 50 MILES RADIUS. BASE RATE (ZONE 1) IS PAID WHEN WORKING OUT OF EMPLOYER'S PERMANENT SHOP20.633.9724.60
LINE CONSTRUCTION, GROUND PERSON (LAKE AND MENDICINO COUNTIES)18.285.2923.57
LINE CONSTRUCTION, GROUND PERSON (HUMBOLDT COUNTY)13.935.8919.82
LINE CONSTRUCTION, CABLE SPLICER (LAKE AND MENDICINO COUNTIES)25.145.4930.63
LINE CONSTRUCTION, CABLE SPLICER (HUMBOLDT COUNTY)18.806.0824.88
LANDSCAPE LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS): NEW CONSTRUCTION16.365.9622.32
LANDSCAPE LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS): ESTABLISHMENT WARRANTY PERIOD10.055.9616.01
of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rockslinger, including placing of sacked concrete and/or sand (wet or dry); Rotary scarifier, multiple head concrete chipper; Davis Trencher, 300 or similar type (and all small trenchers); Roto and Ditch Witch; Roto-tiller; Sandblaster, pot, gun, nozzle operator; Signalling and rigging; Tank cleaner; Tree climber; Vibrascreed, bull float in connection with laborers' work; Vibrator; Dri-pak-it machine; High pressure blow pipe (1-1/2"""" or over, 100 lbs. pressure and over); Hydro seeder and similar type; Certified asbestos laborer; Masonry and plasterer tender. Sewer cleaner receives an additional $4.00 per day, $5.00 per day on recently active large diameter sewers or sewer manholes Laborer working off or with or from bos'n chairs, swinging scaffolds, belts, shall receive $ .25 per hour above the applicable wage rate. This premium rate shall be reckoned by the day and half day16.615.9622.57
LABORERS: GROUP 4 Brick cleaner (jobsite only); Lumber cleaner (jobsite only); (not applicable to """"form stripping"""", cleaning and oiling and moving to the next point of erection) Sewer cleaner receives an additional $4.00 per day, $5.00 per day on recently active large diameter sewers or sewer manholes Laborer working off or with or from bos'n chairs, swinging scaffolds, belts, shall receive $ 25 per hour above the applicable wage rate. This premium rate shall be reckoned by the day and half day10.055.9616.01
LABORERS: GROUP 3 All clean-up work of debris, grounds and buildings including but not limited to street cleaners; Cleaning and washing windows; Construction laborer including bridge and general laborer; Dump; Load spotter; Fire watcher; Street cleaner; Gardener, Horticultural and landscape laborer; Jetting; Limber; Brush loader; Piler; Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Fence erector; Guardrail erector; Pavement marker (button setter) Sewer cleaner receives an additional $4.00 per day, $5.00 per day on recently active large diameter sewers or sewer manholes Laborer working off or with or from bos'n chairs, swinging scaffolds, belts, shall receive $ .25 per hour above the applicable wage rate. This premium rate shall be reckoned by the day and half day16.365.9622.32
LABORERS: GROUP 2 Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and digger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Chuck tender; High pressure nozzle operator, adductor; Grout-crew; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Singlefoot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe under 12 inches Sewer cleaner receives an additional $4.00 per day, $5.00 per day on recently active large diameter sewers or sewer manholes Laborer working off or with or from bos'n chairs, swinging scaffolds, belts, shall receive $ 25 per hour above the applicable wage rate. This premium rate shall be reckoned by the day and half day16.465.9622.42
LABORERS: GROUP 1-F Wire winding machine in connection with guniting or shotcrete - aligner Sewer cleaner receives an additional $4.00 per day, $5.00 per day on recently active large diameter sewers or sewer manholes Laborer working off or with or from bos'n chairs, swinging scaffolds, belts, shall receive $ .25 per hour above the applicable wage rate. This premium rate shall be reckoned by the day and half day17.195.9623.15
LABORERS: GROUP 1-E Laborer on general construction work on or in Bell Hole footings and shaft. Sewer cleaner receives an additional $4.00 per day, $5.00 per day on recently active large diameter sewers or sewer manholes Laborer working off or with or from bos'n chairs, swinging scaffolds, belts, shall receive $ .25 per hour above the applicable wage rate. This premium rate shall be reckoned by the day and half day17.165.9623.12
LABORERS: GROUP 1-D Repair track and road beds (cut and cover work of subway after the temporary cover has been placed). Sewer cleaner receives an additional $4.00 per day, $5.00 per day on recently active large diameter sewers or sewer manholes Laborer working off or with or from bos'n chairs, swinging scaffolds, belts, shall receive $ 25 per hour above the applicable wage rate. This premium rate shall be reckoned by the day and half day16.865.9622.82
LABORERS: GROUP 1-C Burning and welding in connection with laborers' work. Sewer cleaner receives an additional $4.00 per day, $5.00 per day on recently active large diameter sewers or sewer manholes Laborer working off or with or from bos'n chairs, swinging scaffolds, belts, shall receive $ 25 per hour above the applicable wage rate. This premium rate shall be reckoned by the day and half day16.665.9622.62
LABORERS: GROUP 1-A Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Diamond driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Multiple unit drill; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scaler (including drilling of same); Tree topper; Bit grinder Sewer cleaner receives an additional $4.00 per day, $5.00 per day on recently active large diameter sewers or sewer manholes16.835.9622.79
LABORER: GUNITE GROUP 3 General laborer17.365.9623.32
LABORER: GUNITE GROUP 2 Rebound16.485.9622.44
LABORER: GUNITE GROUP 1 Nozzle operator (including gun, pot); Ground17.075.9623.03
LABORER: GROUP 3 General laborer (includes all clean-up work, loading lumber, loading and burning of debris) WRECKING, BUILDINGS AND MISCELLANEOUS STRUCTURES16.365.9622.32
LABORER: GROUP 2 Semi-skilled wrecker (salvaging of other building materials) WRECKING, BUILDINGS AND MISCELLANEOUS STRUCTURES16.465.9622.42
LABORER: GROUP 1 Skilled wrecker (removing and salvaging of sash, windows, doors, plumbing and electric fixtures) WRECKING, BUILDINGS AND MISCELLANEOUS STRUCTURES16.615.9622.57
IRONWORKERS: ORNAMENTAL, REINFORCING, & STRUCTURAL19.158.9328.08
IRONWORKERS: FENCE ERECTOR18.268.9327.19
INSULATOR/ASBESTOS WORKER (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)21.605.6127.21
GLAZIER16.316.1922.50
FLOOR LAYER: CARPET LAKE & MENDOCINO18.73—18.73
FLOOR LAYER: CARPET DEL NORTE & HUMBOLDT14.194.4118.60
ELEVATOR MECHANIC31.063.8734.93
ELECTRICIANS: CABLE SPLICER18.806.0924.89
ELECTRICIANS: (COMMUNICATIONS & SYSTEM ELECTRONIC INSTALLER: COMMUNICATIONS & SYSTEMS TECHNICIAN (INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY (INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION); EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLORO LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS)13.621.3114.93
ELECTRICIAN17.416.0523.46
DRYWALL INSTALLERS/LATHERS: DRYWALL STOCKER, SCRAPPER & CLEAN-UP9.547.4016.94
DRYWALL INSTALLERS/LATHERS: DRYWALL INSTALLER/LATHER19.087.4026.48
DIVER: (DIVER TENDER)20.386.1626.54
DIVER31.639.8841.51
CEMENT MASONS: CEMENT MASON17.916.1824.09
CEMENT MASONS: (SWING OR SLIP FORM SCAFFOLD; MASTIC, MAGNESITE, GYPSUM, EPOXY, POLYESTER, RESIN & ALL COMPOSITION)18.166.1824.34
CARPENTERS: PILEDRIVERMAN - BRIDGE BUILDING21.216.9228.13
CARPENTERS: PILEDRIVERMAN19.389.8829.26
CARPENTERS: MILLWRIGHT19.738.2027.93
CARPENTERS: (HARDWOOD FLOOR LAYER; POWER SAW OPERATOR; SAW FILER; SHINGLER; STEEL SCAFFOLD ERECTOR; STEEL SHORING)19.236.9626.19
CARPENTER19.086.9226.00
BRICKLAYER, STONEMASON22.458.6031.05
BRICK TENDER18.543.8622.40
BOILERMAKER21.604.2525.85
Residential
CA20260027 rev 1 · 05/18/2026 · 9 classifications
ClassificationBase rateFringeTotal
IRONWORKER50.7035.1585.85
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)22.799.6332.42
ROOFER23.00—23.00
PLUMBER21.4514.0535.50
PAINTER (BRUSH AND ROLLER)26.379.8136.18
LABORER: COMMON OR GENERAL16.885.9622.84
ELECTRICIAN31.709.7041.40
CEMENT MASON/CONCRETE FINISHER25.909.0234.92
CARPENTER22.596.9129.50
HeavyHighway
CA20260004 rev 3 · 05/21/2026 · 139 classifications
ClassificationBase rateFringeTotal
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (2) DEL NORTE, HUMBOLDT, LAKE COUNTIES64.5625.0789.63
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (1) MENDOCINO COUNTY64.5625.0789.63
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT)35.3112.7548.06
MARBLE FINISHER42.0619.8061.86
MARBLE MASON61.7230.3192.03
BRICKLAYER SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE (B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE57.0228.5085.52
TERRAZZO WORKER/SETTER60.5829.7990.37
TERRAZZO FINISHER44.9320.9865.91
TILE LAYER LAKE & MENDOCINO COUNTIES56.7922.5479.33
TILE LAYER DEL NORTE & HUMBOLDT COUNTIES59.9222.6282.54
TILE FINISHER LAKE & MENDOCINO COUNTIES35.7819.2355.01
TILE FINISHER DEL NORTE & HUMBOLDT COUNTIES37.7519.2857.03
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT59.5134.6994.20
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT64.5134.6999.20
HIGHEST RATE FOR THAT SHIFT103.6234.69138.31
HIGHEST RATE FOR THAT SHIFT59.5134.6994.20
HIGHEST RATE FOR THAT SHIFT60.5134.6995.20
DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT54.1034.6988.79
PILEDRIVER54.1034.6988.79
CARPENTERS: MILLWRIGHT (DEL NORTE, HUMBOLDT, LAKE AND MENDOCINO COUNTIES)50.1233.0883.20
CARPENTERS: JOURNEYMAN CARPENTER DEL NORTE, HUMBOLDT, LAKE AND MENDOCINO COUNTIES47.6231.4979.11
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER DEL NORTE, HUMBOLDT, LAKE AND MENDOCINO COUNTIES47.7731.4979.26
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER DEL NORTE, HUMBOLDT, LAKE AND MENDOCINO COUNTIES54.8531.4986.34
ELECTRICIAN LAKE AND MENDOCINO COUNTIES TUNNEL WORK: ADD $0.50 PER HOUR59.1732.0491.21
ELECTRICIANS DEL NORTE AND HUMBOLDT COUNTIES TUNNEL WORK: ADD $0.50 PER HOUR59.1732.0491.21
LINE CONSTRUCTION: (3) GROUNDMAN HUMBOLDT, LAKE AND MENDOCINO COUNTIES HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY40.7621.7662.52
LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE EQUIPMENT) HUMBOLDT, LAKE AND MENDOCINO COUNTIES HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY53.3022.2675.56
LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER HUMBOLDT, LAKE AND MENDOCINO COUNTIES HOLIDAYS NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY70.1624.7194.87
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Truck Crane Oiler - AREA 1: GROUP 3: Derrick barge pedestal mounted under 45 tons; Self- propelled boom-type lifting device 45 tons and under; Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional45.1231.1576.27
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Truck Crane Oiler - AREA 1: GROUP 2: Derrick barge pedestal mounted 45 tons to and including 100 tons; Clamshell up to and including 7 cu. yds.; Self-propelled boom-type lifting device over 45 tons; Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional45.4131.1576.56
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Truck Crane OIler - AREA 1: GROUP 1: Derrick barge pedestal mounted over 100 tons; Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional45.6631.1576.81
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Oiler - AREA 1 :GROUP 3: Derrick barge pedestal mounted under 45 tons; Self- propelled boom-type lifting device 45 tons and under; Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional42.8931.1574.04
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Oiler - AREA 1: GROUP 2: Derrick barge pedestal mounted 45 tons to and including 100 tons; Clamshell up to and including 7 cu. yds.; Self-propelled boom-type lifting device over 45 tons; Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional43.1131.1574.26
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Oiler - AREA 1: GROUP 1: Derrick barge pedestal mounted over 100 tons; Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional43.3831.1574.53
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 3: Derrick barge pedestal mounted under 45 tons; Self- propelled boom-type lifting device 45 tons and under; Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under. FOOTNOTE Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional49.1431.1580.29
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 2: Derrick barge pedestal mounted 45 tons to and including 100 tons; Clamshell up to and including 7 cu. yds.; Self-propelled boom-type lifting device over 45 tons; Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional50.8231.1581.97
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 1: Derrick barge pedestal mounted over 100 tons; Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional52.6431.1583.79
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 6: DECKHAND; FIRE TENDER FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional42.5031.1573.65
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA : GROUP 5: DECK ENGINEER FOOTNOTE Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional44.7331.1575.88
OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 4: Assistant operator in lieu of assistant to engineer; Forklift, 10 tons and over; Heavy-duty repairperson/welder FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional47.3731.1578.52
AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder58.0932.5390.62
slurry mixer cleaner; Grouting Machine operator; Motorman. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder59.2332.5391.76
WORK - AREA 1: UNDERGROUND: GROUP 3: Drill doctor; Mine or shaft hoist. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder60.3732.5392.90
slusher and motor operator; Concrete pump or pumpcrete gun; Power jumbo operator. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder61.7032.5394.23
$2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder65.4332.5397.96
(rubber tired, rail or track type); Raised bore operator (tunnels); Tunnel mole bore operator FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder62.9632.5395.49
compressor (gunite); Compressor operator; Oiler; Pump operator; Slusher operator. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder58.1932.5390.72
Combination slurry mixer cleaner; Grouting Machine operator; Motorman. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder59.3332.5391.86
WORK - AREA 1: SHAFTS, STOPES, RAISES: GROUP 3 Drill doctor; Mine or shaft hoist. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder60.4732.5393.00
Combination slusher and motor operator; Concrete pump or pumpcrete gun; Power jumbo operator FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder61.8032.5394.33
WORK - AREA 1: SHAFTS, STOPES, RAISES: GROUP 1-A Tunnel bore machine operator, 20' diameter or more FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder65.5332.5398.06
Raised bore operator (tunnels); Tunnel mole bore operator. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder63.0632.5395.59
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, Hydraulic - AREA 1: GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional60.6132.5393.14
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, Cranes - AREA 1: GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional65.5632.5398.09
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, OILER - AREA 1: GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional43.2331.1574.38
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, TRUCK CRANE OILER - AREA 1: GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional45.4631.1576.61
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, CRANES - AREA 1: GROUP 5: Boom cat. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional62.2432.5394.77
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, CRANES - AREA 1: GROUP 4: Chicago boom; Forklift, 10 tons and over; Heavy-duty repair person/welder FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional63.5432.5396.07
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, CRANES - AREA 1: GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional67.0432.5399.57
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, OILER - AREA 1: GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional43.4531.1574.60
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, TRUCK CRANE OILER - AREA 1: GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional45.7331.1576.88
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, CRANES - AREA 1: GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self- propelled boom-type lifting device over 100 tons. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional68.8132.53101.34
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, OILER - AREA 1: GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self- propelled boom-type lifting device over 100 tons. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional43.7231.1574.87
OPERATOR: POWER EQUIPMENT, STEEL ERECTION, TRUCK CRANE OILER - AREA 1: GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self- propelled boom-type lifting device over 100 tons. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional45.9531.1577.10
lifting device, Manitex or similar (boom truck) - under 15 tons; FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder61.3032.5393.83
tons and under; Self-propelled boom-type lifting device 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder64.3432.5396.87
under; Self-propelled boom-type lifting device 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder44.4431.1575.59
under; Self-propelled boom-type lifting device 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder42.5531.1573.70
tons and under; Self-propelled boom-type lifting device 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder44.8331.1575.98
Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder66.0832.5398.61
Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder42.8331.1573.98
Self-propelled boom-type lifting device, over 45 tons; Tower crane. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder45.0731.1576.22
AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder68.5932.53101.12
AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder43.7931.1574.94
AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder46.0831.1577.23
attachments); Mini excavator under 25 H.P (backhoe-trencher); Tub grinder wood chipper FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder55.4932.5388.02
Welding machine (powered other than by electricity). FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder57.7032.5390.23
Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder58.8432.5391.37
AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder59.9832.5392.51
Trenching machine, maximum digging capacity over 5 ft. depth; Vermeer T-600B rock cutter or similar FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder61.3032.5393.83
AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder62.5732.5395.10
excavator (up to and including 750 cu. yds. per hour). FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder63.9532.5396.48
(finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds. m.r.c.. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder65.4332.5397.96
AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder66.9632.5399.49
AREA 2 AS NOTED DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder49.6428.5678.20
AREA 2 AS NOTED DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder47.6428.5676.20
AREA 2 AS NOTED DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder54.2528.5682.81
AREA 2 AS NOTED DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder52.2528.5680.81
AREA 2 AS NOTED DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder57.8528.5686.41
AREA 2 AS NOTED DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder55.8528.5684.41
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL (DEL NORTE COUNTY) PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB. $4.00 additional per hour at the following locations:Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center. $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S Coast Guard Station - Two Rock43.7534.4578.20
IRONWORKERS: FENCE ERECTOR DEL NORTE COUNTY PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations:Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center. $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock45.7826.5172.29
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL (HUMBOLDT, LAKE AND MENDOCINO COUNTIES). PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S Naval Air Facility - Sealey, Vandenberg AFB. $4.00 additional per hour at the following locations:Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center. $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock50.7035.1585.85
IRONWORKERS: FENCE ERECTOR (HUMBOLDT, LAKE AND MENDOCINO COUNTIES). PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB. $4.00 additional per hour at the following locations:Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center. $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S Coast Guard Station - Two Rock45.7826.5172.29
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2- CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA,MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, STANISLAUS, AND TUOLUMNE COUNTIES. ASBESTOS REMOVAL-SCOPE OF WORK Site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations38.1530.0368.18
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1- ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES ASBESTOS REMOVAL-SCOPE OF WORK: Site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations39.1530.0369.18
LABORER: MASON TENDER-BRICK MARIN COUNTY FOOTNOTE: REFRACTORY WORK WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL37.5425.5563.09
LABORER (TRAFFIC CONTROL/LANE CLOSURE): TRAFFIC CONTROL PERSON II: INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES34.0627.3061.36
LABORER (TRAFFIC CONTROL/LANE CLOSURE): TRAFFIC CONTROL PERSON I: LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES36.5627.3063.86
LABORER (TRAFFIC CONTROL/LANE CLOSURE): ESCORT DRIVER, FLAG PERSON DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES36.2627.3063.56
LABORERS:, WRECKING: GROUP 2: Semi-skilled wrecker (salvaging of other building materials) FOOTNOTES LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL35.3527.3062.65
LABORERS:, WRECKING: GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) $0.25 PER HOUR ADDITIONAL35.5027.3062.80
LABORERS:, GUNITE: GROUP 4: GUNITE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL35.2527.3062.55
LABORERS:, GUNITE: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. .$ 35.96 27.30 LABORERS:, GUNITE: GROUP 1: STRUCTURAL NOZZLEMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL36.4627.3063.76
LABORERS:, GUNITE: GROUP 3: REBOUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL35.3727.3062.67
BE USED IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION"". FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL28.9427.3056.24
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3 CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL35.2527.3062.55
INCHES FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL35.3527.3062.65
STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) $0.25 PER HOUR ADDITIONAL35.5027.3062.80
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-F WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) $0.25 PER HOUR ADDITIONAL36.0827.3063.38
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL36.0527.3063.35
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL35.5527.3062.85
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER35.7227.3063.02
WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED36.2027.3063.50
LANDSCAPE LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS (New Construction) FOOTNOTES LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL35.2527.3062.55
LANDSCAPE LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS (Establishment Warranty Period) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL28.9427.3056.24
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST (DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES).$ 46.41 27.72 TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES)44.4227.7272.14
TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD) (DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES)44.9627.7272.68
POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER - POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE (DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES)45.4127.7273.13
TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES)45.6627.7273.38
LABORER: MASON TENDER-BRICK (DEL NORTE, HUMBOLDT, LAKE, MENDOCINO, NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: REFRACTORY WORK WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL36.8426.2463.08
PAINTERS (LAKE AND MENDOCINO COUNTIES)53.3828.0481.42
PAINTERS: SANDBLASTER, SPRAY, STRUCTURAL STEEL & SWING STAGE (DEL NORTE AND HUMBOLDT COUNTIES)13.602.9416.54
PAINTERS: BRUSH & ROLLER (DEL NORTE AND HUMBOLDT COUNTIES)13.352.9416.29
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT SEALING35.1117.6252.73
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO PLASTIC; TAPE, TRAFFIC STRIPES AND MARKINGS40.8317.6258.45
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND INSTALLER34.7117.6252.33
CEMENT MASON/CONCRETE FINISHER32.1523.2755.42
PLUMBER: Work on wooden frame structures 5 stories or less excluding high-rise buildings and commercial work such as hospitals, prisons, hotels, schools, casinos, wastewater treatment plants, and research facilities as well as refrigeration pipefitting, service and repair work - MARKET RECOVERY RATE (LAKE AND MENDOCINO COUNTIES)69.7046.38116.08
PLUMBER: ALL OTHER WORK - NEW CONSTRUCTION RATE (LAKE AND MENDOCINO COUNTIES)91.0049.40140.40
LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTLIITY FITTER LAKE AND MENDOCINO COUNTIES77.3536.53113.88
UNDERGROUND UTILITY WORKER: LANDSCAPE FITTER (DEL NORTE AND HUMBOLDT COUNTIES)36.0118.5054.51
SHEET METAL WORKER (MECHANICAL CONTRACTS $200,000 OR LESS)55.9245.29101.21
SHEET METAL WORKER (ALL OTHER WORK)64.0646.83110.89
TRUCK DRIVERS: GROUP 5: DUMP TRUCKS, 65 YDS. AND OVER; HOLLAND HAULER; LOW BED HEAVY DUTY TRANSPORT OVER 7 AXLES. FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED44.5634.2878.84
TRUCK DRIVERS: GROUP 4: DUMP TRUCKS, OVER 25 YDS AND UNDER 65 YDS.; WATER PULLS - DW 10'S, 20'S, 21'S AND OTHER SIMILAR EQUIPMENT WHEN PULLING AQUA/PAK OR WATER TANK TRAILERS; HELICOPTER PILOTS (WHEN TRANSPORTING MEN AND MATERIALS); LOWBEDK HEAVY DUTY TRANSPORT UP TO INCLUDING 7 AXLES; DW10'S, 20'S, 21'S AND OTHER SIMILAR CAT TYPE, TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR GREASE TANK TRAILERS OR OTHER MISCELLANEOUS TRAILERS; VACUUM TRUCKS 7500 GALS AND OVER AND TRUCK REPAIRMAN FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED44.2134.2878.49
GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL TRAILERS; LOWBED HEAVY DUTY TRANSPORT; HEAVY DUTY TRANSPORT TILLER PERSON; SELF- PROPELLED STREET SWEEPER WITH SELF-CONTAINED REFUSE BIN; BOOM TRUCK - HYDRO-LIFT OR SWEDISH TYPE EXTENSION OR RETRACTING CRANE; P.B. OR SIMILAR TYPE SELF-LOADING TRUCK; TIRE REPAIRPERSON; COMBINATION BOOTPERSON AND ROAD OILER; DRY DISTRIBUTION TRUCK (A BOOTPERSON WHEN EMPLOYED ON SUCH EQUIPMENT, SHALL RECEIVE THE RATE SPECIFIED FOR THE CLASSIFICATION OF ROAD OIL TRUCKS OR BOOTPERSON); AMMONIA NITRATE DISTRIBUTOR, DRIVER AND MIXER; SNOW GO AND/OR PLOW FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED43.8634.2878.14
TRUCK DRIVERS: GROUP 2: DUMP TRUCKS, 6 YDS. AND UNDER 8 YDS.; TRANSIT MIXERS, THROUGH 10 YDS.; WATER TRUCKS, UNDER 7,000 GALS.; JETTING TRUCKS, UNDER 7,000 GALS.; SINGLE-UNIT FLAT RACK (3-AXLE UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; RUBBER-TIRED MUCK CAR (NOT SELF-LOADED); RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND ""A"" FRAME DRIVERS; COMBINATION WINCH TRUCK WITH HOIST; ROAD OIL TRUCK OR BOOTPERSON; BUGGYMOBILE; ROSS, HYSTER AND SIMILAR STRADDLE CARRIERS; SMALL RUBBER-TIRED TRACTOR FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED43.5634.2877.84
TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK (2- AXLE UNIT); NIPPER TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP MACHINE; FORK LIFT AND LIFT JITNEYS; FUEL AND/OR GREASE TRUCK DRIVER OR FUEL PERSON; SNOW BUGGY; STEAM CLEANING; BUS OR PERSONHAUL DRIVER; ESCORT OR PILOT CAR DRIVER; PICKUP TRUCK; TEAMSTER OILER/GREASER AND/OR SERVICEPERSON; HOOK TENDER (INCLUDING LOADING AND UNLOADING); TEAM DRIVER; TOOL ROOM ATTENDANT (REFINERIES) FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED43.2634.2877.54
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.