| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (2) DEL NORTE, HUMBOLDT, LAKE COUNTIES | 64.56 | 25.07 | 89.63 |
| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (1) MENDOCINO COUNTY | 64.56 | 25.07 | 89.63 |
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | 35.31 | 12.75 | 48.06 |
| MARBLE FINISHER | 42.06 | 19.80 | 61.86 |
| MARBLE MASON | 61.72 | 30.31 | 92.03 |
| BRICKLAYER SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE (B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE | 57.02 | 28.50 | 85.52 |
| TERRAZZO WORKER/SETTER | 60.58 | 29.79 | 90.37 |
| TERRAZZO FINISHER | 44.93 | 20.98 | 65.91 |
| TILE LAYER LAKE & MENDOCINO COUNTIES | 56.79 | 22.54 | 79.33 |
| TILE LAYER DEL NORTE & HUMBOLDT COUNTIES | 59.92 | 22.62 | 82.54 |
| TILE FINISHER LAKE & MENDOCINO COUNTIES | 35.78 | 19.23 | 55.01 |
| TILE FINISHER DEL NORTE & HUMBOLDT COUNTIES | 37.75 | 19.28 | 57.03 |
| DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT | 59.51 | 34.69 | 94.20 |
| DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT | 64.51 | 34.69 | 99.20 |
| HIGHEST RATE FOR THAT SHIFT | 103.62 | 34.69 | 138.31 |
| HIGHEST RATE FOR THAT SHIFT | 59.51 | 34.69 | 94.20 |
| HIGHEST RATE FOR THAT SHIFT | 60.51 | 34.69 | 95.20 |
| DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT | 54.10 | 34.69 | 88.79 |
| PILEDRIVER | 54.10 | 34.69 | 88.79 |
| CARPENTERS: MILLWRIGHT (DEL NORTE, HUMBOLDT, LAKE AND MENDOCINO COUNTIES) | 50.12 | 33.08 | 83.20 |
| CARPENTERS: JOURNEYMAN CARPENTER DEL NORTE, HUMBOLDT, LAKE AND MENDOCINO COUNTIES | 47.62 | 31.49 | 79.11 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER DEL NORTE, HUMBOLDT, LAKE AND MENDOCINO COUNTIES | 47.77 | 31.49 | 79.26 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER DEL NORTE, HUMBOLDT, LAKE AND MENDOCINO COUNTIES | 54.85 | 31.49 | 86.34 |
| ELECTRICIAN LAKE AND MENDOCINO COUNTIES TUNNEL WORK: ADD $0.50 PER HOUR | 59.17 | 32.04 | 91.21 |
| ELECTRICIANS DEL NORTE AND HUMBOLDT COUNTIES TUNNEL WORK: ADD $0.50 PER HOUR | 59.17 | 32.04 | 91.21 |
| LINE CONSTRUCTION: (3) GROUNDMAN HUMBOLDT, LAKE AND MENDOCINO COUNTIES HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY | 40.76 | 21.76 | 62.52 |
| LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE EQUIPMENT) HUMBOLDT, LAKE AND MENDOCINO COUNTIES HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY | 53.30 | 22.26 | 75.56 |
| LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER HUMBOLDT, LAKE AND MENDOCINO COUNTIES HOLIDAYS NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY | 70.16 | 24.71 | 94.87 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Truck Crane Oiler - AREA 1: GROUP 3: Derrick barge pedestal mounted under 45 tons; Self- propelled boom-type lifting device 45 tons and under; Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 45.12 | 31.15 | 76.27 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Truck Crane Oiler - AREA 1: GROUP 2: Derrick barge pedestal mounted 45 tons to and including 100 tons; Clamshell up to and including 7 cu. yds.; Self-propelled boom-type lifting device over 45 tons; Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 45.41 | 31.15 | 76.56 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Truck Crane OIler - AREA 1: GROUP 1: Derrick barge pedestal mounted over 100 tons; Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 45.66 | 31.15 | 76.81 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Oiler - AREA 1 :GROUP 3: Derrick barge pedestal mounted under 45 tons; Self- propelled boom-type lifting device 45 tons and under; Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 42.89 | 31.15 | 74.04 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Oiler - AREA 1: GROUP 2: Derrick barge pedestal mounted 45 tons to and including 100 tons; Clamshell up to and including 7 cu. yds.; Self-propelled boom-type lifting device over 45 tons; Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 43.11 | 31.15 | 74.26 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Oiler - AREA 1: GROUP 1: Derrick barge pedestal mounted over 100 tons; Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 43.38 | 31.15 | 74.53 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 3: Derrick barge pedestal mounted under 45 tons; Self- propelled boom-type lifting device 45 tons and under; Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under. FOOTNOTE Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 49.14 | 31.15 | 80.29 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 2: Derrick barge pedestal mounted 45 tons to and including 100 tons; Clamshell up to and including 7 cu. yds.; Self-propelled boom-type lifting device over 45 tons; Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 50.82 | 31.15 | 81.97 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 1: Derrick barge pedestal mounted over 100 tons; Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 52.64 | 31.15 | 83.79 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 6: DECKHAND; FIRE TENDER FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 42.50 | 31.15 | 73.65 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA : GROUP 5: DECK ENGINEER FOOTNOTE Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 44.73 | 31.15 | 75.88 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING, Lifting Devices - AREA 1: GROUP 4: Assistant operator in lieu of assistant to engineer; Forklift, 10 tons and over; Heavy-duty repairperson/welder FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 47.37 | 31.15 | 78.52 |
| AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 58.09 | 32.53 | 90.62 |
| slurry mixer cleaner; Grouting Machine operator; Motorman. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 59.23 | 32.53 | 91.76 |
| WORK - AREA 1: UNDERGROUND: GROUP 3: Drill doctor; Mine or shaft hoist. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 60.37 | 32.53 | 92.90 |
| slusher and motor operator; Concrete pump or pumpcrete gun; Power jumbo operator. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 61.70 | 32.53 | 94.23 |
| $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 65.43 | 32.53 | 97.96 |
| (rubber tired, rail or track type); Raised bore operator (tunnels); Tunnel mole bore operator FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 62.96 | 32.53 | 95.49 |
| compressor (gunite); Compressor operator; Oiler; Pump operator; Slusher operator. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 58.19 | 32.53 | 90.72 |
| Combination slurry mixer cleaner; Grouting Machine operator; Motorman. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 59.33 | 32.53 | 91.86 |
| WORK - AREA 1: SHAFTS, STOPES, RAISES: GROUP 3 Drill doctor; Mine or shaft hoist. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 60.47 | 32.53 | 93.00 |
| Combination slusher and motor operator; Concrete pump or pumpcrete gun; Power jumbo operator FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 61.80 | 32.53 | 94.33 |
| WORK - AREA 1: SHAFTS, STOPES, RAISES: GROUP 1-A Tunnel bore machine operator, 20' diameter or more FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 65.53 | 32.53 | 98.06 |
| Raised bore operator (tunnels); Tunnel mole bore operator. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 63.06 | 32.53 | 95.59 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION, Hydraulic - AREA 1: GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 60.61 | 32.53 | 93.14 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION, Cranes - AREA 1: GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 65.56 | 32.53 | 98.09 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION, OILER - AREA 1: GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 43.23 | 31.15 | 74.38 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION, TRUCK CRANE OILER - AREA 1: GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 45.46 | 31.15 | 76.61 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION, CRANES - AREA 1: GROUP 5: Boom cat. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 62.24 | 32.53 | 94.77 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION, CRANES - AREA 1: GROUP 4: Chicago boom; Forklift, 10 tons and over; Heavy-duty repair person/welder FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 63.54 | 32.53 | 96.07 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION, CRANES - AREA 1: GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 67.04 | 32.53 | 99.57 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION, OILER - AREA 1: GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 43.45 | 31.15 | 74.60 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION, TRUCK CRANE OILER - AREA 1: GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 45.73 | 31.15 | 76.88 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION, CRANES - AREA 1: GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self- propelled boom-type lifting device over 100 tons. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 68.81 | 32.53 | 101.34 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION, OILER - AREA 1: GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self- propelled boom-type lifting device over 100 tons. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 43.72 | 31.15 | 74.87 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION, TRUCK CRANE OILER - AREA 1: GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self- propelled boom-type lifting device over 100 tons. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional | 45.95 | 31.15 | 77.10 |
| lifting device, Manitex or similar (boom truck) - under 15 tons; FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 61.30 | 32.53 | 93.83 |
| tons and under; Self-propelled boom-type lifting device 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 64.34 | 32.53 | 96.87 |
| under; Self-propelled boom-type lifting device 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 44.44 | 31.15 | 75.59 |
| under; Self-propelled boom-type lifting device 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 42.55 | 31.15 | 73.70 |
| tons and under; Self-propelled boom-type lifting device 45 tons and under. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 44.83 | 31.15 | 75.98 |
| Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 66.08 | 32.53 | 98.61 |
| Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 42.83 | 31.15 | 73.98 |
| Self-propelled boom-type lifting device, over 45 tons; Tower crane. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 45.07 | 31.15 | 76.22 |
| AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 68.59 | 32.53 | 101.12 |
| AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 43.79 | 31.15 | 74.94 |
| AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 46.08 | 31.15 | 77.23 |
| attachments); Mini excavator under 25 H.P (backhoe-trencher); Tub grinder wood chipper FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 55.49 | 32.53 | 88.02 |
| Welding machine (powered other than by electricity). FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 57.70 | 32.53 | 90.23 |
| Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 58.84 | 32.53 | 91.37 |
| AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 59.98 | 32.53 | 92.51 |
| Trenching machine, maximum digging capacity over 5 ft. depth; Vermeer T-600B rock cutter or similar FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 61.30 | 32.53 | 93.83 |
| AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 62.57 | 32.53 | 95.10 |
| excavator (up to and including 750 cu. yds. per hour). FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 63.95 | 32.53 | 96.48 |
| (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds. m.r.c.. FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. ""AREA 1"" WAGE RATES ARE LISTED.""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. AREA 1: DEL NORTE, HUMBOLDT, LAKE, MENDOCINO. AREA 2 -NOTED BELOW. THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 65.43 | 32.53 | 97.96 |
| AREA 2 AS NOTED BELOW DEL NORTE Area 1: Extreme Southwest Area 2 HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 66.96 | 32.53 | 99.49 |
| AREA 2 AS NOTED DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 49.64 | 28.56 | 78.20 |
| AREA 2 AS NOTED DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 47.64 | 28.56 | 76.20 |
| AREA 2 AS NOTED DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 54.25 | 28.56 | 82.81 |
| AREA 2 AS NOTED DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 52.25 | 28.56 | 80.81 |
| AREA 2 AS NOTED DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 57.85 | 28.56 | 86.41 |
| AREA 2 AS NOTED DEL NORTE Area 1: Extreme Southwestern Area 2: Remainder HUMBOLDT Area 1: Except Eastern and Southwestern Area 2 LAKE Area 1: Southern Area 2 MENDOCINO Area 1: Central and Southeastern Area 2: Remainder | 55.85 | 28.56 | 84.41 |
| IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL (DEL NORTE COUNTY) PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB. $4.00 additional per hour at the following locations:Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center. $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S Coast Guard Station - Two Rock | 43.75 | 34.45 | 78.20 |
| IRONWORKERS: FENCE ERECTOR DEL NORTE COUNTY PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations:Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center. $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock | 45.78 | 26.51 | 72.29 |
| IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL (HUMBOLDT, LAKE AND MENDOCINO COUNTIES). PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S Naval Air Facility - Sealey, Vandenberg AFB. $4.00 additional per hour at the following locations:Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center. $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock | 50.70 | 35.15 | 85.85 |
| IRONWORKERS: FENCE ERECTOR (HUMBOLDT, LAKE AND MENDOCINO COUNTIES). PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB. $4.00 additional per hour at the following locations:Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center. $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S Coast Guard Station - Two Rock | 45.78 | 26.51 | 72.29 |
| LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2- CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA,MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, STANISLAUS, AND TUOLUMNE COUNTIES. ASBESTOS REMOVAL-SCOPE OF WORK Site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations | 38.15 | 30.03 | 68.18 |
| LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1- ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES ASBESTOS REMOVAL-SCOPE OF WORK: Site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations | 39.15 | 30.03 | 69.18 |
| LABORER: MASON TENDER-BRICK MARIN COUNTY FOOTNOTE: REFRACTORY WORK WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL | 37.54 | 25.55 | 63.09 |
| LABORER (TRAFFIC CONTROL/LANE CLOSURE): TRAFFIC CONTROL PERSON II: INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES | 34.06 | 27.30 | 61.36 |
| LABORER (TRAFFIC CONTROL/LANE CLOSURE): TRAFFIC CONTROL PERSON I: LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES | 36.56 | 27.30 | 63.86 |
| LABORER (TRAFFIC CONTROL/LANE CLOSURE): ESCORT DRIVER, FLAG PERSON DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES | 36.26 | 27.30 | 63.56 |
| LABORERS:, WRECKING: GROUP 2: Semi-skilled wrecker (salvaging of other building materials) FOOTNOTES LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | 35.35 | 27.30 | 62.65 |
| LABORERS:, WRECKING: GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) $0.25 PER HOUR ADDITIONAL | 35.50 | 27.30 | 62.80 |
| LABORERS:, GUNITE: GROUP 4: GUNITE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | 35.25 | 27.30 | 62.55 |
| LABORERS:, GUNITE: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. .$ 35.96 27.30 LABORERS:, GUNITE: GROUP 1: STRUCTURAL NOZZLEMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | 36.46 | 27.30 | 63.76 |
| LABORERS:, GUNITE: GROUP 3: REBOUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | 35.37 | 27.30 | 62.67 |
| BE USED IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION"". FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | 28.94 | 27.30 | 56.24 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3 CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | 35.25 | 27.30 | 62.55 |
| INCHES FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | 35.35 | 27.30 | 62.65 |
| STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) $0.25 PER HOUR ADDITIONAL | 35.50 | 27.30 | 62.80 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-F WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A) $0.25 PER HOUR ADDITIONAL | 36.08 | 27.30 | 63.38 |
| WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | 36.05 | 27.30 | 63.35 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | 35.55 | 27.30 | 62.85 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER | 35.72 | 27.30 | 63.02 |
| WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | 36.20 | 27.30 | 63.50 |
| LANDSCAPE LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS (New Construction) FOOTNOTES LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | 35.25 | 27.30 | 62.55 |
| LANDSCAPE LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS (Establishment Warranty Period) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | 28.94 | 27.30 | 56.24 |
| TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST (DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES).$ 46.41 27.72 TUNNEL AND SHAFT LABORERS: GROUP 5- GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES) | 44.42 | 27.72 | 72.14 |
| TUNNEL AND SHAFT LABORERS: GROUP 4- VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD) (DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES) | 44.96 | 27.72 | 72.68 |
| POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER - POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE (DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES) | 45.41 | 27.72 | 73.13 |
| TUNNEL AND SHAFT LABORERS: GROUP 2- RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES) | 45.66 | 27.72 | 73.38 |
| LABORER: MASON TENDER-BRICK (DEL NORTE, HUMBOLDT, LAKE, MENDOCINO, NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTE: REFRACTORY WORK WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL | 36.84 | 26.24 | 63.08 |
| PAINTERS (LAKE AND MENDOCINO COUNTIES) | 53.38 | 28.04 | 81.42 |
| PAINTERS: SANDBLASTER, SPRAY, STRUCTURAL STEEL & SWING STAGE (DEL NORTE AND HUMBOLDT COUNTIES) | 13.60 | 2.94 | 16.54 |
| PAINTERS: BRUSH & ROLLER (DEL NORTE AND HUMBOLDT COUNTIES) | 13.35 | 2.94 | 16.29 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT SEALING | 35.11 | 17.62 | 52.73 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO PLASTIC; TAPE, TRAFFIC STRIPES AND MARKINGS | 40.83 | 17.62 | 58.45 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND INSTALLER | 34.71 | 17.62 | 52.33 |
| CEMENT MASON/CONCRETE FINISHER | 32.15 | 23.27 | 55.42 |
| PLUMBER: Work on wooden frame structures 5 stories or less excluding high-rise buildings and commercial work such as hospitals, prisons, hotels, schools, casinos, wastewater treatment plants, and research facilities as well as refrigeration pipefitting, service and repair work - MARKET RECOVERY RATE (LAKE AND MENDOCINO COUNTIES) | 69.70 | 46.38 | 116.08 |
| PLUMBER: ALL OTHER WORK - NEW CONSTRUCTION RATE (LAKE AND MENDOCINO COUNTIES) | 91.00 | 49.40 | 140.40 |
| LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTLIITY FITTER LAKE AND MENDOCINO COUNTIES | 77.35 | 36.53 | 113.88 |
| UNDERGROUND UTILITY WORKER: LANDSCAPE FITTER (DEL NORTE AND HUMBOLDT COUNTIES) | 36.01 | 18.50 | 54.51 |
| SHEET METAL WORKER (MECHANICAL CONTRACTS $200,000 OR LESS) | 55.92 | 45.29 | 101.21 |
| SHEET METAL WORKER (ALL OTHER WORK) | 64.06 | 46.83 | 110.89 |
| TRUCK DRIVERS: GROUP 5: DUMP TRUCKS, 65 YDS. AND OVER; HOLLAND HAULER; LOW BED HEAVY DUTY TRANSPORT OVER 7 AXLES. FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED | 44.56 | 34.28 | 78.84 |
| TRUCK DRIVERS: GROUP 4: DUMP TRUCKS, OVER 25 YDS AND UNDER 65 YDS.; WATER PULLS - DW 10'S, 20'S, 21'S AND OTHER SIMILAR EQUIPMENT WHEN PULLING AQUA/PAK OR WATER TANK TRAILERS; HELICOPTER PILOTS (WHEN TRANSPORTING MEN AND MATERIALS); LOWBEDK HEAVY DUTY TRANSPORT UP TO INCLUDING 7 AXLES; DW10'S, 20'S, 21'S AND OTHER SIMILAR CAT TYPE, TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR GREASE TANK TRAILERS OR OTHER MISCELLANEOUS TRAILERS; VACUUM TRUCKS 7500 GALS AND OVER AND TRUCK REPAIRMAN FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED | 44.21 | 34.28 | 78.49 |
| GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL TRAILERS; LOWBED HEAVY DUTY TRANSPORT; HEAVY DUTY TRANSPORT TILLER PERSON; SELF- PROPELLED STREET SWEEPER WITH SELF-CONTAINED REFUSE BIN; BOOM TRUCK - HYDRO-LIFT OR SWEDISH TYPE EXTENSION OR RETRACTING CRANE; P.B. OR SIMILAR TYPE SELF-LOADING TRUCK; TIRE REPAIRPERSON; COMBINATION BOOTPERSON AND ROAD OILER; DRY DISTRIBUTION TRUCK (A BOOTPERSON WHEN EMPLOYED ON SUCH EQUIPMENT, SHALL RECEIVE THE RATE SPECIFIED FOR THE CLASSIFICATION OF ROAD OIL TRUCKS OR BOOTPERSON); AMMONIA NITRATE DISTRIBUTOR, DRIVER AND MIXER; SNOW GO AND/OR PLOW FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED | 43.86 | 34.28 | 78.14 |
| TRUCK DRIVERS: GROUP 2: DUMP TRUCKS, 6 YDS. AND UNDER 8 YDS.; TRANSIT MIXERS, THROUGH 10 YDS.; WATER TRUCKS, UNDER 7,000 GALS.; JETTING TRUCKS, UNDER 7,000 GALS.; SINGLE-UNIT FLAT RACK (3-AXLE UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; RUBBER-TIRED MUCK CAR (NOT SELF-LOADED); RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND ""A"" FRAME DRIVERS; COMBINATION WINCH TRUCK WITH HOIST; ROAD OIL TRUCK OR BOOTPERSON; BUGGYMOBILE; ROSS, HYSTER AND SIMILAR STRADDLE CARRIERS; SMALL RUBBER-TIRED TRACTOR FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED | 43.56 | 34.28 | 77.84 |
| TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK (2- AXLE UNIT); NIPPER TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP MACHINE; FORK LIFT AND LIFT JITNEYS; FUEL AND/OR GREASE TRUCK DRIVER OR FUEL PERSON; SNOW BUGGY; STEAM CLEANING; BUS OR PERSONHAUL DRIVER; ESCORT OR PILOT CAR DRIVER; PICKUP TRUCK; TEAMSTER OILER/GREASER AND/OR SERVICEPERSON; HOOK TENDER (INCLUDING LOADING AND UNLOADING); TEAM DRIVER; TOOL ROOM ATTENDANT (REFINERIES) FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE RATE. HEATER PLANER; ASPHALT BURNER; SCARIFIER BURNER; INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND CLEAN-UP TRUCK: USE APPROPRIATE RATE FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED | 43.26 | 34.28 | 77.54 |