| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 34.21 | 23.92 | 58.13 |
| PAINTER (BRUSH, ROLLER AND SPRAY) | 16.25 | 10.42 | 26.67 |
| PIPEFITTER | 34.41 | 15.70 | 50.11 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | 26.99 | 15.67 | 42.66 |
| TRUCK DRIVER: DUMP TRUCK | 13.54 | 0.23 | 13.77 |
| ROOFER | 15.39 | — | 15.39 |
| PLUMBER | 21.26 | 4.20 | 25.46 |
| OPERATOR: ROLLER | 14.34 | — | 14.34 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 17.79 | — | 17.79 |
| OPERATOR: GRADER/BLADE | 14.66 | — | 14.66 |
| OPERATOR: CRANE | 17.52 | — | 17.52 |
| OPERATOR: BULLDOZER | 15.88 | — | 15.88 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 22.75 | — | 22.75 |
| LABORER: PIPELAYER | 14.02 | — | 14.02 |
| LABORER: MASON TENDER - BRICK | 12.04 | — | 12.04 |
| LABORER: COMMON OR GENERAL | 10.61 | — | 10.61 |
| IRONWORKER, STRUCTURAL | 19.39 | — | 19.39 |
| IRONWORKER, REINFORCING | 14.00 | — | 14.00 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 17.16 | 4.76 | 21.92 |
| ELECTRICIAN | 18.69 | 4.17 | 22.86 |
| CEMENT MASON/CONCRETE FINISHER | 17.03 | — | 17.03 |
| CARPENTER | 17.96 | 4.81 | 22.77 |
| BRICKLAYER | 19.39 | — | 19.39 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | 11.15 | — | 11.15 |
| TILE SETTER | 9.00 | — | 9.00 |
| ROOFER | 14.87 | — | 14.87 |
| PLUMBER | 14.56 | — | 14.56 |
| PAINTER: BRUSH, ROLLER AND SPRAY | 12.06 | — | 12.06 |
| OPERATOR: BULLDOZER | 12.75 | — | 12.75 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 12.86 | — | 12.86 |
| OPERATOR: ASPHALT PAVER | 15.75 | — | 15.75 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 9.65 | — | 9.65 |
| LABORER: MASON TENDER - BRICK | 9.00 | — | 9.00 |
| LABORER: LANDSCAPE | 9.33 | — | 9.33 |
| LABORER: COMMON OR GENERAL | 9.72 | — | 9.72 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | 7.25 | — | 7.25 |
| ELECTRICIAN | 16.25 | — | 16.25 |
| CEMENT MASON/CONCRETE FINISHER | 13.16 | — | 13.16 |
| CARPENTER | 11.22 | — | 11.22 |
| BRICKLAYER | 17.09 | — | 17.09 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: SEMI/TRAILER TRUCK | 12.50 | — | 12.50 |
| TRUCK DRIVER: WATER TRUCK | 16.00 | — | 16.00 |
| TRUCK DRIVER: LOWBOY TRUCK | 17.67 | — | 17.67 |
| TRUCK DRIVER: FLATBED TRUCK | 21.03 | — | 21.03 |
| TRUCK DRIVER: DUMP TRUCK | 12.00 | — | 12.00 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 10.00 | — | 10.00 |
| TRAFFIC CONTROL: FLAGGER | 9.88 | — | 9.88 |
| PILEDRIVERMAN | 24.70 | — | 24.70 |
| OPERATOR: SCREED | 16.54 | — | 16.54 |
| OPERATOR: SCRAPER | 19.31 | — | 19.31 |
| OPERATOR: ROLLER | 12.50 | — | 12.50 |
| OPERATOR: POST DRIVER (GUARDRAIL/FENCES) | 16.97 | — | 16.97 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 15.05 | — | 15.05 |
| OPERATOR: OILER | 19.29 | — | 19.29 |
| OPERATOR: MILLING MACHINE | 17.52 | — | 17.52 |
| OPERATOR: MECHANIC | 18.83 | — | 18.83 |
| OPERATOR: LOADER | 16.85 | — | 16.85 |
| OPERATOR: HYDROSEEDER | 10.79 | — | 10.79 |
| OPERATOR: GRADER/BLADE | 15.00 | — | 15.00 |
| OPERATOR: DRILL | 14.85 | — | 14.85 |
| OPERATOR: CRANE | 22.84 | — | 22.84 |
| OPERATOR: BULLDOZER | 19.29 | — | 19.29 |
| OPERATOR: BROOM/SWEEPER | 12.00 | — | 12.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 16.06 | — | 16.06 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 21.64 | — | 21.64 |
| OPERATOR: ASPHALT SPREADER | 15.80 | — | 15.80 |
| LABORER: PIPELAYER | 14.56 | — | 14.56 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 12.38 | — | 12.38 |
| LABORER: COMMON OR GENERAL | 11.11 | — | 11.11 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 14.68 | — | 14.68 |
| IRONWORKER, STRUCTURAL | 22.00 | — | 22.00 |
| IRONWORKER, REINFORCING | 14.22 | — | 14.22 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | 21.75 | — | 21.75 |
| HIGHWAY/PARKING LOT STRIPING: OPERATOR (STRIPING MACHINE) | 13.74 | — | 13.74 |
| CEMENT MASON/CONCRETE FINISHER | 15.32 | — | 15.32 |
| CARPENTER, INCLUDES FORM WORK | 20.23 | — | 20.23 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (ELECTRICAL CONTRACTS UNDER $1,500,000).$ 27.80 14.69 ELECTRICIAN (ELECTRICAL CONTRACTS OVER $1,500,000) | 34.02 | 15.00 | 49.02 |
| TRUCK DRIVER: DUMP TRUCK | 14.13 | 1.90 | 16.03 |
| PAINTER (BRUSH AND ROLLER) | 18.00 | — | 18.00 |
| OPERATOR: LOADER | 15.43 | — | 15.43 |
| OPERATOR: CRANE | 24.21 | 6.79 | 31.00 |
| OPERATOR: BULLDOZER | 16.32 | 1.65 | 17.97 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 17.09 | — | 17.09 |
| LABORER: PIPELAYER | 14.16 | 2.08 | 16.24 |
| LABORER: COMMON OR GENERAL | 12.19 | 1.13 | 13.32 |
| CEMENT MASON/CONCRETE FINISHER | 16.36 | — | 16.36 |
| CARPENTER, INCLUDES FORM WORK | 17.89 | 3.27 | 21.16 |