Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 34.21 | 23.92 | 58.13 |
| MILLWRIGHT | 34.02 | 11.88 | 45.90 |
| ELECTRICIAN | 28.94 | 14.95 | 43.89 |
| PAINTER (BRUSH, ROLLER AND SPRAY) | 16.25 | 10.42 | 26.67 |
| PIPEFITTER | 34.41 | 15.70 | 50.11 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | 26.99 | 15.67 | 42.66 |
| TRUCK DRIVER: DUMP TRUCK | 13.80 | 0.71 | 14.51 |
| ROOFER | 15.39 | — | 15.39 |
| PLUMBER | 22.95 | 6.86 | 29.81 |
| OPERATOR: ROLLER | 14.34 | — | 14.34 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 17.79 | — | 17.79 |
| OPERATOR: GRADER/BLADE | 14.66 | — | 14.66 |
| OPERATOR: CRANE | 17.52 | — | 17.52 |
| OPERATOR: BULLDOZER | 16.74 | — | 16.74 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 23.17 | — | 23.17 |
| LABORER: PIPELAYER | 14.02 | — | 14.02 |
| LABORER: MASON TENDER - BRICK | 12.04 | — | 12.04 |
| LABORER: COMMON OR GENERAL | 10.80 | — | 10.80 |
| IRONWORKER, STRUCTURAL | 19.39 | — | 19.39 |
| IRONWORKER, REINFORCING | 14.00 | — | 14.00 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 17.16 | 4.76 | 21.92 |
| CEMENT MASON/CONCRETE FINISHER | 17.03 | — | 17.03 |
| CARPENTER | 15.73 | 0.55 | 16.28 |
| BRICKLAYER | 19.39 | — | 19.39 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | 11.15 | — | 11.15 |
| ROOFER | 14.87 | — | 14.87 |
| PLUMBER | 14.56 | — | 14.56 |
| PAINTER: BRUSH, ROLLER AND SPRAY | 11.25 | — | 11.25 |
| OPERATOR: BULLDOZER | 12.75 | — | 12.75 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 12.86 | — | 12.86 |
| OPERATOR: ASPHALT PAVER | 15.75 | — | 15.75 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 9.65 | — | 9.65 |
| LABORER: MASON TENDER - BRICK | 9.00 | — | 9.00 |
| LABORER: LANDSCAPE | 9.33 | — | 9.33 |
| LABORER: COMMON OR GENERAL | 9.53 | — | 9.53 |
| ELECTRICIAN | 15.13 | — | 15.13 |
| CEMENT MASON/CONCRETE FINISHER | 13.16 | — | 13.16 |
| CARPENTER | 12.20 | — | 12.20 |
| BRICKLAYER | 17.09 | — | 17.09 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: SEMI/TRAILER TRUCK | 12.50 | — | 12.50 |
| TRUCK DRIVER: WATER TRUCK | 13.17 | — | 13.17 |
| TRUCK DRIVER: LOWBOY TRUCK | 16.63 | — | 16.63 |
| TRUCK DRIVER: FLATBED TRUCK | 21.03 | — | 21.03 |
| TRUCK DRIVER: DUMP TRUCK | 13.80 | — | 13.80 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 10.50 | — | 10.50 |
| TRAFFIC CONTROL: FLAGGER | 10.00 | — | 10.00 |
| OPERATOR: TRACTOR | 10.00 | — | 10.00 |
| OPERATOR: SCREED | 15.01 | — | 15.01 |
| OPERATOR: SCRAPER | 19.31 | — | 19.31 |
| OPERATOR: ROLLER | 12.83 | — | 12.83 |
| OPERATOR: POST DRIVER (GUARDRAIL/FENCES) | 16.96 | — | 16.96 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 17.17 | — | 17.17 |
| OPERATOR: OILER | 19.29 | — | 19.29 |
| OPERATOR: MILLING MACHINE | 17.28 | — | 17.28 |
| OPERATOR: MECHANIC | 23.68 | — | 23.68 |
| OPERATOR: LOADER | 16.74 | — | 16.74 |
| OPERATOR: HYDROSEEDER | 10.79 | — | 10.79 |
| OPERATOR: GRADER/BLADE | 17.66 | — | 17.66 |
| OPERATOR: GRADE CHECKER | 14.68 | — | 14.68 |
| OPERATOR: DRILL | 14.85 | — | 14.85 |
| OPERATOR: CRANE | 22.84 | — | 22.84 |
| OPERATOR: BULLDOZER | 15.54 | — | 15.54 |
| OPERATOR: BROOM/SWEEPER | 12.00 | — | 12.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 16.06 | — | 16.06 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 14.55 | — | 14.55 |
| OPERATOR: ASPHALT SPREADER | 15.39 | — | 15.39 |
| LABORER: PIPELAYER | 14.33 | — | 14.33 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 11.15 | — | 11.15 |
| LABORER: COMMON OR GENERAL | 12.23 | — | 12.23 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 14.68 | — | 14.68 |
| IRONWORKER, STRUCTURAL | 17.46 | — | 17.46 |
| IRONWORKER, REINFORCING | 14.22 | — | 14.22 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | 21.75 | — | 21.75 |
| HIGHWAY/PARKING LOT STRIPING: OPERATOR (STRIPING MACHINE) | 13.25 | — | 13.25 |
| CEMENT MASON/CONCRETE FINISHER | 16.39 | — | 16.39 |
| CARPENTER, INCLUDES FORM WORK | 17.00 | — | 17.00 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (ELECTRICAL CONTRACTS UNDER $1,500,000).$ 27.80 14.69 ELECTRICIAN (ELECTRICAL CONTRACTS OVER $1,500,000) | 34.02 | 15.00 | 49.02 |
| TRUCK DRIVER: DUMP TRUCK | 14.13 | 1.90 | 16.03 |
| PAINTER (BRUSH AND ROLLER) | 18.00 | — | 18.00 |
| OPERATOR: LOADER | 15.43 | — | 15.43 |
| OPERATOR: CRANE | 24.21 | 6.79 | 31.00 |
| OPERATOR: BULLDOZER | 16.32 | 1.65 | 17.97 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 17.09 | — | 17.09 |
| LABORER: PIPELAYER | 14.16 | 2.08 | 16.24 |
| LABORER: COMMON OR GENERAL | 11.00 | — | 11.00 |
| CEMENT MASON/CONCRETE FINISHER | 16.36 | — | 16.36 |
| CARPENTER, INCLUDES FORM WORK | 17.89 | 3.27 | 21.16 |