Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 34.21 | 23.92 | 58.13 |
| PAINTER (SPRAY) | 16.25 | 10.42 | 26.67 |
| PIPEFITTER | 34.41 | 15.70 | 50.11 |
| TRUCK DRIVER: DUMP TRUCK | 13.92 | 0.85 | 14.77 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 20.25 2.73 ROOFER | 15.39 | — | 15.39 |
| PAINTER (BRUSH AND ROLLER) | 13.38 | — | 13.38 |
| OPERATOR: ROLLER | 14.86 | 2.18 | 17.04 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 17.79 | — | 17.79 |
| OPERATOR: GRADER/BLADE | 14.66 | — | 14.66 |
| OPERATOR: CRANE | 17.52 | — | 17.52 |
| OPERATOR: BULLDOZER | 16.74 | — | 16.74 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 19.10 | — | 19.10 |
| LABORER: PIPELAYER | 14.02 | — | 14.02 |
| LABORER: MASON TENDER - BRICK | 12.04 | — | 12.04 |
| LABORER: COMMON OR GENERAL | 13.56 | — | 13.56 |
| IRONWORKER, STRUCTURAL | 19.39 | — | 19.39 |
| IRONWORKER, REINFORCING | 14.00 | — | 14.00 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 17.16 | 4.76 | 21.92 |
| ELECTRICIAN | 19.79 | 2.45 | 22.24 |
| CEMENT MASON/CONCRETE FINISHER | 15.20 | — | 15.20 |
| CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK | 16.90 | 4.10 | 21.00 |
| BRICKLAYER | 19.39 | — | 19.39 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | 35.10 | 18.78 | 53.88 |
| TRUCK DRIVER: DUMP TRUCK | 11.15 | — | 11.15 |
| ROOFER | 14.87 | — | 14.87 |
| PLUMBER | 14.16 | — | 14.16 |
| PAINTER: BRUSH, ROLLER AND SPRAY | 11.25 | — | 11.25 |
| OPERATOR: BULLDOZER | 12.75 | — | 12.75 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 11.97 | 1.10 | 13.07 |
| OPERATOR: ASPHALT PAVER | 15.75 | — | 15.75 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 10.43 | — | 10.43 |
| LABORER: MASON TENDER - BRICK | 9.00 | — | 9.00 |
| LABORER: LANDSCAPE | 9.33 | — | 9.33 |
| LABORER: COMMON OR GENERAL | 8.00 | — | 8.00 |
| ELECTRICIAN | 15.64 | — | 15.64 |
| CARPENTER | 12.00 | — | 12.00 |
| BRICKLAYER | 17.09 | — | 17.09 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: SEMI/TRAILER TRUCK | 12.50 | — | 12.50 |
| TRUCK DRIVER: WATER TRUCK | 14.73 | — | 14.73 |
| TRUCK DRIVER: LOWBOY TRUCK | 18.61 | — | 18.61 |
| TRUCK DRIVER: FLATBED TRUCK | 21.03 | — | 21.03 |
| TRUCK DRIVER: DUMP TRUCK | 16.49 | — | 16.49 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 12.21 | — | 12.21 |
| TRAFFIC CONTROL: FLAGGER | 12.33 | — | 12.33 |
| OPERATOR: SCREED | 17.30 | — | 17.30 |
| OPERATOR: SCRAPER | 16.50 | — | 16.50 |
| OPERATOR: ROLLER | 15.25 | — | 15.25 |
| OPERATOR: POST DRIVER (GUARDRAIL/FENCES) | 16.97 | — | 16.97 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 21.54 | — | 21.54 |
| OPERATOR: OILER | 19.29 | — | 19.29 |
| OPERATOR: MILLING MACHINE | 17.73 | — | 17.73 |
| OPERATOR: MECHANIC | 19.07 | — | 19.07 |
| OPERATOR: LOADER | 23.68 | 12.36 | 36.04 |
| OPERATOR: HYDROSEEDER | 10.79 | — | 10.79 |
| OPERATOR: GRADER/BLADE | 17.00 | — | 17.00 |
| OPERATOR: DRILL | 14.85 | — | 14.85 |
| OPERATOR: CRANE | 25.34 | — | 25.34 |
| OPERATOR: BULLDOZER | 15.83 | — | 15.83 |
| OPERATOR: BROOM/SWEEPER | 12.00 | — | 12.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 16.06 | — | 16.06 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 18.42 | — | 18.42 |
| OPERATOR: ASPHALT SPREADER | 15.80 | — | 15.80 |
| LABORER: PIPELAYER | 14.33 | — | 14.33 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 13.08 | — | 13.08 |
| LABORER: COMMON OR GENERAL | 10.83 | — | 10.83 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 14.68 | — | 14.68 |
| IRONWORKER, STRUCTURAL | 18.35 | — | 18.35 |
| IRONWORKER, REINFORCING | 14.22 | — | 14.22 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | 20.00 | — | 20.00 |
| HIGHWAY/PARKING LOT STRIPING: OPERATOR (STRIPING MACHINE) | 13.25 | — | 13.25 |
| FENCE ERECTOR | 12.15 | — | 12.15 |
| ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION | 20.40 | — | 20.40 |
| CEMENT MASON/CONCRETE FINISHER | 14.51 | — | 14.51 |
| CARPENTER, INCLUDES FORM WORK | 16.68 | — | 16.68 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | 14.08 | — | 14.08 |
| PAINTER (BRUSH AND ROLLER) | 18.00 | — | 18.00 |
| OPERATOR: LOADER | 15.45 | — | 15.45 |
| OPERATOR: CRANE | 24.21 | 6.79 | 31.00 |
| OPERATOR: BULLDOZER | 17.00 | 1.92 | 18.92 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 16.36 | — | 16.36 |
| LABORER: PIPELAYER | 14.17 | — | 14.17 |
| LABORER: COMMON OR GENERAL | 12.11 | — | 12.11 |
| ELECTRICIAN | 22.88 | 7.19 | 30.07 |
| CEMENT MASON/CONCRETE FINISHER | 15.23 | — | 15.23 |
| CARPENTER, INCLUDES FORM WORK | 16.47 | 1.93 | 18.40 |