Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

Davis-Bacon rates — Colbert County, Alabama

Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.

Pick the construction type that matches your contract, not the highest rate. Building, Residential, Highway and Heavy are separate determinations with different rates, and using the wrong one is a common reason a certified payroll comes back rejected. Where your trade appears under several classifications the choice between them is a judgement call — the plainest match is usually right, and the contracting officer can confirm it.
Building
AL20260100 rev 1 · 05/18/2026 · 28 classifications
ClassificationBase rateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR31.1016.4047.50
BOILERMAKER34.2123.9258.13
CARPENTER30.2614.7845.04
POWER EQUIPMENT OPERATOR: FORKLIFT32.5714.0546.62
POWER EQUIPMENT OPERATOR: CRANE32.5714.0546.62
LABORER: COMMON OR GENERAL18.136.7524.88
PLUMBER32.5019.3351.83
PIPEFITTER32.5019.3351.83
SPRINKLER FITTER (FIRE SPRINKLERS)33.7822.0355.81
SHEET METAL WORKER (INCLUDING HVAC DUCT WORK)30.5020.4950.99
TRUCK DRIVER: DUMP TRUCK13.60—13.60
TILE SETTER20.00—20.00
ROOFER13.66—13.66
PAINTER: SPRAY14.31—14.31
PAINTER (BRUSH AND ROLLER)15.935.6821.61
OPERATOR: ROLLER14.001.7815.78
OPERATOR: LOADER14.69—14.69
OPERATOR: GRADER/BLADE17.520.8918.41
OPERATOR: BULLDOZER18.59—18.59
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE17.01—17.01
LABORER: PIPELAYER13.88—13.88
LABORER: MASON TENDER - CEMENT/CONCRETE13.24—13.24
LABORER: MASON TENDER - BRICK11.00—11.00
IRONWORKER, STRUCTURAL21.776.7728.54
IRONWORKER, REINFORCING22.867.9430.80
ELECTRICIAN19.054.3023.35
CEMENT MASON/CONCRETE FINISHER17.15—17.15
BRICKLAYER19.81—19.81
Residential
AL20260040 rev 1 · 05/18/2026 · 20 classifications
ClassificationBase rateFringeTotal
TRUCK DRIVER9.86—9.86
SHEET METAL WORKER12.82—12.82
ROOFER, INCLUDES BUILT UP, METAL, SHAKE & SHINGLE, AND SINGLE PLY ROOFS10.94—10.94
PLUMBER12.51—12.51
PAINTER11.00—11.00
OPERATOR: LOADER (FRONT END)12.52—12.52
OPERATOR: BULLDOZER15.00—15.00
OPERATOR: BACKHOE11.20—11.20
LABORER: PIPELAYER9.00—9.00
LABORER: MASON TENDER - CEMENT/CONCRETE7.88—7.88
LABORER: LANDSCAPE8.57—8.57
LABORER: COMMON OR GENERAL8.00—8.00
IRONWORKER, STRUCTURAL16.363.4019.76
IRONWORKER, ORNAMENTAL10.46—10.46
FLOOR LAYER: CARPET12.03—12.03
ELECTRICIAN, INCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS9.85—9.85
DRYWALL HANGER10.00—10.00
CEMENT MASON/CONCRETE FINISHER12.67—12.67
CARPENTER, INCLUDES FORM WORK (EXCLUDES DRYWALL HANGING)10.89—10.89
BRICKLAYER12.27—12.27
Highway
AL20260151 rev 1 · 05/18/2026 · 36 classifications
ClassificationBase rateFringeTotal
ELECTRICIAN30.9010.3441.24
POWER EQUIPMENT OPERATOR (DRILL)24.159.3633.51
TRUCK DRIVER: WATER TRUCK13.71—13.71
TRUCK DRIVER: SEMI-TRAILER TRUCK15.56—15.56
TRUCK DRIVER: LOWBOY TRUCK17.01—17.01
TRUCK DRIVER: FLATBED TRUCK15.00—15.00
TRUCK DRIVER: DUMP TRUCK14.34—14.34
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER13.64—13.64
TRAFFIC CONTROL: FLAGGER11.48—11.48
PAINTER (BRUSH AND ROLLER)15.971.2717.24
OPERATOR: SCRAPER13.30—13.30
OPERATOR: ROLLER16.43—16.43
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)17.64—17.64
OPERATOR: OILER16.83—16.83
OPERATOR: MILLING MACHINE14.76—14.76
OPERATOR: MECHANIC24.71—24.71
OPERATOR: MATERIAL TRANSFER VEHICLE16.60—16.60
OPERATOR: LOADER16.11—16.11
OPERATOR: GRADER/BLADE17.77—17.77
OPERATOR: CRANE23.49—23.49
OPERATOR: BULLDOZER21.27—21.27
OPERATOR: BROOM/SWEEPER13.11—13.11
OPERATOR: BOBCAT/SKID STEER/SKID LOADER13.88—13.88
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE19.97—19.97
OPERATOR: ASPHALT SPREADER16.02—16.02
LABORER: PIPELAYER13.49—13.49
LABORER: MASON TENDER - CEMENT/CONCRETE14.62—14.62
LABORER: COMMON OR GENERAL14.51—14.51
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR15.71—15.71
LABORER GRADE CHECKER14.89—14.89
IRONWORKER, STRUCTURAL22.40—22.40
IRONWORKER, REINFORCING18.02—18.02
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER (LINE STRIPING TRUCK)14.55—14.55
HIGHWAY/PARKING LOT STRIPING: OPERATOR (STRIPING MACHINE)20.94—20.94
FORM WORKER14.27—14.27
CEMENT MASON/CONCRETE FINISHER15.69—15.69
Heavy
AL20260117 rev 1 · 05/18/2026 · 8 classifications
ClassificationBase rateFringeTotal
CARPENTER (INCLUDES FORM WORK)30.2614.7845.04
TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES12.562.1214.68
OPERATOR: LOADER, INCLUDES WATER SEWER LINES17.642.1419.78
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE17.18—17.18
LABORER: PIPELAYER, INCLUDES WATER SEWER LINES14.65—14.65
LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES13.403.6017.00
ELECTRICIAN19.56—19.56
CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES13.71—13.71
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.